• Title/Summary/Keyword: Power plant scale

Search Result 383, Processing Time 0.029 seconds

The Virtual Reality in Fossil Power Plant Operator Training Simulator

  • Ma, Sam-Sun;Park, Jin-Ho;Oh, Seog-Chan
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.197-200
    • /
    • 1999
  • In these days many large scale plants are attempting to use the Virtual Reality technology in the process analysis. Their goal is to reduce the development time by more effective information management as Simultaneous Engineering point of view, and by connecting the CAD datum and all kinds of products information. Generally, it is taken for granted that when a plant is equipped with a Virtual Reality technology, they are able to review the design and analyze the engineering performance of the product before actually building it, so that their goal to reduce costs and enhance the initial quality can be achieved. [1][2] In this paper we will look into the application the virtual reality technology Hadong fossil power plant. And we will also define the concepts of virtual plant by summarizing requirements and thoughts from the people who are in working in the actual site.

  • PDF

Modelling of Power Plant Fan Pitch Blade Control Actuator (전력설비 대용량 보일러 통풍기 날개각 제어 작동기 모델링)

  • Huh, J.Y.;Son, T.H.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.4 no.2
    • /
    • pp.28-33
    • /
    • 2007
  • In the power plant facility which use soft coal as a power source the fan pitch blade control hydraulic actuator is used to control the inlet and outlet gas to regulate the internal pressure of the furnace and control the frequence. Sometimes malfunctions of this equipment lead to the decline of boiler thermal efficiency and unexpected power plant trip. In order to localize the fan pitch blade control hydraulic actuator specially for the 500MW large scale boiler, Analysis and modelling of the system is carried out mathematically. The responses of the system are examined by using matlab simulation fur the variation of the major parameters in view of reverse engineering. Consequently the validity of the established parameters are examined.

  • PDF

The Variations of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condition (강우상태에 의한 소수력발전소 설계변수의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.138-141
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

The Variations of Performance Parameters for Small Scale Hydro Power Plant with Rainfall Condition (강우상태에 의한 소수력발전소 성능변수의 변화)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • New & Renewable Energy
    • /
    • v.4 no.3
    • /
    • pp.15-22
    • /
    • 2008
  • The effects of design parameters for small scale hydro power (SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

The Effects of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condation (강우상태에 의한 소수력발전소 설계인자의 영향)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.1
    • /
    • pp.43-49
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

Large-scale Virtual Power Plant Management Method Considering Variable and Sensitive Loads (가변 및 민감성 부하를 고려한 대단위 가상 발전소 운영 방법)

  • Park, Yong Kuk;Lee, Min Goo;Jung, Kyung Kwon;Lee, Yong-Gu
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.5
    • /
    • pp.225-234
    • /
    • 2015
  • Nowadays a Virtual Power Plant (VPP) represents an aggregation of distributed energy resource such as Distributed Generation (DG), Combined Heat and Power generation (CHP), Energy Storage Systems (ESS) and load in order to operate as a single power plant by using Information and Communication Technologies, ICT. The VPP has been developed and verified based on a single virtual plant platform which is connected with a number of various distributed energy resources. As the VPP's distributed energy resources increase, so does the number of data from distributed energy. Moreover, it is obviously inefficient in the aspects of technique and cost that a virtual plant platform operates in a centralized manner over widespread region. In this paper the concept of the large-scale VPP which can reduce a error probability of system's load and increase the robustness of data exchange among distributed energy resources will be proposed. In addition, it can directly control and supervise energy resource by making small size's virtual platform which can make a optimal resource scheduling to consider of variable and sensitive load in the large-scale VPP. It makes certain the result is verified by simulation.

The Measurement of Efficiency Structure and Regulatory Effects in Korean Electric Industry with Power Development Plan (전원개발계획을 고려한 전력산업의 비용구조 및 규제효과분석)

  • Rhee, Chang-Ho;Kwun, Young-Han
    • Environmental and Resource Economics Review
    • /
    • v.11 no.2
    • /
    • pp.233-260
    • /
    • 2002
  • This paper tries to analyze the efficiency structure and regulatory effects in electric power industry by using total factor productivity and indices based on cost function method. This paper performed an empirical analysis on the efficiency improvement and optimal scale taking the cost aspect in electricity industry into account. By expanding the cost structure framework, this paper proposes the analytical method regarding the needs of technology regulation and presents the empirical results which can be verified. Hence, this work can play a key role in decision-making of the national power development and regulatory policy. The empirical result indicates that the electricity industry in Korea has been in the state of economies of scale until 1980s, However, due to sustained growth of power generation, economies of scale declined and subsided after 1980s and then diseconomies of scale is shown recent years. The analysis on the effect of technology regulation shows the national large-scale base-load power plant development-oriented policy until so far contributed substantial cost effect to the electricity industry. The empirical result indicates that the reserve requirement as one of means of technology regulation policy did not contribute to the economies of scale but positive effect on the total factor productivity in Korea.

  • PDF

The operation Characteristic of Pilot-scale 2-Stage Coal gasifier (Pilot 규모 2단 형상 가스화기 운전특성 실험)

  • Hong, Jin-Pyo;Chung, Jae-Hwa;Seo, Seok-Bin;Chi, Jun-Hwa;Lee, Seung-Jun;Chung, Suk-Woo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.528-532
    • /
    • 2009
  • Integrated Gasification Combined Cycle (IGCC) power plant converts coal to syngas, which is mainly composed with hydrogen and carbon monoxide, by the gasification process and produces electric power by the gas and steam turbine combined cycle power plant. The purpose of this study is to investigate the influence of gasification process to type and structure of gasifier. For this purpose, the performance characteristics of gasification reaction are analyzed with the operation characteristic of pilot-scale 2-stage coal gasifier. It is found that gasification reaction, floating characteristic of melted slag, particle stick of inside of the gasifier, particle stick and deposit of Syngas cooler are the causes in the different performance characteristics.

  • PDF

Analysis of Factors Driving the Participation of Small Scale Renewable Power Providers in the Power Brokerage Market (소규모 재생발전사업자의 중개시장참여 촉진요인 분석)

  • Li, Dmitriy;Bae, Jeong Hwan
    • New & Renewable Energy
    • /
    • v.18 no.3
    • /
    • pp.32-42
    • /
    • 2022
  • Rapid spread of intermittent renewable energy has amplified the instability and uncertainty of power systems. The Korea Power Exchange (KPX) promoted efficient management by opening the power brokerage market in 2019. By combining small-scale intermittent renewable energy with a flexible facility through the power brokerage market, the KPX aims to develop a virtual power plant system that will allow the conversion of existing intermittent renewable energy into collective power plants. However, the participation rate of renewable power owners in the power brokerage market is relatively low because other markets such as the small solar power contract market or the Korea Electric Power Corporation power purchase agreement are more profitable. In this study, we used a choice experiment to determine the attributes affecting the participation rate in the power brokerage market for 113 renewable power owners and estimate the value of the power brokerage market. According to the estimation results, a low smart meter installation cost, low profit variations, long contract periods, and few clearances increased the probability of participation. Moreover, the average value of the power brokerage market was estimated to be 2.63 million KRW per power owner.

Promotion of the Overseas Biomass Plant Business for a Domestic Power Company (국내 발전기업의 해외 바이오매스 플랜트 사업진출 방향)

  • Kim, Yeongsang;Moon, Seungjae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.3
    • /
    • pp.42-47
    • /
    • 2011
  • One of domestic power generation companies, Korea East-West Power Corporation(EWP) had no performance in overseas business just two short years ago. However, EWP has accomplished breakthrough results with the profit of KRW 17.8 billion in 2010, only overseas business part. With overseas power plant growing fast, there is a possibility that EWP may face the limitation of sustainable growth with the current low income structure, which is mainly focused on commissioning and power plant management. Accordingly, this study was made on overseas biomass plant business participation plan through the establishment of joint venture. The characteristics of a joint venture establishment was searched, choosing business partner; the ideas of how to organize a joint venture was drawn, what the role of each partner in joint venture is, and what proper capital share is; and chose business field, considering changing global energy mix, renewable energy market scale, and growth prospects. Considering government policy for renewable energy vitalization and renewable energy market share, We chose the European union as a market to which our business entered.

  • PDF