• Title/Summary/Keyword: Pre-construction

Search Result 1,183, Processing Time 0.029 seconds

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

CFT seismic reinforcement method using diaphragm pre-assembled ㄷ-shaped column (다이어프램 선 조립 ㄷ형태 기둥을 이용한 CFT내진보강공법)

  • Woo, Jong-Yeol;Shin, Seung-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.151-152
    • /
    • 2022
  • When reinforcing an existing building with the Concrete Filled Tube(CFT) structure, it is impossible to form a diaphragm inside with the existing method. Therefore, in this study, a construction method was proposed so that the internal diaphragm could be welded on four sides by using a slot to transmit force.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

A Comparative Analysis of Supplier's Profitability According to the Different Sales Timing in Apartment Housing (공동주택의 분양시기 변화에 따른 공급자의 수익성 비교 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.25-34
    • /
    • 2012
  • It has been five years since the Post-Construction Sale System of Housing was introduced. The purpose of this study is to identify objectives and effects of the Post-Construction Sale System of Housing and analyze change of profitability at different sales time from a supplier's point of view. Apartment buildings construction projects performed in Seoul are used for the case study. The present value of sales revenues, sensitivity and the present value of expected sales prices are analyzed. According to the findings, first, profits made from a Pre-construction sales system was 5.1%~6.2% higher than those from a Post-construction sales system. Among four plans of a Pre-construction sales system (A, B, C and D plan), sales revenue from the A plan, which takes a deposit at the time of starting construction, was the greatest. Second, increase of the rate of discount and decrease of sales revenues are in direct proportion. The bigger rate of discount leads actual reduction of sales revenues. Third, for the present value of sales revenues reflecting change in basic model construction cost, a Pre-construction sales system showed a little higher than that of a Post-construction sales system by approximately 2%. It should be known that this study suggests profitability of Pre-and Post-construction sales system by clearly measuring them in the supplier's point of view and calculates sales revenues, considering change of a sale price following change of sales time.

Exploring the Epistemic Goals and Features of Biology-Related Knowledge Construction Activities Shaped by Pre-Service Elementary Teachers as Epistemic Agents (초등 예비교사가 인식적 행위주체로서 고안한 생명과학 관련 지식 구성 활동의 인식적 목표 및 특성 탐색)

  • Ha, Heesoo
    • Journal of The Korean Association For Science Education
    • /
    • v.41 no.1
    • /
    • pp.47-57
    • /
    • 2021
  • This study aims to explore the epistemic goals that pre-service elementary teachers can construct in their biology-related knowledge construction activities, how these goals are constructed, and how the shaping of the knowledge construction activities around the goals was afforded or constrained. The research participants were 26 pre-service teachers, divided into 11 groups of two or three to engage in the activity. Their discussions and products were collected and used as data for this study. The analysis revealed that the teachers constructed three types of epistemic goals: making sense of natural phenomena, proposing the most effective course of action, and proposing solutions to problems based on their causes. Construction of different types of goals depended on the conclusions the pre-service teachers expected to draw based on the explored natural phenomena. It was found that the elicitation of the pre-service teachers' epistemic goals could facilitate their shaping of the knowledge construction activity as an evidence-based justification. The participants planned the construction of mechanistic explanations of natural phenomena with the epistemic goals of 'making sense of natural phenomena' or 'proposing solutions to problems based on their causes.' However, enacting their knowledge construction plans with sophisticated epistemic features was constrained due to the limited resources available. This study can contribute to developing instructional strategies that facilitate learners' epistemic agency and addressing epistemic agency in the development of pre-service teacher education methods.

Barriers of CM Performance during Pre-Construction Stages in Private CM Projects (민간 CM사업 시공이전단계 CM성과 저해요인 분석)

  • Han, Jae Hoon;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.17-26
    • /
    • 2017
  • The sustainable growth of Construction Management(CM) market depends on clients'acceptance from positive project outcomes of CM services. Achieving the positive outcomes requires CM firms'competency and efforts. Equally, it is critical to understand and overcome barriers of CM performance, which cause inefficiencies and under-performance of CM services. The objective of the study is to identify and discuss the barriers of CM performance during pre-construction stages in private CM projects based on the FMEA technique. Major findings basically suggest that clients and CM firms have roles to play, individually and collaboratively, in order to improve CM performance by eliminating performance barriers.

A Novel Numerical Method for Considering Friction During Pre-stressing Construction of Cable-Supported Structures

  • Zhao, Zhongwei;Liang, Bing;Yan, Renzhang
    • International journal of steel structures
    • /
    • v.18 no.5
    • /
    • pp.1699-1709
    • /
    • 2018
  • Suspen-dome structures are extensively used due to their superiority over traditional structures. The friction between cable and joints may severely influence the distribution of cable force, especially during the pre-stressing construction period. An accurate and efficient numerical method has not yet been developed that can be used for estimating the influence of friction on cable force distribution. Thus, this study proposes an efficient friction element to simulate friction between cable and joint. A flowchart for estimating the value of friction force is introduced. These novel numerical methods were adopted to estimate the influence of friction on cable force distribution. The accuracy and efficiency of these numerical methods were validated through numerical tests.

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

DESIGN AND USE OF BUILDING INFORMATION MODELS FOR PREPLANNING COMMERCIAL BUILDING CONSTRUCTION ACTIVITIES

  • Thomas M. Korman
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.274-278
    • /
    • 2013
  • Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.