FRPs have been used widely and demonstrated in the field of aero industries etc., and began to be used as new construction materials of civil structures. Pre-stressing tendons, reinforcing bars etc. are all examples of the many diverse applications of FRP in new structures. Especially, 40 of all-FRP bridges were reported. The reason why FRP composites were used fur construction materials of civil structures, has been that the working time and the cost of maintenance can be reduced because of the effect of their lightness and durabilities. The purpose of this paper is to report the examples of the many diverse applications of Fiber Reinforced Plastic in construction materials of civil structures.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.11a
/
pp.120-121
/
2021
This study examines the performance of the pre-treatment process system to use CGS, a by-product generated in IGCC, as a concrete fine aggregate for construction materials, on the quality of CGS fine aggregate. As a result of the analysis, it is judged that the quality of fine aggregates of CGS can be improved at both density, absorption rate, and 0.08mm body passage amount after the hydroelectric screening process using water as a medium during the pretreatment process. It is believed that it can be used as basic data for national standard certification of CGS fine aggregates in the future.
We conducted a Tunnel Seismic Prediction (TSP) survey in a spillway tunnel at Juam Dam to predict the locations of major discontinuities ahead of the tunnel face. We compared the results of the TSP survey with those from pre-construction inspections (including a surface resistivity survey and borehole investigations) as well as with direct tunnel-face mapping during excavation. The TSP method predicted the locations of major fracture zones that were unnoticed in the pre-construction inspections. The reinforcement patterns planned on the basis of pre-construction inspections were changed on the basis of the TSP results. The results demonstrate that TSP surveys are a cost-effective and reliably accurate method of predicting the locations of fracture zones. Although the TSP method has some limitations, these results suggest that the method is generally useful for predicting geological conditions prior to tunnel face construction.
Before and after the test constructions, and after an 11-month hiatus from the pilot pile installations, the in-situ tests (CPT, SPT) were carried out at the ground adjacent to the noise- and vibration-free screw concrete piles installed by 2 kinds of construction methods (i.e., the toe-jetting shoe type, the pre-digging type). In the toe-jetting shoe type construction methods, after construction, the soil strength within 3.5D (where, D = pile diameter) from the pile center decreased greatly by about 46% of the original ground and, after an 11-month hiatus, a strength recovery adjacent to the piles appeared about 71% of the original ground. In the pre-digging type construction methods, a strength recovery adjacent to the piles appeared 100% of the strength of the original ground.
Journal of the Korea Organic Resources Recycling Association
/
v.8
no.4
/
pp.121-128
/
2000
Landfill and lysimeter experiments were conducted to estimate the optimum air injection method for the degradation of waste in landfill and the pre-stabilization. Continuous injection with low pressure and quantity can be effective for pre-stabilization of old landfill due to the lower contents of volatile solids in landfill. Air injection and landfill gas (LFG)extraction showed that the SVE (Soil Vapor Extraction) effect by air ventilation was more significant than the biodegradation of organics. Theses results suggested that they could accelerate the biological stabilization of organic waste in landfills. It is also expected that they would reduce the problems including gas emission during the landfill mining, separation and/or transportation to such levels that might be discharged directly to the atmosphere or with minimal treatment, if required.
Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.234-237
/
2003
The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.
The Journal of Economics, Marketing and Management
/
v.12
no.2
/
pp.11-18
/
2024
Purpose: The purpose of this study is to suggest the activation plan of the post-construction sales through the results of a survey on the perception of Seoul citizens and experts. Research design, data and methodology: The purpose of this study is to suggest the activation plan of the post-construction sales through the results of a survey on the perception of Seoul citizens and experts. Results: According to a survey of Seoul citizens' perceptions, 76.7% of Seoul citizens were well aware of post-construction sales and recognized that post-construction sales would reduce pre-sale speculation and confusion in the real estate market. Second, 73.6% of Seoul citizens were willing to buy houses through post-construction sales, and third, 79.6% of Seoul citizens recognized that a post-sale system was necessary. Experts' opinions generally responded to the expansion of the introduction of post-construction sales, saying, 'It is necessary for both the public and the private sectors'. Second, while experts say that there are also positive effects, negative effects such as polarization centered on large corporations, an increase in sales prices, and a decrease in housing supply are also concerned. Third, experts responded that 'diversification of financing methods' is the most important task in revitalizing the post-sale system. Conclusions: The policy implications are that it is necessary to mandate the post-construction sales in the long term, and that the quality assurance system needs to be supplemented even if the sale is promoted post-construction sales. In addition, private participation is essential to revitalize the post-construction sales, and government support such as initial financing, low-interest rates, and various financing measures should be sought to expand private participation.
Journal of Construction Engineering and Project Management
/
v.8
no.2
/
pp.17-33
/
2018
This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.
Journal of the Korea Institute of Building Construction
/
v.8
no.3
/
pp.85-91
/
2008
Out of all the nondestructive test (NDT) methods, the pullout test is one of the most reliable techniques for estimating the strength of concrete under construction. However the pullout test inevitably produces significant surface damage because of the inherent test mechanism and costs too much for using measurement devices. In the view of construction engineers and inspectors, the main purpose of NDT methods for concrete is to verify whether the concrete strength of structure members exceeds the target strength or not. In this paper, a new pullout test method, which involves a pre-installed breaking bolt, with pre-determined breaking torques corresponding to the target strength of concrete, is introduced with related test data. The three types of test, the rebound hammer test, the pullout test, and the new pullout test with breaking bolt, were carried out on wall specimen with three types of concrete strengths. Our results show that concrete strength as evaluated by the pullout test with breaking bolt was similar with cylinder test results. Therefore it can be said that the new pullout test with breaking bolt is a useful method for checking the concrete strength without any surface damages in construction site.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.