• Title/Summary/Keyword: Power rail

Search Result 446, Processing Time 0.026 seconds

The effect of Mobile Flash Butt Welding (이동식 플래시 버트 용접의 효과)

  • Lee Jun-Sik;Lee Jong-Su;Lee Hak-Kyu;Lee Jung-Kwon;Lee Jee-Ha
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.793-799
    • /
    • 2004
  • In track a third weakness point is joint part, turnout part, curve part. One of them joint part of rail have been known to the most weak point by loosen of joint bar and fish bolt due to impulse and vibration by wheel contact at times. In addition happen to deformation and failure at end of rail, failure and miniature of ballast gravel. Finally impact between wheel and rail become origin cause of a welded rail, noise and vibration. riding condition deterioration, besides track failure. In the present domestic, Thermite and Gas pressure weldings have been used to continuous welded rail(CWR), however stiffness and confidence in quality is lower than Flash butt welding method. FRW have the excellent capacity, however have a shortcoming large scale of machine and power equipment. Therefore we will introduce Mobile Flash Butt Welder can weld in track.

  • PDF

Finite Element Analysis and Static Load Test of a Wheelset of Gwangju EMU for Measuring Wheel/Rail Force (차륜/궤도 작용력 측정을 위한 광주전동차 윤축의 구조해석 및 정하중 시험)

  • Jeon Eung-Sik;Ham Young-Sam;Chung Woo-Jin
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.762-767
    • /
    • 2003
  • The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evalutions of the system. The railroad system consist of various subsystems - vehicle, power spply, signal communications, track structures, operations, etc. Among them as an item of safety evaluation there is a measurement of wheel/rail force, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, it is introduced to preprocess the wheelset for measuring wheel/rail force of Gwangiu EMU, such as to treat a measuring wheelset its finite element analysis, adhesion of strain gauges and static load test.

  • PDF

Evaluation of running safety for korean high speed railway vehicle (한국형 고속철도차량의 주행안전성 평가)

  • Ham Young-Sam;Hur Hyun-Moo
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.316-321
    • /
    • 2003
  • The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evaluations of the system. The railroad system consist of various subsystems - vehicle, power supply, signal, communications, track structures, operations, etc. Among them, as an item of safety evaluation there is a measurement of wheel/rail force, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, it is introduced to preprocess the wheelset for measuring wheel/rail force of high speed rail, such as to treat a measuring wheelset, adhesion of strain gauges and static load test, running test result of main line.

  • PDF

Combustion and Emission Characteristics of Biodiesel Fuel in a Common Rail Diesel Engines (커먼레일 디젤엔진을 이용한 바이오디젤 연료의 연소 및 배출가스 특성)

  • Zhang, Yue-Qiu;Wang, Jianxin;Cho, Haeng-Muk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.33 no.2
    • /
    • pp.252-258
    • /
    • 2009
  • Engine bench tests has been done on a common-rail diesel engine with bio-diesel fuel to study effects of B100 and B20 on output power, fuel consumption and emissions. Test results show that B100 and B20 could reduce PM, HC, CO emission and smoke, but power decrease, fuel consumption increase and NOx increase obviously, B100 reduce PM and DS with $50%{\sim}70%$ and $80%{\sim}85%$ compared with diesel fuel, while B20 reduce PM and DS with $25%{\sim}35%$ and $30%{\sim}40%$. NOx of B100 and B20 increase $5%{\sim}20%$ compare to diesel.

Combustion Characteristic of Non-esterified Bio-diesel Oil at Lower Common Rail Pressure (저 커먼레일 압력에서 비에스테르화 바이오 디젤유의 연소특성)

  • Lee, Sang-Deuk;Koh, Dae-Kwon;Jung, Suk-Ho
    • Journal of Power System Engineering
    • /
    • v.17 no.6
    • /
    • pp.11-17
    • /
    • 2013
  • Esterified bio-diesel oil is normally used as blend oil of 3% that and 97% diesel fuel in Korea. Since specifics of it is similar to that of diesel fuel, availability of non-esterified bio-diesel oil that has a lower expenses of manufacturing is worthy of attention. However, bio-diesel oil has a demerit which it emits typically more NOx emission than diesel fuel. In this study, characteristic tests using blending oil with 95% gas oil and 5% bio-diesel oil were achieved at lower common rail pressure in order to improve this demerit. It was noticed that non-esterified bio-diesel oil has more similar characteristics to diesel fuel than esterified bio-diesel oil and it emits more NO emission by fuel NO mechanism.

Analysis of Dynamic Behavior for Design Review of the Korean High Speed Prototype Test Train (한국형 고속전철 시제차량 설계검증을 위한 동특성 해석)

  • ;;Johannes Picht
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.1232-1240
    • /
    • 2001
  • In this study. a computer simulation of the Korean High Speed Prototype Test Train was performed to investigate the dynamic behavior(running stability. safety and comfort) in detail design process. The simulation model which was prepared by ADAMS/Rail V10.l consists of power car and middle car assembly (2 motorized cars + 3 trailer cars). The nonlinear analysis takes into account the full vehicle model including wheel/rail contact and the influence of disturbed track. Throughout the dynamic calculation of KHST on the straight and the curved track. accelerations in car body. ride comforts and wheel rail forces were investigated.

  • PDF

The Balancing Control of Moving Mass Rail by a Screw Jack and Damper (스크류 잭 및 댐퍼를 이용한 가동질량 레일의 평형제어)

  • Byun, J.H.;Choi, M.S.
    • Journal of Power System Engineering
    • /
    • v.11 no.1
    • /
    • pp.134-139
    • /
    • 2007
  • A delivery ship is used to handle the cargo with the crane to/from the ships. The ship is inclined in the direction of a cargo which is hung on a crane. In this case, a arc shaped rail should be in the equilibrium state to get good anti-rolling performance. In this study, a device and control algorithm are developed to take accurate and quick equilibrium of the rail. The device is composed of a hinged immovable support, screw jack and damper. And the control system is based on I-PD control law to consider of control input saturation and overshoot. The controller is composed of integral controller of feedforward path and proportional-derivative controller of feedback path. The parameters of controller is designed to follow the reference signal and to remove overshoot. The simulation results show that the desirable control performance is achieved.

  • PDF

A study on the Life Cycle Cost reduction of the LRT's power systems based on the advanced Systems Engineering (시스템엔지니어링 기법 적용에 따른 경량전철 전기시스템의 생명주기비용 절감에 관한 연구)

  • Choi, Won-Chan;Bae, Joon-Ho;Heo, Jae-Hun;Joo, Ji-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1434-1439
    • /
    • 2011
  • The purpose of this study is based on the optimize the system life cycle cost apply to the advanced systems engineering techniques consideration thought to the system life cycle for the power system which is the one of the major component of the light rail transit system. Generally, the systems engineering techniques apply to the LRT's power systems are not optimize the whole life cycle cost of the power systems because systems engineering management activities are concentrate in performing the key-technology oriented at the construction stage of the dedicated power systems for light rail transit. Through this study, All the stakeholders can be utilize a this advanced systems engineering techniques which is fully considered the life cycle cost through the considering in whole system life cycle (such as concept, design, operation, maintenance and dispose stage as well as construction stage) and adopted by KSX ISO/IEC 15288 system life cycle processes.

  • PDF

Urban Rail Power Facilities on-site Implementation of an Integrated System Diagnosis (도시철도 전력설비 상태진단 통합시스템 현장구현)

  • Im, Hyeong-Gil;Lee, Byung-Du;Kim, Yong-Duk;Jang, Soon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2015-2020
    • /
    • 2011
  • Key set the current non-urban rail power failure of equipment to operate the railway will generate a lot of problems. I know in advance the ideal of power equipment to prevent the failure to derive an efficient replacement cycle for the power equipment monitoring and diagnosis of the condition can become necessary to develop a system. In order to determine the status of the power plant during operation and behavior of the partial discharge current state data, regular monitoring and inspection requirements also stamp the basic current, voltage, temperature and humidity should be identified.

  • PDF