• Title/Summary/Keyword: Power requirement

Search Result 1,004, Processing Time 0.026 seconds

An Islanding Microgrid Power Sharing Approach Using Adaptive Virtual Impedance control scheme

  • Hoang, Van-Tuan;Lee, Hong-Hee
    • Proceedings of the KIPE Conference
    • /
    • 2016.07a
    • /
    • pp.315-316
    • /
    • 2016
  • This paper proposes an enhanced distributed generation (DG) unit with an adaptive virtual impedance control approachin order to address the inaccurate reactive power sharing problems. The proposed method can adaptively regulate the DG unit thanks to the equivalent impedance, andthe effect of the mismatch in feeder impedance is compensatedto share the reactive power accurately.The proposed control strategy can be implemented directly without any requirement of pre-knowledge of the feeder impedances. Simulations are performed to validate the effectiveness of the proposed control approach.

  • PDF

Implementing Distributed Optimal Power Flow Using the Alternating Direction Method

  • Chung Koohyung;Kim Balho H.;Song Kyung-Bin
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.412-415
    • /
    • 2005
  • The recent requirement for faster and more frequent solutions has encouraged the consideration of parallel implementations using decentralized processors. Distributed multi-processor environments can potentially greatly increase the available computational capacity and decrease the communication burden, allowing for faster Optimal Power Flow (OPF) solutions. This paper presents a mathematical approach to implementing distributed OPF using the alternating direction method (ADM) to parallelize the OPF. Several IEEE Reliability Test Systems were adopted to demonstrate the proposed algorithm.

Development of An Onion Peeler (I) - Root cutting equiment - (양파 박피기 개발(I))

  • 민영봉;김성태;정태상;최선웅;김정호
    • Journal of Biosystems Engineering
    • /
    • v.27 no.4
    • /
    • pp.301-310
    • /
    • 2002
  • With a purpose to manufacture an onion peeler, the root cutting equipment of the onion could be attached to a prototype onion peeler was developed. Before the experiment, the distribution of the dimensions of the Korean native onion were measured. And some types of the blades to cut and remove the root of the onion were designed and such characteristics as feasible revolution, conveying speed, and power requirement were investigated. From the result of the test, the selected one among the various cutters was the wing type blade with the round blade to cut out the root and with the vertical blade to cut a circular line. The optimum operating conditions of the wing type blade were revealed the revolution with no load was at 630 rpm, and the conveying speed was 0.08 m/s. Under these conditions, the maximum torque was 5.25 kg·m and the power requirement was 33 W, respectively.

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

Gateway Channel Hopping to Improve Transmission Efficiency in Long-range IoT Networks

  • Kim, Dae-Young;Kim, Seokhoon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.13 no.3
    • /
    • pp.1599-1610
    • /
    • 2019
  • Intelligent services have expanded as Internet of Things (IoT) technology has evolved and new requirements emerge to accommodate various services. One new requirement is transmitting data over long distances with low-power. Researchers have developed low power wide area (LPWA) network technology to satisfy the requirement; this can improve IoT network infrastructure and increase the range of services. However, network coverage expansion causes several problems. The traffic load is concentrated at a specific gateway, which causes network congestion and leads to decreased transmission efficiency. Therefore, the approach proposed in this paper attempts to recognize and then avoid congestion through gateway channel hopping. The LPWA network employs multiple channels, so wireless channel hopping is available in a gateway. Devices that are not delay sensitive wait for the gateway to reappear on their wireless channel; delay sensitive devices change the wireless channel along the hopping gateway. Thus, the traffic load and congestion in each wireless channel can be reduced improving transmission efficiency. The proposed approach's performance is evaluated by computer simulation and verified in terms of transmission efficiency.

Performance Comparison of Modulation Schemes according to the Dimming Control in MIMO-VLC System (MIMO-VLC에서 디밍제어에 따른 변조방식들의 성능 비교)

  • Lee, Min-Jung;Lee, Byung-Jin;Ju, Sang-Lim;Kim, Yong-Won;Kim, Kyung-Seok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.4
    • /
    • pp.63-69
    • /
    • 2014
  • Visible light communication is a communication method using an LED's blinking(ON/OFF), it has a feature of light because of the limit of perception by the human's optic nerve. LED' dimming control used in the VLC system is important factor needed to provide energy saving and life benefits. With advances in VLC system, MIMO technology has received much attention in that it can be obtain channel capacity proportionate to the number of antenna. Therefore, in this paper, with RC method which is one of the MIMO style in VLC system, it is compared communication performance using RZ-OOK, VPPM, MPPM and OPPM. As a result of the simulation was run against this, MPPM works well in terms of Power requirement and OPPM works well in terms of Spectral efficiency and Bandwidth requirement, also it was confirmed that there is a significant impact on the communication performance of each modulation scheme according to the dimming.

A study on the analysis of energy performance for zero-energy building of rural village hall - Focused on the Jung Juk 4-le village hall - (농촌 마을회관 제로에너지 건축물 구축을 위한 에너지 성능 분석 연구 - 충남 태안군 정죽4리 마을회관을 중심으로 -)

  • Park, Mi-Lan;Choi, Jeong-Man;Lee, Jeong-Hun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.20 no.4
    • /
    • pp.1-8
    • /
    • 2018
  • In this study, we survey the 2 buildings at the Central 1 and 8 buildings at the Central 2, which are divided by each climate region in the rural regions. Major heat loss factors are 47% loss of the outer shell including outer wall, roof, and bottom, 30% loss through window, and 23% loss through crevice wind. We analyze the energy simulation of ECO2 program to construct a zero energy building regarding village hall located in Jung Juk 4-le at Centeral 2. We simulate the primary energy requirement regarding village hall and the simulated results show the $265.3kWh/m^2{\cdot}a$ and it may estimate '2' energy efficiency grade. The energy requirement regarding village hall is the $183.2kWh/m^2{\cdot}a$ when the passive technology are applied in village hall. We research total amount of energy requirement in village hall when the passive and active technologies such as solar cell with 3kW and solar thermal with $20m^2$, geothermal power with 17.5kW. The simulated results show the improved energy efficiency certification grade with $1^{{+}{+}{+}}$ due to the reduced primary energy requirement with 73% when passive technology including 3kW of solar panel is applied and the energy independence rate is 54%, which is estimated to be 4th grade of zero energy buildings. The order of energy consumption are solar panel, solar thermal, and geothermal power under applied passive technology in the building. In order to expand the zero energy building, it is necessary to introduce the zero energy evaluation system in the rural region.

A Study on Requirement of Nuclear Power Plant Load Following Operation Condition Considering Power System Security (계통 안전성을 고려한 원자력발전의 부하추종 요건연구)

  • Lee, Hyun-Chul;Baek, Young-Sik;Lee, Geun-Joon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.11
    • /
    • pp.1565-1570
    • /
    • 2012
  • Nuclear power generation is increasing domestic power supply ratio by lower CO2 emission and fuel prices. Currently, nuclear power generator has been operated with maximum power output. Therefore, nuclear power generator could be no effect to managing the reactive power reserve on power system. The reactive power reserve is calculated to the difference between maximum facility and operation generation capacity of the power system. This paper was proposed that load following of nuclear power is control by using 15-bus power system model. In the simulation result, power system is shown to safety state by operating load following of nuclear power generator. This method has be improved the supplied reliability through economic and efficient operation.

A Study on the Criteria to Decide the Number of Aircrafts Considering Operational Characteristics (항공기 운용 특성을 고려한 적정 운용 대수 산정 기준 연구)

  • Son, Young-Su;Kim, Seong-Woo;Yoon, Bong-Kyoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.1
    • /
    • pp.41-49
    • /
    • 2014
  • In this paper, we consider a method to access the number of aircraft requirement which is a strategic variable in national security. This problem becomes more important considering the F-X and KF-X project in ROKAF. Traditionally, ATO(Air Tasking Order) and fighting power index have been used to evaluate the number of aircrafts required in ROKAF. However, those methods considers static aspect of aircraft requirement. This paper deals with a model to accommodate dynamic feature of aircraft requirement using absorbing Markov chain. In conclusion, we suggest a dynamic model to evaluate the number of aircrafts required with key decision variables such as destroying rate, failure rate and repair rate.

The Development Plan on Urban Transit System Standard of RAMS based (RAMS기반의 도시철도시스템 표준규격 개발방향 연구)

  • Lee, Woo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1179-1180
    • /
    • 2007
  • Urban transit is system that offer target Performance and function because various lower part system such as vehicles, signaling, power supply, rail track is consisted as complex. It is important first of all that describe correctly system requirement until configuration of system, design, manufacture, installation and test verification so that the complicated urban transit system is to act safety and reliable and to display target Performance and function properly. The system requirement assist the system developer to comprehensive the performance and function of system in basic design. Therefore, In this paper wishes to study way to analyze system of system requirement and apply to Urban transit.

  • PDF