• Title/Summary/Keyword: Power requirement

Search Result 1,009, Processing Time 0.043 seconds

Analysis of a Communication Network for Control Systems in Nuclear Power Plants and a Case Study

  • Lee, Sung-Woo;Gwak, Kwi?Yil
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.338-341
    • /
    • 2005
  • In this paper, a real-time communication method using a PICNET-NP(Plant Instrumentation and Control Network for Nuclear Power Plant) is proposed with an analysis of the control network requirements of DCS (Distributed Control System) in nuclear power plants. The method satisfies deadline in case of worst data traffics by considering aperiodic and periodic real-time data and others. In addition, the method was used to analyze the data characteristics of the DCS in existing nuclear power plant. The result shows that use of this method meets the response time requirement(100ms).

  • PDF

Peak Power Control for Improvement of Stability in Multi-core System (멀티코어 시스템의 안정성 향상을 위한 피크파워 제어 알고리즘)

  • Park, Sung-Hwan;Kim, Jae-Hwan;Ahn, Byung-Gyu;Jung, Il-Jong;Lee, Seok-Hee;Chong, Jong-Wha
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.747-748
    • /
    • 2008
  • In this paper, we propose a new algorithm for task scheduling consisting of subtask partitioning and subtask priority scheduling steps in order to keep the peak power under the system specification. The subtask partitioning stepis performed to minimize the idle operation time for processors by dividing a task into multiple subtasks using the least square method developed with power consumption pattern of tasks. In the subtask priority scheduling step, a priority is assigned to a subtask based on the power requirement and the power variation of subtask so that the peak power violation can be minimized and the task can be completed within the execution time deadline.

  • PDF

Kernel Level Power Management Solution for Multi-Core (멀티코어 환경에서 커널 수준의 전력 관리 솔루션)

  • Ahn, Youngho;Hwang, Young-Si;Chung, Ki-Seok
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.4 no.2
    • /
    • pp.50-54
    • /
    • 2009
  • In this paper, we address a novel system-level power management technique which is specifically targeted for an ARM 11 MPCore system. Our proposed solution is a DPM technique which includes process monitoring, real time power analysis, and policy application to reduce the power consumption while meeting the performance requirement. One of the main contributions of this paper is that we systematically infer QoS requirements of processes without getting any additional information from the application. When multiple processes are running under various user level policies, priorities of the policy application are determined in such a way that the overall system performance is maintained while power consumption is effectively managed. Experimental results show that our DPM technique is very effective in reducing power consumption without violating system's QoS requirements.

  • PDF

Analysis of a network for control systems in nuclear power plants and a case study (원자력 발전소 제어계통을 위한 네트워크의 해석과 사례 연구)

  • Lee, Sung-Woo;Yim, Han-Suck
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.6
    • /
    • pp.734-743
    • /
    • 1999
  • In this paper, a real-time communication method using a PICNET-NP(Plant instrumentation and Control Network for Nuclear Power plant) is proposed with an analysis of the control network requirements of DCS(Distributed Control System) in nuclear power plants. The method satisfies deadline in case of worst data traffics by considering aperiodic and periodic real-time data and others. In addition, the method was used to analyze the data characteristics of the DCS in existing nuclear power plant. The result shows that use of this method meets the response time requirement(100ms).

  • PDF

A Method for Optimal Power Assignment of the Transponder Input Carriers in the Multi-level & Multi-bandwidth System (Multi-level & Multi-bandwidth 시스템에서 위성중계기 입력반송파 전력의 최적 할당 기법)

  • 김병균;최형진
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.9
    • /
    • pp.1167-1176
    • /
    • 1995
  • This paper suggests a method for optimal power assignment of the satellite transponder input carriers in the Multi-level & Multi-bandwidth system. The interference and the noise effects analyzed for the optimal power assignment are intermodulation product caused by the nonlinear transponder characteristics, adjacent channel interference, co-channel interference, and thermal noise in the satellite link. The Fletcher- Powell algorithm is used to determine the optimal input carrier power. The performance criteria for optimal power assignment is classified into 4 categories according to the CNR of destination receiver earth station to meet the requirement for various satellite link environment. We have performed mathematical analysis of objective functions and their derivatives for use in the Fletcher-Powell algorithm, and presented various simulation results based on mathematical analysis. Since the satellite link, it is meaningful to model and analyze these effects in a unified manner and present the method for optimal power assignment of transponder input carriers.

  • PDF

DC Power Dissipation Characteristics for Dual-mode Variable Conversion Gain Mixer (이중모우드 가변 변환이득 믹서의 전력 효율 특성)

  • Park, Hyun-Woo;Koo, Kyung-Heon
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.113-114
    • /
    • 2006
  • In this paper, dual-gate mixer has been designed and optimized to have variable conversion gain for WiBro and WLAN applications and to save power. With the LO power of 0dBm and RF power of -50dBm, the mixer shows 15dB conversion gain. When RF power increases from -50dBm to -20dBm, the conversion gain decreases to -2dB with bias change. The variable conversion gain can reduce the high dynamic range requirement of AGC burden at IF stage. Also, it can save the dc power dissipation of mixer up to 90%.

  • PDF

Design of Charge Pump Circuit for Intelligent Power Module of Floating Gate Power Supply (Intelligent Power Module의 플로팅 게이트 전원 공급을 위한 전하 펌프 회로의 설계)

  • Lim, Jeong-Gyu;Kim, Seok-Hwan;Seo, Eun-Kyung;Chung, Se-Kyo
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.421-423
    • /
    • 2005
  • A bootstrap circuit for floating power supply has the advantage of being simple and inexpensive. However, the duty cycle and on-time are limited by the requirement to refresh the charge in the bootstrap capacitor. Hence, this paper deals with a design of charge pump circuit for a floating gate power supply of an IPM. The operation of the proposed circuit applied by three-phase inverter system for driving induction motor are verified through the experiments.

  • PDF

H-Bridge VSC with a T-Connected Transformer for a 3-Phase 4- Wire Voltage and Frequency Controller of an Isolated Asynchronous Generator

  • Kasal, Gaurav Kumar;Singh, Bhim
    • Journal of Power Electronics
    • /
    • v.9 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • This paper deals with a novel solid state controller (NSSC) for an isolated asynchronous generator (IAG) feeding 3-phase 4-wire loads driven by constant power prime movers, such as uncontrolled pico hydro turbines. AC capacitor banks are used to meet the reactive power requirement of the asynchronous generator. The proposed NSSC is realized using a set of IGBTs (Insulated gate bipolar junction transistors) based current controlled 2-leg voltage source converters (CC- VSC) and a DC chopper at its DC bus, which keeps the generated voltage and frequency constant in spite of changes in consumer loads. The neutral point of the load is created using aT-configuration of the transformers. The IAG system is modeled in MATLAB along with Simulink and PSB (power system block set) toolboxes. The simulated results are presented to demonstrate the capability of the isolated generating system consisting of NSSC and IAG driven by uncontrolled pico hydro turbine and feeding 3-phase 4-wire loads.

A study on the OAM evaluation model for power telecommunications system (전력통신시스템 신뢰도 평가모델 구성 연구)

  • Lee, W.T.;Lee, J.J.;Kim, K.H.;Oh, M.T.;Lee, B.K.;Lee, W.B.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1330-1332
    • /
    • 1996
  • Power telecommunication networks is being increased rapidly in that expansion of power plant according to the growth of electric power supply. The requirement of power plant operation & office automation make it to complex and confusing to operate. So, for the sake of correspond to the change, it is necessary that telecommunication network should be high reliable and managed effectively. In this paper, we suggest total reliability evaluation models for power telecommunication network which is based on the QOS(quality of service) standardization techniques recommanded by ITU-T.

  • PDF

PoMP : Power conscious Multimedia Player (저전력 멀티미디어 재생 기법)

  • Park, Jung-Wan;Won, You-Jip
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04d
    • /
    • pp.253-255
    • /
    • 2003
  • Electricity is the prime commodity in mobile device, e.g. smart phone, PDA, MP3 player and etc. This strict restriction on power consumption requirement of the mobile device puts unique demand in designing hardware and software components of the device. In this paper, we address the issue of minimizing the power consumption in retrieving the continuous media data from the disk drive for real-time playback purpose. Different from the legacy text based data, real-time multimedia playback requires that the storage supplies the data block continuous fashion. This may put immense burden on the power scarce environment since the disk Is required to be active for the entire playback duration. We develop elaborate algorithm which carefully analyzes the power consumption profile of the disk drive and which establishes the data retrieval schedule for the given playback. It computes the amount of data blocks to read, the length of active and standby period. According to our simulation result, the ARM algorithm exhibits superior performance in continuous media retrieval from the aspect of power consumption to legacy playback scheme.

  • PDF