• Title/Summary/Keyword: Power substation

Search Result 627, Processing Time 0.032 seconds

Developing electric railway load pattern inspection program (전철 변전소 전력부하패턴 점검 프로그램 개발)

  • Jeon, Yong-Joo;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.893-898
    • /
    • 2007
  • At present, one of the big characteristics in electric power market in korea is unique seller but in the near future competitions are expected in the market. so additional service for the electric power are expected. Also with development of IT technology, remote inspection for power usage are possible so as consumption pattern analysis. KORAIL is one of the biggest consumer in electric power market so it is necessary to investigate power consumption pattern. This paper presents electric load consumption pattern for representative substation like urban subway, high-speed train, industrial line and simulation program for electric power rate definition program based on billing system database. Base on the substation annual power usage DB data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. Through this program it is verified that we can save more then several hundred million won for a year.

  • PDF

R&D Trends of Substation Automation (변전소 종합 자동화 기술개발 동향)

  • Lee, Bong-Hee;Park, Soon-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.548-550
    • /
    • 2002
  • In this paper the domestic and worldwide trends of substation automation are described in order to cope with the coming new environment in this part On the world market of substation control it will be change from analog technology to digital technology. And the technology of a system integration relevant to a substation automation become more important than that of individual power apparatus. Therefore development of substation automation technology is needed.

  • PDF

Design of an Algorithm for the Validation of SCL in Digital Substations

  • Jang, B.T.;Alidu, A.;Kim, N.D.
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.89-97
    • /
    • 2017
  • The substation is a critical node in the power network where power is transformed in the power generation, transmission and distribution system. The IEC 61850 is a global standard which proposes efficient substation automation by defining interoperable communication and data modelling techniques. In order to achieve this level of interoperability and automation, the IEC 61850 (Part 6) defines System Configuration description Language (SCL). The SCL is an XML based file format for defining the abstract model of primary and secondary substation equipment, communications systems and also the relationship between them. It enables the interoperable exchange of data during substation engineering by standardizing the description of applications at different stages of the engineering process. To achieve the seamless interoperability, multi-vendor devices are required to adhere completely to the IEC 61850. This paper proposes an efficient algorithm required for verifying the interoperability of multi-vendor devices by checking the adherence of the SCL file to specifications of the standard. Our proposed SCL validation algorithm consists of schema validation and other functionalities including information model validation using UML data model, the Vendor Defined Extension model validation, the User Defined Rule validation and the IED Engineering Table (IET) consistency validation. It also integrates the standard UCAIUG (Utility Communication Architecture International Users Group) Procedure validation for quality assurance testing. Our proposed algorithm is not only flexible and efficient in terms of ensuring interoperable functionality of tested devices, it is also convenient for use by system integrators and test engineers.

A Study on the Substation Reliability Assessment Using Weibull Distribution (와이블분포를 이용한 변전소 신뢰도 평가에 관한 연구)

  • Kim, Gwang-Won
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.1
    • /
    • pp.7-14
    • /
    • 2002
  • In power system study, relibility assessment has been an important topic during past several decards because sudden power interruption can bring about enormous economic loss. although the size of a substation is smaller than that of generation system or transmission system, switching actions after fault(s) make reliability assessment of substation rather complex situations such as switching actions easily and permit various probability distributions in describing substation elements. Despite this ability of Monte Carlo simulation, one-parameter exponential distribution is still popular in this reliability assessment. This paper examines the characteristics of several two-parameter probability distributions, and offers new parameter decision rule based on average and variance of the target to be modelled. In case study, this paper shows the profits by using Weibull distribution which is one of two-parameter probabilistic distributions instead of exponential one.

A Study on Design of Optimal Location and Capacity of DC Substation for Mass Transit System (전철용 직류변전소의 최적 위치 및 용량 설계에 관한 연구)

  • Kim, J.K.;Lee, S.D.;Baek, B.S.;Lee, H.D.;Lee, J.Y.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11b
    • /
    • pp.398-401
    • /
    • 2000
  • This paper describes the design of optimal location and capacity of DC substation for Mass Transit System. Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we considered all of them for capacity calculation of power supply system for MTS. At first, DC-fed-traction system is introduced on an outline, a characteristics of train and fed network, and design method of substation arrangements. Optimal design procedures are described, and program for capacity calculation of the system is presented. In addition, the computer simulated results are compared with the conventional simple calculation method.

  • PDF

A Study on Loop operation of 154kV Substation Distribution line for Stable power supply (안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구)

  • Kim, Kwang-Ho;Son, Myoung-Gwon;Jeong, Jong-Chan
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF

AN ANALYSIS OF THE EXPOSED MAGNETIC FIELD BEFORE & AFTER CONSTRUCTION OF TRANSMISSION LINE & SUBSTATION (송전선로 및 변전소 건설 전.후 자계 노출량 분석)

  • Yeo, Geun-Taek;Min, Byeong-Wook;Hwang, Jeong-Ill
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1658-1659
    • /
    • 2011
  • 국민복지 증진 및 경제발전의 원동력이 되는 전력사업 수행과 관련하여 신규건설 대상지역을 중심으로 한 지역주민들의 건설반대 민원은 끊임없이 발생되고 있다. 더구나 국민생활수준 향상에 따른 사회적 욕구가 높아지고 인터넷, 휴대폰 등 대중매체가 급속도로 발달함에 따라 전력설비 건설에 대한 반감은 심화되고 있으며 전국적으로 조직화 되는 양상을 보이고 있는 실정이다. 이에 송전선로 및 변전소 건설 전 후 자계값을 실제로 측정하여 국민들에게 제시함으로써, 전력설비 건설사업의 투명성과 신뢰성을 확보하기 위하여 본 연구진행을 추진하게 되었다.

  • PDF

A Study on the Lightning Surge Protection Methods on Transmission System and Substation (송전계통 및 변전소 뇌서지 보호방안 연구)

  • Kim Jae-Kwan;Jung Chae-Kyun;Lee Jong-Beom;Cho Han-Goo;Seo Je-Ho
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.54 no.6
    • /
    • pp.279-285
    • /
    • 2005
  • The lightning causes the damage of power system equipments as well as large power failure. Therefore, the insulation design should be established not only to decrease the damage of the facilities itself but also to increase the reliability of electric power system. This paper describes the useful way applying underbuilt ground wire and guy wire in transmission tower that safely protect the substation equipments. One or more shield wires under the phase conductor will not intercept lightning stroke, but they may improve reduce lightning voltages almost as effectively as if they were above the phase conductors. And the guy wires will mitigate the tower surge response. These would not only reduce backflashover possibility but also minimize crest and duration of surges entering the substation. EMTP is used to analyze the efficiency of the proposed methods.

Reliability analysis for substation based on the failure rate data the facilities (설비의 고장을 데이터를 이용한 변전소 신뢰도 분석 연구)

  • Lee, Y.H.;Baek, D.H.;Jang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.29-31
    • /
    • 2006
  • The most crucial requirement of a power system is o supply quality electric energy to customers without interrution. This problem is directly related to reliability of power system. Reliability assessment of power system has been an important topic for the past several decades. This paper deals with reliability assessment of a 154kV power substation n KEPCO. In his paper, exponential distribution is used to calculate reliablity index. The failure rate data that are utilited for reliablity index based on the realistic system. Also, FTA(Fault Tree Analysis) is used to compute substation reliablity

  • PDF

Analysis of Power Quality in the Substation of Honam Electrification Line according to Running Characteristic of Electric Locomotive (호남선 EL8100 전기기관차시험 운행에 따른 급전시스템 전력품질 특성 검토)

  • Shin Chang-Ki;Han Moon-sub;Lee Jang-mu;Jang Dong-uk;Lee Han-min
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1292-1296
    • /
    • 2004
  • This study is experimented results of running characteristics about electric locomotive. it executed to study a power quality in the substation of Honam electrification line and to promote knowledge, observation and management in electric rail-system. we measured to know the more exactly running characteristics that electric locomotive and electric substation at the same time.

  • PDF