• Title/Summary/Keyword: Practical management plan

Search Result 472, Processing Time 0.024 seconds

A PRACTICAL HUMAN RESOURCE MANAGEMENT PLAN FOR FOREIGN CONSTRUCTION WORKERS

  • Seung-Heon Han;Eui-Jae Jin;Sang-Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1216-1222
    • /
    • 2005
  • A shortage of construction field workers has been a serious problem, both in the developed and in the developing countries. As a solution for conquering this problem, these countries import foreign laborers from nearby less-developed countries. While this contributes to lessening the labor deficiency, foreign workers are relatively inefficient in productivity and are often exposed to the cross-cultural risks due to cultural differences, communication difficulties, different work ethics and customs, etc. Despite these facts, construction firms do not well address these issues and are lagged in establishing an appropriate management strategy against it. This paper presents a practical management plan for foreign construction workers through Focus Group Interviews (FGI) and survey investigation. On this basis, this study examines the level of awareness and important managerial aspects of the issue of foreign laborers. Finally, it suggests a cross-cultural and ready-to-use practical human resource management plan for facilitating the foreign worker's productivity.

  • PDF

A study on the practical Systems Engineering Management Plan for the LRT Project (경량전철사업을 위한 실용적 SEMP 개발에 관한 연구)

  • Choi, Yo-Chul;Han, Seok-Yoon;Cha, Gi-Ho;Chung, Su-Young;BaeChul, Joon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.247-254
    • /
    • 2011
  • This paper is a study on the practical Systems Engineering Management Plan(SEMP) for the LRT Project. A SEMP shall be developed and applied to define and manage the systems engineering activities during the beginning of LRT Project. This paper is addressed contents and description of the practical systems engineering management plan based on the existing practices about system engineering management plan in LRT Project domain as well as the systems engineering standard as MI-STD 499A, IEEE 1220 etc. In the early stage of a LRT Project, An acquirer should provide a Systems Engineering Plan(SEP), and a contractor should summit a Systems Engineering Management Plan as the SEP in proposal. This addressed the SEMP as an aspect of the system and sub-systems supplier to systematically and effectively accomplish the systems engineering activities in LRT Project generally.

  • PDF

Design of Accelerated Life Test Plans for the Lognormal Failure Distribution under Intermittent Inspection (대수정규분포와 간헐적 검사하에서 가속수명시험방식의 설계)

  • Seo, Sun-Keun;Cho, Ho-Sung
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.25-43
    • /
    • 1996
  • This paper presents the optimal and practical constant-stress accelerated life test plans for the lognormal lifetime distribution tinder assumptions of intermittent inspection and Type-I censoring. In an optimal plan, the low stress level and the proportions of test units allocated at each stress are determined under given inspection scheme and number of inspections such that the asymptotic variance of the maximum likelihood estimator of a certain quantile at use condition is minimized. Although the practical plan adopts the same design criterion, it involves three rather than two overstress levels in order to compromise the practical deficiencies of the optimal plan. Computational experiments are conducted to choose an allocation plan and a inspection scheme of the practical plan and to compare with test plans over a range of parameter values.

  • PDF

Establishment on Management Plan of Environmental Noise with Noise Map (소음지도를 활용한 환경소음 관리계획 수립)

  • Sun, Hyosung
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.

A Study on the Development of Safety Management Checklist Using Accident Case adjacent to Railway Operation (철도운행선 인접공사 사고분석과 체계적인 체크리스트 개발 등 안전대책 수립에 관한 연구)

  • Ryu, Sang-Hwan;Yum, Byeoung-Soo;Gal, Won-Mo
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.10
    • /
    • pp.63-72
    • /
    • 2018
  • Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.

Practical Project Behavior Management Methods for Large-scale IT Projects (대규모 IT 프로젝트를 위한 실용적 행태관리 방안)

  • Kim, Min-Seon;Song, Sung-Hwan;Kim, Yong-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4897-4911
    • /
    • 2015
  • Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.

Developing and Implementing Practical Problem Based Lesson Plan to Improve Self-Leadership Skills -Focusing on the Unit of 'Youth's Self Management' in Middle School Technology - Home Economics- (셀프리더십 향상을 위한 실천적 문제 중심 가정과 교수-학습 과정안 개발 및 적용 - 중학교 기술.가정 교과의 '청소년의 자기관리' 내용을 중심으로 -)

  • Kim, Eun-Jong;Lee, Yon-Suk
    • Journal of Korean Home Economics Education Association
    • /
    • v.21 no.4
    • /
    • pp.35-54
    • /
    • 2009
  • The purpose of this study is to develop practical problem based lesson plans on youth's self management and to analyze it's effect self-leadership skill of middle school students. The contents of the middle school Home Economics Technology textbooks and new curriculum revised in 2007 were analyzed. Based on these analyses 6 practical problem based lesson plans on youth's self management were developed. The topics in the lesson plan were as follows: 'Improving Self Identity', 'Expressing Self', 'getting the Life Goals', 'Importance of Time Management', and 'Time Management Skills'. The second grade middle school students in Goyang City as an experimental group were taught by practical problem based lesson plans. After the experiment, the changes in self-leadership skills of students were analyzed using paired t-test. The significant improvements of self leadership skills such as communication skills, learning skills and group management skills were found in the experimental groups of students. Thus, the following conclusion is made that the practical problem based lesson could be one of the useful methods for students to develop self-leadership skill.

  • PDF

Study of shortest time artillery position construction plan (최단시간 포병진지 구축계획 수립을 위한 연구)

  • Ahn, Moon-Il;Choi, In-Chan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.6
    • /
    • pp.89-97
    • /
    • 2016
  • This paper addresses the problem of the construction planning of artillery positions, for which we present an optimization model and propose a heuristic algorithm to solve problems of practical size. The artillery position construction plan includes the assignment of engineers to support the artillery and the schedule of the support team construction sequence. Currently, in the army, managers construct the plan based on their experience. We formulate the problem as a mixed integer program and present a heuristic that utilizes the decomposition of the mixed integer model. We tested the efficacy of the proposed algorithm by conducting computational experiments on both small-size test problems and large-size practical problems. The average optimality gap in the small-size test problem was 6.44% in our experiments. Also, the average computation time to solve the large-size practical problems consisting of more than 200 artillery positions was 79.8 seconds on a personal computer. The result of our computational experiments shows that the proposed approach is a viable option to consider for practical use.

Tightened-Normal-Tightened Group Acceptance Sampling Plan for Assuring Percentile Life

  • Aslam, Muhammad;Azam, Muhammad;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.390-396
    • /
    • 2012
  • The present paper extends the idea of tightened-normal-tightened sampling scheme to group acceptance sampling plans under the time truncated life tests. We consider three famous distributions that are widely used in the area of reliability such as the generalized exponential distribution, the Weibull distribution, and the Birnbaum-Saunders distribution in the proposed sampling plan. The plan parameters are determined such that the producer's risk and the consumer's risk are satisfied at the specified median life. Extensive tables showing plan parameters are provided at various values of the experiment time and the consumer's risk for each of three distributions for the practical use. Some examples are given to illustrate the procedure of the proposed plan.

A Study on the Student Guidance at Home Management House (가정관리실습관에 있어서의 학생지도에 관한 연구 - 서울 시내모여자대학교대상-)

  • 김복길
    • Journal of the Korean Home Economics Association
    • /
    • v.12 no.34
    • /
    • pp.679-697
    • /
    • 1974
  • I. Preface A. Establishment. There are many psycological and physiological difficulties that students have made practical application to a building site of 600 pyung and a structure of 65 pyung each sixteen students in the Home Management House, but there exists problem in students apprentice and management of professors. B. Purpose of study This research aim to seek a high degree of efficiency approach in investigating, studying and analyzing factors of the problem in Home Management which have been faced in women colleges in seoul. C. Content of study. This study is aim at finding out the problems including facilites, system, guiding principle, working bottleneck and administrative problem in making practical application of Home Management. II. A plan and method of study A. This subject of statiscal research is 616 women students in senior year from september 27 1970 to October 31 1974. The rate of collection of questionnaire is 100 percent. B. The Method of study is devised through refering documents, interview with students, questionnaire and observation. III. Result of study Of the total of 29 university in seoul, 24 Universities have its Course of Home Economic among which only 12 have Home Management for making practical application. Home Management House for making practical application is located mainly in campus but some of them exceptimally are in outside university. Students practice mainly at civilzed resident, apartment, bangalow so forth, and demention of which occupies approxiamtely 50-600 pyung (land) and 20-70 pyung (Building). A member with 4 or 20 students make practical application from 10 days to 3 months. A member consists of students and assistant teacher, and practice site classifies into living school for Professors living, and another school for Professors and assistant teachers. Answer to a questionnaire. 616 students answer to a questionnaire. 49 Perfect of 616 students like to have a member with 12 students like to have a member with 12 students, 38 percent student a member with 16 students. About the period of making practical About the period of making practical application, 76 percent students like to have two or three week period. 19 percent students think it a short period and 4 percent students think it a long period. There is none who thinks 25 day period day period to be short. About making practical application, 66 percent of 616 students feel uneasy, 40 percent students feel lack of sleep and tired. Students take a pleasure in having a conversation with their friends, inviting their mother, having dinner-party and birthday party. 77 percent students want to invite their father and 67 percent students want to invite their boy-friends. It is hard to have a good personal relation about the great the result of practice, students acknowledge themselves that they have learned about Cautiousness and they are sure of good Home Manager. There are 9 difficult problems during the period. IV. Summary discussion a. Many problems come from having a number of students. b. Students feel tired with their practice if over three weeks. No Matter how good a plan is, it useless if students can't adapt themselves to it. Suggestions 1) it is good to have a member with 5 or 6 students, and it is suitable to have two or three week period, and to have an area of 20 or 30 pyung. 2) it's proposed a profess or to live together in making practical application of Home Management 3) it is proposed a professor to have a sure T.O. and to be treated better.

  • PDF