Proceedings of the Korea Concrete Institute Conference
/
2005.11a
/
pp.307-310
/
2005
The PCS system, which consists of precast concrete column and steel beam, has been under development. Experimental test has been carried out to investigate the structural performance of the system under earthquake. Two types of test specimens of beam-column joints are designed in order to compare the performances. One is the system with reinforced concrete slab and the other is without slab. It is found that the system with slab could satisfy all of the requirements from ACI Criteria such as strength, stiffness degradation and energy dissipation capacity except initial stiffness. It is also investigated that the stiffness of the joint is belong to rigid joint type according to Bjorhovde criterion. And it is observed that the partial-composite system between beam and slab is more effective than full-composite system in the respect of the energy dissipation capacity of the system.
Precast prestressed double-tee slab may be designed by the PCI Design Handbook. It is based on the bridge construction and is required for reorganization for the use of buildings in the domestic construction environments. Much enhanced sections are developed from the reforming process on the determined design factors in the previous experimental works on double tees. Pre-determined shape, reinforcement detail, and 5000 psi concrete strength can not be expected as the best solution for the domestic construction requirements because large amount of use on that systems are anticipated. Flexural tests are performed on four full-scale 12.5m proto-type models, "least depth double tee", which are resulted from the optimization process. Domestic superimposed live load regulation, domestic material properties which is available to product, building design requirements and economy in construction are considered as the main factors to establish. the first two sections are double tee section for 1.2 ton/$\m^2$ market live load with straight and one-point depressed strands and the second two are for 0.6 ton/$\m^2$ parking live load with those strand types. All of the specimens tested fully comply with the flexural strength requirements as specified by ACI 318-95. However, the research has shown that following improved considerations are needed for better result in practice. The locations and method of connection for the lowest bottom mild bar, connection method between precast and cast-in-place concrete, and dap-end reinforcement are need to be improved.
Wu, Xiangguo;Xia, Xinlei;Kang, Thomas H.K.;Han, Jingcheng;Kim, Chang-Soo
Steel and Composite Structures
/
v.29
no.4
/
pp.545-555
/
2018
This study aimed to investigate the flexural behavior of precast concrete (PC) wall - steel shoe composite assemblies with various dry connection details at mid-span. Flexural tests were performed for five scenarios. Test parameters included the width of test specimens, arrangement of steel shoe connectors, and use of structural adhesive or waterproof tape at the mid-span joint. The test results showed that the PC wall - steel shoe composite assemblies joined at mid-span showed flexural damage patterns combined with rotational deformation, and the structural performance was satisfactory regardless of the arrangement of steel shoe connectors. Considering the two deformation components (flexural deformation by bending and rotational deformation due to joint opening), a theoretical model was proposed to analyze flexural strength and joint opening, and the simple model gave good predictions with acceptable accuracy.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.34
no.9
/
pp.11-18
/
2018
As the height of the modular buildings increases, their stability becomes more and more dependent on the core. All traditional construction methods in structural concrete and steel can be utilized for cores in modular buildings but a core system with dry connection is more desirable to complete a greater degree of factory finish and faster erection of modular buildings. In order to do that, the hybrid PC(precast concrete) panel, which has a pair of C-shaped steel beams combined at the top and bottom of a concrete wall, was developed, In this study the cyclic lateral loading test on the hybrid PC panel is carried out and the panel configurations are examined to enhance the structural performance in comparison with the RC wall. Experimental results show that the strength of hybrid PC panel is about 70% of thar ot RC wall and the anchorage of vertical reinforcing bar welded to C-shaped steel beam needs to be improved.
Proceedings of the Korea Concrete Institute Conference
/
2005.11a
/
pp.21-24
/
2005
In this study, new methods of PC panel connection using 'ㄷ'type steel connection is proposed for highly seismic zone. A study was carry out to investigate the connection behavior subjected to cyclic inelastic loading. Three planar type and two T type PC wall will be tested. The variables will be examined were the shear reinforcement existence of top and bottom walls. The specimens will be tested only reverse cyclic loading in accordance with a prescribed displacement history. To transfer the shear strength shear key set up between top and bottom wall. Failure mode, behavior, ductility and energy dissipation capacity of the specimens constructed by new connections wll be compared with those of monolithic walls and Han's(Han, Jun Hee, Seoul National University) model.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.1
/
pp.19-29
/
2015
As the half-depth precast concrete decks are increasingly applied to the construction sites, researches on connection details have been increased. For design of concrete bridge deck with half-depth precast panels, it is required to provide appropriate details of transverse loop joints between panels. In this paper, the structural performance of precast decks was evaluated to investigate continuity of the proposed loop joint details. From the results, the validity of the joints for the continuity of deck was observed in the aspect of flexural strength and crack control. The ultimate strength increased 1.52 times as the reinforcement spacing in the joint was reduced. In terms of crack control, direct crack width calculation for the loop joint showed appropriate results comparing with measured crack width.
Lee, Dong-Joo;Lee, Ju-Dong;Oh, Tae-Soo;Kang, Thomas H.K.
Journal of the Korea Concrete Institute
/
v.26
no.2
/
pp.125-133
/
2014
In this study, experimental research was carried out to investigate the seismic and structural performance of precast concrete exterior beam-column joints using bolt type connection and prestressing method. A total of five full-scale exterior beam-column joints were constructed and tested under reversed cyclic loading, controlled by displacement. Results of the test are as follows: Energy dissipation capacity and pinching phenomenon of PC beam-column joints showed disadvantageous behavior compared to RC beam-column joints. However, drift capacity of the PC joint was excellent. Also, yield mechanism concentrated on embedded nuts was suitable as an exterior beam-column joint of lateral load resistance frame. Additional application of prestressing method was also very effective to control excessive pinching and cracking in the joint region, and thus improved an overall seismic performance of the PC joint.
Recent developments in multi-storey buildings for residential purpose have led to the extensive use of shear walls for the basic structural system. When the coupled shear wall system is used, joined together with cast-in-place concrete or mortar (or grout), the function of the continuous joints is a crucial factor in determining the safety of L.P. Precast concrete shear wall structures, because the function of the continuous joints(Vertical wall to wall joints) is to transfer froces from one element(shear wall panel) to another, and if sufficient strength and ductility is not developed in the continuous joints, the available strength in the adjoining elements may not be fully utilized. In this paper, the influence of the stiffness of vertical joints(wet vertical keyed shear joints) on the behaviour of precast shear walls is theoretically investigated. To define how the stiffness of the vertical joints affect the load carrying capacity of L.P.Precast concrete shear wall structure, the L.P.Precast concrete shear wall structure is analyzed, with the stiffness of the vertical joints varying from $K=0.07kg/mm^3$(50MN/m/m) to $K=1.43kg/mm^3$(1000MN/m/m), by using the continuous connection method. The results of the analysis shows that at the low values of the vertical stiffness, i.e. from $K=0.07kg/mm^3$(50MN/m/m) to $K=0.57kg/mm^3$(400MN/m/m), the resisting bending moment and shearing force of precast shear walls, the resisting shearing force of vertical joints and connecting beams are significantly affected. The detailed results of analysis are represented in the following figures and Tables.
Proceedings of the Korea Concrete Institute Conference
/
2001.11a
/
pp.573-578
/
2001
In order to apply a precast deck to continuous composite bridges, several experiments and analytical studies were performed. Design criterion for crack prevention should be such that it does not permit tension at the joint to occur when the service loads are applied. Details of the shear pocket for studs and material properties of filler in the pocket and the joint are very important considerations in design and construction. Combination of longitudinal prestressing methods, internal tendon and prestressing after shear connection, should be used for prevention of cracking in continuous precast deck bridges. Design guides for the determination of prestressing force are suggested.
Proceedings of the Korea Concrete Institute Conference
/
1996.10a
/
pp.508-513
/
1996
The purpose of this paper, having chosen the connection method, filled by High-strength mortar, in conncetion of PC member, is to study the mechanical behaviour and practical usage of the method. The paper estimates the connection ability of Reinforced-bar, that is, Sleeve considering the effect of Reinforced-bar's dimeter. Sleeve's length and diameter in the structural behaviour of mortar-filled connection, therefore the behaviour of Splice-Sleeve exists in concrete practically. This paper discusses the effect of the concrete in Splice-Sleeve. Also, to estimate structural behaviour in a practical wall panel, the upper and bottom wall panels are produced and the behaviour of Splice-Sleeve is discussed. And then Vertical Tie Bar being designed by using Precast method, this paper presents the various application and the practicable method using Splice-Sleeve.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.