• Title/Summary/Keyword: Power substation

Search Result 627, Processing Time 0.028 seconds

Calculation of shielding range using shield wires in Myanmar 500kV Substation (차폐선을 이용한 미얀마 500kV 변전소 차폐보호범위 계산)

  • Park, H.S.;Kim, T.Y.;Cho, Y.S.;Park, C.S.;Joo, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.189-191
    • /
    • 2005
  • In the past, dramatic economical development of Korea could be achieved by well-organized 154kV power system network. Electric power Is a key Industry for the nation and industrial development. Nowadays we operates 345kV Power system with based transmission network and also we are operating 765kV power system to supply to the capital region. Currently developing countries in Southeast Asia are requiring the electric power technology to Korea so that they can acquire the source of the development-power system network. Therefore, it Is important to design transmission line and substation with appropriate methods. In this paper, a calculation and calculating process of shielding range using shield wires in Myanmar 500kV substation are reviewed according to the Myanmar 500kV power system project performed by the overseas projects section of the Korea Electric Power Corporation.

  • PDF

The Coordinate Control Method of LTC Transformer and Capacitor Banks at Distribution Substation

  • Choi, Joon-Ho;Ahn, Seon-Ju;Nam, Hae-Kon;Kim, Jae-Chul;Moon, Seung-Il;Jung, Won-Wook;Song, Il-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.3
    • /
    • pp.320-329
    • /
    • 2012
  • The Load Tap Changing (LTC) transformer and Shunt Capacitor (SC) bank are major devices for voltage and reactive power control in a distribution substation. Thus, the coordination operation of a LTC transformer and a SC bank is required to achieve better voltage and reactive power compensation at a distribution substation in the same time. This paper proposes coordinate control method of LTC transformer and SC bank to achieve better voltage and reactive power compensation and operation times of these two devices in the same time. The mathematical formulations of the proposed coordinate control method are introduced. Sample case studies are shown to verify the effectiveness of the proposed coordinate control method.

A case study on the prevention and occurrence of fault in Transmission & Substation (변전설비의 보수 정비 사례 및 고장 실태 조사 연구)

  • Lee, Seog-Kyu;Park, Hee-Woo;Kim, In-Kun;Lee, Jong-Hak;Lee, Man-Seon
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.83-85
    • /
    • 1999
  • Recently, a rapid increase of electricity demands have made Transmission & Substation device large-sized. complicated and diverse. Moreover, a rising level of customer's requirement and high growth of industry increase the reliability of electricity service. Therefore on the basis of the case study on the occurrence of fault, the prevention of defects for each device and the analyzing of the outbreak and prevention of systematic breakdown in Sin-Incheon Power Transmission Branch Office, this paper presents some important matters and suggests the method of improvement in design, construction, maintenance, and repairing the Transmission & Substation device.

  • PDF

Development of the Control System for Fast-Responding Frequency Regulation in Power Systems using Large-Scale Energy Storage Systems

  • Lim, Geon-Pyo;Park, Chan-Wook;Labios, Remund;Yoon, Yong-Beom
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.9-13
    • /
    • 2015
  • Energy storage systems (ESS) can be used to provide frequency regulation services in a power system to replace traditional frequency regulation power plants. Battery ESS, in particular, can provide "fast-responding frequency regulation," wherein the facility can respond immediately and accurately to the frequency regulation signal sent by the system operator. This paper presents the development and the trial run results of a frequency regulation control system that uses large-scale ESS for use in a large power system. The control system was developed initially for the 4 MW ESS demonstration facility in Jocheon Jeju Island, and was further developed for use in the 28 MW ESS facility at the Seo-Anseong substation and the 24 MW ESS facility at the Shin-Yongin substation to provide frequency regulation services within mainland Korea. The ESS facility in Seo-Anseong substation responds to a sudden drop in frequency via governor-free control, while the ESS facility in Shin-Yongin responds via automatic generator control (AGC).

The investigation of field condition on flood protection of substation and underground power equipment (pad-mounted transformers & switches) (수변전실 및 지중 배전기기의 침수 방지 관련 현장 조사 분석)

  • Kim, Gi-Hyun;Choi, Myeong-Il;Bae, Suk-Myong;Lee, Jae-Yong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.327-331
    • /
    • 2007
  • Inundation of substation and underground power equipment(pad-mounted transformers & switches) breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation of substation and underground power equipment, it occurs a great economic loss owing to recovery time and events of electric shock occur by inundation electrical facility. So we search the damage situation and installation situations. Therefore we propose the necessity of protection of flood at low-lying downtown and low-tying shore. This paper will be used to present a reform proposal of electrical related law about flood protection of existing power equipment.

  • PDF

Analysis of Fault Point's Distant Effect in Power Distribution System with Superconducting Fault Current Limiter (배전계통의 고장 전류 제한을 위한 초전도 한류기 적용시 고장발생 위치에 따른 영향 분석)

  • Kim, Myong-Hyon;Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.44-49
    • /
    • 2011
  • Due to increase of fault current, various superconducting fault current limiter (SFCL) are researched. We studied a power distribution system with SFCL. Along the way, we knew characteristics of fault current according to a distance from substation to fault point. Fault current is reduced by distance`s increase from substation. Also, SFCL.s effects are decreased by distance too. Therefore, we analyzed the fault current by a distance from substation to fault point when a SFCL was applied into a power distribution system. We simulated using a PSCAD/EMTDC.

A Study on the Field Test of IEC 61850 based Substation Automation System (IEC 61850 변전자동화시스템 실증시험에 관한 연구)

  • Lee, N.H.;Jang, B.T.;Kim, B.H.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.250_251
    • /
    • 2009
  • IEC 61850 based substation automation system mainly consists of human machine interface as a client and a various of IEDs as a server. Both of them should require the field testing for performance verification including IEC 61850 communication services. This means that the test can assure the interoperability of IEC 61850 based substation automation system consisted of multi vendor's products. This paper shows a research result on the field test of the IEC 61850 based HMI and IEDs. And it proposes some engineering solutions for the system implementation.

  • PDF

The Recent Trend of Constraints in Korea Power System and Analysis of the Cause of its Increasing (최근 국내전력계통 계통제약 발생현황 및 증가원인 분석)

  • Shim Jeong Woon;Bang Min Jae;Lee Jin Moon
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.3-6
    • /
    • 2004
  • 전력시장에서 예비력, 송전망 설비 유한성, 열병합발전소 열공급, 수요예측 오차, LNG, 국내무연탄의 우선소비 정책 둥에 의해 경제급전 원칙을 완벽하게 지킬 수 없다. 이로 인하여 고연료비 발전기가 제약에 의해 운전될 수밖에 없고 이 제약발전에 의해 시장가격이 상승하고 소비자 입장에서 보면 전력구입비용이 증가하게 된다. 이 논문에서는 2002, 2003년도 국내전력계통에서 발생한 계통제약 발생현황을 지역별, 월별로 분석하고 2002년 대비 2003계통제약 증가원인을 분석하였다.

  • PDF

An Investigation on the Fault Currents in 22.9 kV Distribution System Due to the Increased Capacity and Operating Conditions of Power Transformers in 154 kV Substation (154 kV 변전소 주변압기의 용량 및 운전조건이 22.9 kV 배전계통의 고장전류에 미치는 영향)

  • Cho, Seong-Soo;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.3
    • /
    • pp.302-310
    • /
    • 2008
  • In order to evaluate the nominal rating of breakers in distribution system due to the increased capacity and operating conditions of power transformers in 154 kV substation, the fault currents in distribution system were calculated by the conventional method and simulations of PSCAD/EMTDC program. Consequently, under the condition of the parallel operation of transformers, the fault currents exceed the nominal current of the breakers in some areas. Without NGR at the secondary neutral of the transformer, the current of single line-to-ground fault was bigger than that of 3-phase fault. Therefore, the results clearly show that the measures to limit the fault currents in distribution system are needed when the increased capacity of power transformers is introduced into 154 kV substation.

Conformance Testing for IEC 61850 based OCR IED (IEC 61850 기반의 OCR IED에 대한 적합성 시험방안)

  • Yu, Fei;Rim, Seong-Jeong;Choi, Myeon-Song;Lee, Seung-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.19-20
    • /
    • 2008
  • IEC 61850 is a new approach international standard which is applicable to Substation Automation System (SAS) and defines the communication between intelligent electric devices (IEDs) in the substation and the related system requirements. It already has a significant impact on the development of different devices or systems used in substation. Conformance claims and the establishment of their validity are important parts of the acceptance of systems and equipment. This paper introduces the conformance testing, mapping of IEC 61850 services and MMS services, and in case study part it gives the example of testing OCR IED.

  • PDF