Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.1483-1488
/
2005
As the development of microprocessor technology, electric power steering(EPS) system which uses an electric motor came to use a few years ago. It can solve the problems associated with hydraulic power steering. The motor only operates when steering assistance is needed, so it can save fuel and can reduce weight and cost by eliminating hydraulic pump and piping. As one of performance criteria of EPS systems, the transmissibility from road wheel load to steering wheel torque is considered in this paper. The transmissibility can be studied by fixing the steering wheel and calculating the torque needed to hold the steering wheel from road wheel load. A proportion-plus-derivative control is needed for EPS systems to generate desired static torque boost and avoid transmissibility of fluctuation. A pure proportion control can' satisfy both requirements.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.9
/
pp.1300-1305
/
2014
In this paper, we suggest an optimization method which can save about 5[%] of the cost though the optimizing of configuration and capacity for the facility. To achieve this goal, we compared the design data of the power, motor and drive system with the actual operation data of the plate mill plant in K-Steelworks. Therefore we measured the actual loading data by facilities considering the operating conditions of the plate mill plant in K-Steelworks, after that analyzed these data. In addition, we review the optimal capacity for transformer, switchgear and drive, and also reconfigured the electrical room and power single line diagram through the validation of motor data by equipment and the confirmation of process data considering the load characteristics. Consequently, the optimization method of capacity for the facilities shall have effectiveness in building new plate mill plant to further reduce costs at future.
FAN, Fengxian;YANG, Linjun;Yuan, Zhulin;Yan, Jinpei;Jo, Young Min
Particle and aerosol research
/
v.5
no.4
/
pp.171-178
/
2009
$PM_{2.5}$ is one of critical air pollutants due to its high absorbability of heavy metallic fumes, PAH and bacillary micro organisms. Such a fine particulate matter is often formed through various nucleation processes including condensation. This study attempts to find the nucleation behaviors of $PM_{2.5}$ arisen from coal power stations using a classical heterogeneous Fletcher's theory. The numerical simulation by C-language could approximate the nucleation process of $PM_{2.5}$ from water vapor, of which approach revealed the required energy for embryo formation and embryo size and nucleation rate. As a result of the calculation, it was found that wetting agents could affect the particle nucleation in vapor condensation. In particular, critical contact angle relates closely with the vapor saturation. Particle condensation could be reduced by lowering the angles. The wetting agents aid to decrease the contact angle and surface tensions, thereby may contribute to save the formation energy.
The Journal of Korean Institute of Communications and Information Sciences
/
v.31
no.4A
/
pp.393-401
/
2006
Energy consumption is an important design parameter for battery-operated embedded systems. Dynamic power management is one of the most well-known low-power design techniques. This paper proposes an online realtime scheduling algorithm, which we call energy-aware realtime scheduling using slack stealing (EARSS). The proposed algorithm gives the highest priority to the task with the largest degree of device overlap when the slack time exists. Scheduling result enables an efficient power management by reducing the number of state transitions. Experimental results show that the proposed algorithm can save the energy by 23% on average compared to the DPM-enabled system scheduled by the EDF algorithm.
This paper presents the deadline driven CPU-Power management scheme for the Real-Time Embedded OS: named TMO-eCos. It used the scheduling scenarios generated by a task serialization technique for hard real- time TMO system. The serializer does a off-line analysis at design time with period, deadline and WCET of periodic tasks. Finally, TMO-eCos kernel controls the CPU speed to save the power consumption under the condition that periodic tasks do not violate deadlines. As a result, the system shows a reasonable amount of power saving. This paper presents all of these processes and test results.
Proceedings of the Korean Nuclear Society Conference
/
1996.05a
/
pp.571-576
/
1996
Currently most nuclear power plants(NPPs) are adopted the mid-loop operation to minimize the overhaul period and save the operating cost. For mid-loop operation it is essential to install nozzle dam between RCS pipe and steam generator(SG). Because SG remains more highly contaminated with radioactive material than any other parts of the NPPs, the repairmen are very reluctant to carry out installing nozzle dam inside the SG. Until now, unfortunately, it appears that no practically applicable device was developed to provide the longstanding demand. Also the accidents have been reported by licenser event report during this operation mode due to loss of residual heat removal(RHR). The purpose of this paper is to conduct remotely blocking and disintegration of nozzle of a SG which has the highest radiation exposure during the maintenance in NPPs. The remote nozzle blocking device of a SG includes three bladders, hubs, air controller provisions to supply and contact air pressure into the bladders. This remote nozzle block device will give the larger operation margin to prevent the loss of RHR and minimize the radiation exposure dose to the repairman and shorten the overhaul periods.
Many embedded real-time systems have adopted processors supported with dynamic voltage scaling(DVS) recently. Power is one of the important metrics for optimization in the design and operation of embedded real-time systems. We can save considerable energy by using slowdown of processor supported with DVS. In this paper, we propose heuristic algorithms to calculate task slowdown factors for an efficient energy consumption in embedded real-time systems with task synchronization. The previous algorithm has a following constraint : given the tasks are ordered in a nondecreasing order of their relative deadline, the task slowdown factors computed are in a nonincreasing order. In this paper, we relax the constraint and propose heuristic algorithms which have the same time complexity that previous algorithm has and can save more energy. Experimental results show that the proposed algorithms are energy efficient.
KIPS Transactions on Computer and Communication Systems
/
v.6
no.5
/
pp.231-238
/
2017
A Class B device in LoRaWAN periodically receives a Beacon message from a gateway for synchronization, and it also periodically activates a ping slot to receive data from the server. In this paper, we save energy consumption by controlling the beacon-less operation which is immediately started on the packet loss. In addition, we propose a method that the server inactivates the ping slots of a device according to the amount of messages, which have to be received from the server, to save energy consumption resulting from activated but unused empty slots. The experiment with the 20% of packet loss rate showed that the reduced beacon-less operation and the inactivation of the ping slot decrease the energy consumption by 96.7% and 60% as compared to the existing method.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.2
no.4
/
pp.81-87
/
2009
In this paper, the reduction amount of CO2 due to the virtual international video-conference organized by ITU in order to reduce the greenhouse gas (GHG) is calculated. The comparison is made with the case of off-line conference. In the symposium organized by ITU, "The power of ICTs to save The planet", held on September 2009 the participants were highly encouraged to attend the symposium through video-conferencing for the reduction of GHG. As a result, 46 foreign participants and 16 among 170 domestic participants have attended at virtual video-conference, which resulted in about 94.7 ton of CO2 emission reduction. This international symposium firstly tried in conjunction with online and off-line has drawn a big attention in the aspect of global warming. Definitely such ITU's trial will make significant impacts on the holding of other international symposiums and forums.
The purpose of this paper is to present a model for operating an emergency power system(EPS) that can secure a sufficient power supply used in case of a fire by analyzing the status of power supplies for emergency and firefighting operations. Investigations on the one of the causes of the operational failure of firefighting systems show evidence of EPS. Generally, when power to a building is interrupted, EPS supplies the emergency load(excepted firefighting load) first. When a power outage and a fire occur simultaneously, the EPS must be able to supply both the emergency load and the firefighting load, especially the firefighting load to the end. However, in order to save construction costs, emergency power generators in apartment, commercial, and business buildings can satisfy only one of the required loads. In cases like this, when a power outage and a fire occur simultaneously, there is a danger of firefighting equipment not operating due to insufficient power supply from the emergency generator. Therefore, an EPS must have a reserved firefighting power that can supply both the firefighting and the emergency load. Such EPS, when faced with a danger of an overload, will shut down the supply to all or part of the emergency load, thus securing a continuous power supply to the firefighting equipment. The generator power system with reserved firefighting power (RFP) will also have an indicator to show that the selective control is being used. General power generation systems for emergency load and firefighting load were found to have a demand factor of 50-60% with a lump. However, when installing an EPS, the builders must choose the higher demand factor suggested according to the official approval demand factor of the building.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.