• 제목/요약/키워드: Power system planning

검색결과 664건 처리시간 0.028초

시장참여자의 이익을 고려한 최적 전력시스템계획 (Optimal Power System Planning Considering Profit Of Market Participants)

  • 손민균;심헌;김진오;정현수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.485-486
    • /
    • 2007
  • In the deregulated power market, suppliers, consumers and transmission companies try to maximize their profits by economical behaviors. In particular, generating companies like to sell more electricity for the revenue. Their situations will lead to various power system planning as optimal solutions for each supplier. In this paper, fundamental approaches of optimal power system planning under market positions of generating company are presented. The profit-maximizing approaches are modeled mathematically. By this analysis, each optimal planning is proved in risk of cost and monetary risk will be the economical signal for participants.

  • PDF

전력수급계획 및 운용해석 종합시스템 개발 (Development of the Integrated System for Power System Operational Planning an)

  • 박시우;윤용범;남재현;안양근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1042-1045
    • /
    • 1998
  • The main purpose of HITES(Highly Integrate Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The integrated energy system can be utilized to supply a stable electric power and operate KEPCO power system facilities economically. This system will be put into operation in 1999. This paper describes the main feature of the HITES, system main functions, numerical methods adopted this system, and network configuration.

  • PDF

스마트 에너지 시스템 최적설계 및 적용사례 (Optimal Planning of Smart Energy System and its Applications)

  • 김기영;서석호;성진일;서현욱;오시덕;곽호영
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.3359-3364
    • /
    • 2007
  • The smart energy system is the integrated power system in which the power components including central station generation, distributed generation, renewable power generation, energy storage, and communications and controls are complexly connected with each other. In smart energy system, it is very important how to configure the diverse power generations and how to determine the operation mode of the chosen components with economic feasibility. In this study, we introduce the optimal planning method based on both economic feasibility and load profiles and its applications for the smart energy system in apartment. This method was considered very useful to determine the configuration and to decide the optimal operation mode of the smart energy system.

  • PDF

전력수급 종합시스템의 현황분석 및 전력산업 구조개편에 따른 전망 (Highly Intergrated Total Energy System and its Application in a Competitive Electricity Market)

  • 김정훈;추진부
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1501-1505
    • /
    • 1999
  • Highly Integrated Total Energy System for system operational planning and analysis is a totally integrated computerized system for various parts of power system operation planning and power system analysis. It is developed by KEPCO for about 8 years, named HITES. Nowadays restructuring, deregulation, privatization and competition of electricity market is introduced in the world. This paper describes HITES application for two typical models of a competitive electricity market.

  • PDF

선형계획법을 이용한 무효전력 설비 계획 (Reactive Power Planning Using Linear Programming)

  • 김정부;박영문
    • 대한전기학회논문지
    • /
    • 제38권10호
    • /
    • pp.805-810
    • /
    • 1989
  • This paper presents a method for planning reactive power compensation such as shunt capacitors and reacters so as to maintain bus voltage in acceptable range during steady state operation in power system. The algorithm in this paper decomposes the problem into reactive power planning module for the compensation of bus voltage and load flow module for adjusting the error resulted from the linear approximation. A planning technique is based on linear programming to minimize the amount of added reactive power compensation in each case. Transformer tap settings and generator voltages are adjusted to minimize the compensation. The constraints are the operation limits of the control variables and bus voltages. The result of one sample system is presented to confirm the practical use of the proposed algorithm.

  • PDF

수용가 전력관리시스템 개발 연구 (A Study on the Development of Industrial Power Management System)

  • 문영환;성기철;윤상현;김언충
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.550-552
    • /
    • 1995
  • Real time informations from industrial power system in operation can be used for efficient energy conservation, optimal operation of electrical equipments, and expansion planning of apparatus. Requirements for energy conservation and supplied power quality in customers are increasing significantly because of their effects on the production cost and efficiency. Thus, the development of low cost power management system which can can operate in domestic power system properly is substantially requested. In this research, operation software for real time monitoring and control system in customer power system has been developed to achieve the above purposes. The development of the operating software and related technologies are expected to be applied successfully for reducing electricity cost, enhancing power quality, determining facility expansion planning, operating optimal power system, increasing production efficiency, and reducing maintenance cost.

  • PDF

전기 무효전력비용을 고려한 조상설비계획 (Reactive Power Planning Considering Reactive Power Support Cost of Generator)

  • 이철휴;이상호;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.181-183
    • /
    • 1999
  • As one of ancillary services, voltage support and reactive power service should be compensed properly for its contribution. In this paper, a cost-based reactive power planning is presented. which minimizes the total cost of reactive power support of generators and VAR compensation facility installation. Reactive power support of generator is evaluated by the opportunity costs of reduced energy sale considering the varying SMP(system marginal price) in power market, Gradient projection method is applied to solve this reactive power planning using IEEE14 bus system.

  • PDF

A Study on Optimal Reliability Criterion Determination for Transmission System Expansion Planning

  • Tran Trungtinh;Choi Jae-Seok;Jeon Dong-Hoon;Chu Jin-Boo;Thomas Robert;Billinton Roy
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.62-69
    • /
    • 2005
  • The optimal design of transmission system expansion planning is an important part of the overall planning task of electric power system under competitive electricity market environments. One of main keys of the successful grid expansion planning comes from optimal reliability level/criteria decision, which should be given for constraint in the optimal expansion problem. However, it's very difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal transmission system expansion planning. A deterministic reliability criteria, BRR (Bus Reserve Rate) is used in this study. The optimal reliability criteria, BRR/sup */, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using IEEE-RTS.

지방정부의 독자적 농촌발전계획의 수립과 추진을 위한 조례제정에 관한 연구 (A Study on the Local Ordinance for the Rural Development Planning)

  • 윤원근
    • 농촌지도와개발
    • /
    • 제12권1호
    • /
    • pp.57-68
    • /
    • 2005
  • Since about 2000. local government has started making ordinance related to the rural development planning which is revitalizing rural area through using rural resource. But, the ordinance of local government have not any contents relating to the land use planning system that is necessary in rural development planning. According to the present local autonomy act, ordinance can not have any regulations restricting basic human right without being allowed by law. In recent, central government is considering to hand power making land use planning system over local government. This paper is to study how to expand the legislative power of local government. This study discussed on logical bases through examining disputes on legal theories, the nature of local ordinance, range of local autonomy affairs and cases of local ordinance.

  • PDF

경쟁적 전력시장에서 혼잡을 고려한 송전설비계획 기준설정에 관한 연구 (A Study on a Criterion of Transmission Planning in a Competitive Electricity Market)

  • 김종만;한석만;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권7호
    • /
    • pp.358-365
    • /
    • 2005
  • Transmission networks play an important role which transfer generated electric power to a consumer in power system operation. In a competitive environment of electric power industry, developing the technological criterions and methodologies on transmission planning is becoming new challenge to transmission system planner. The use of a locational signal and the provision of a indicative plan to control the transmission investment reasonably is very important in the viewpoint of a regulator. The main target of this study is to develop a systematic criterion of transmission expansion planning. And system congestion cost is considered. The proposed methodology was demonstrated with several case studies.