• Title/Summary/Keyword: Power facility management

Search Result 248, Processing Time 0.03 seconds

A development of direct load control system for air-conditioner (원격제어 에어컨 개발 보급현황 및 향후전망)

  • Gang, Won-Gu;Kim, Choong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

Design and Economics of HVAC System for Reduction of Power Consumption in Blow Mold Machine (플라스틱 연료탱크 생산 설비에서의 소비 전력 저감을 위한 공조 시스템 설계 및 경제성 평가)

  • Lee, Youngjae;Choi, Seukcheun
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.84-93
    • /
    • 2017
  • This study was carried out to improve the electric power consumption of HVAC in the blow mold machine(BMM) and work environment. The experiment was conducted with the simulated HVAC system of 1/15 of the actual BMM. The temperature of main facility and two preheaters was fixed at 200 and $60^{\circ}C$ respectively in all test conditions. The measured points of temperature were chosen as critical locations considering the work environment. The tendency of temperature distributions decreases as the duct was closed to the main facility. The reduction rate of power consumption of HVAC increases up to 32.3% when both duct and cooling systems are operated. Also the efficiency of HVAC is improved about 9% through the modified design of duct system. It notes that the electric power consumption of HVAC can be reduced by the optimum design and operating condition of duct and cooling system.

Licensing Review Scheme for Low and Intermediate Level Radioactive Waste Disposal Facility ($\cdot$저준위방사성폐기물처분시설 인허가심사 방안)

  • 전제근;정승영;장재권;이관희;박원재;박상훈
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.283-289
    • /
    • 2003
  • In order to establish the licensing review system for LILW disposal facility, we have studied the licensing review structure of oversea's countries, including United State, Japan, and France. We have also reviewed the domestic licensing review structure and the current status of development of safety standards for LILW management. A licensing review for LILW disposal facility can be implemented in 5-6 steps according to Atomic Energy Act. It is estimated to take 32 months for the CP and the OL review for LILW disposal facility referencing to the licensing review practice of the nuclear power plant. To date, a total of 15 MOST Notices have been developed to apply to the safe management of radwaste and 5 more MOST Notices will be developed by 2005.

  • PDF

ESS Connected PV Monitoring System Supporting Redundant Communications (통신 이중화를 지원하는 ESS연계 태양광 모니터링 시스템)

  • Joo, Jong-Yul;Lee, Young-Jae;Oh, Jae-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2018
  • The systems associated with the ESS never stop. It runs 24 hours everyday. The system must be managed to run. The ESS system should perform normally even if the power IT equipment fails or communication failure occurs. Therefore, there is a need for a system that actively addresses, manages and controls the high precision power data of the ESS, even if a variety of failures occur. I would like to propose a power management communication unit to cope with the occurrence of communication failure. This paper also includes an integrated management system that can perform micro grid site management, maintenance and monitoring for the ESS system connected with the solar power generation facility.

Structural Analysis of Advanced Spent Fuel Conditioning Process Facility (차세대관리 종합공정 실증시설의 구조해석)

  • 구정회;정원명;조일제;국동학;유길성
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.411-420
    • /
    • 2003
  • An advanced spent fuel conditioning process (ACP) is developing for the safe and effective management of spent fuels which arising from the domestic nuclear power plants. And its demonstration facility is under design. This facility will be prepared by modifying IMEF's reserve hot cell facility which reserved for future usage by considering the characteristics of ACP. This study presents a basic structural architecture design and analysis results of ACP hot cell including modification of the IMEF. The results of this study will be used for the detail design of ACP demonstration facility, and utilized as basic data for the licensing of the ACP facility.

  • PDF

A Study on the Application Method of Configuration Baseline for Nuclear Power Plant (원전 형상기준선 적용방안에 관한 연구)

  • Park, You-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.199-200
    • /
    • 2017
  • The Configuration Management(CM) of Nuclear Power Plant(NPP) is an activity that maintains consistency among the design requirement, facility configuration information and physical configuration. It is a systematic approach to performing various engineering tasks such as change management by identifying, documenting the characteristics of plant Structures, Systems and Component(SSC). The first activity that should be performed the configuration baseline setting at the start of project. The configuration baseline of the NPP construction phase is the status of the SSC of the plant at a specified process and time, and the actual configuration changes depending on the condition of plant. In this paper, I have studied the current status of configuration baseline used in the software industry and general plant industry, method of establishment for the configuration baseline which was first applied to the construction of NPP.

  • PDF

A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings (초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구)

  • Jo, Chan-Won;Kwon, Soon-Ho;Lee, Woon-Jae;Roh, Tae-Im;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

Algorithm and Program of Development for Effective Hydor Operation (효율적인 수력운용을 위한 알고리즘 및 프로그램 개발)

  • Jang, Me-Hae;Lee, Kyoung-Jae;Youn, Gab-Goo;Min, Byoung-Woon;Kang, Sang-Hee;Choi, Myeo-Song;Jun, Dong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.778-780
    • /
    • 1997
  • This study considers a hydro power energy operation management and planning problem in KEPCO power systems for efficient use of hydro resources. A database is developed to provide with a convenience to hydro Power operation management and Planning by studying of the hydro resourse characteristics of Korea. The data is obtained in the operation history from 7 years ago and by considering the hydro facility planning to 2010 year. Also a computer program is developed to decide the monthly required volume of water and the water level of a dam in the Han river using the database.

  • PDF

Suggestions on Efficient O&M Plan for Improving Users' Satisfaction on the University Dorm Facilities (대학 기숙사 시설의 사용자 만족도 향상을 위한 효율적인 유지보수관리(O&M) 방안 제안)

  • Kim, Min Soo;Kim, Yujin;Kim, Jun Ha
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.5
    • /
    • pp.11-18
    • /
    • 2017
  • An university dorm has significant implications in terms of providing residential, living, and learning spaces. With its supportive function, a dorm enables each university to provide higher level of education. The operation & maintenance(O&M) condition of the dorm has a decisive effect on the students' satisfaction. Accordingly, high levels of O&M services should be performed for students. However, Korean dorms are being operated and maintained by their own O&M guidelines without the consideration of spatial characteristics of dorm facilities and the comprehensive and systematic understanding on effective O&M processes. Given the fact that dorm facility can be a crucial factor in determining the entire quality of university and its O&M condition is closely related to the satisfaction of students, it is imperative that we need to pay more attention to the O&M condition and services. Therefore, the main objective of this research is to improve dorm students' satisfaction levels by applying different O&M method, preventive maintenance rather than reactive maintenance which has been performed so far. In ordering for doing it, 'Facility Management(FM) Standard' from KS, 'Facility Performance Indicator(FPI)' from APPA: Leadership in educational facilities and 'Building O&M Inspection Manual' from Korean Ministry of Land, Infrastructure and Transport were analyzed to come up with 15 significant O&M factors. After extracting O&M factors, the survey was conducted to determine importance rate and performance rate of each O&M factor. Using the Important-Performance Analysis(IPA), the priority of 15 O&M factors was established. The result of this research will be helpful for the efficient dorm facility O&M services and for facility managers to appropriately allocate the limited resources and human power.

Power facility Stop-type Classification and Yearly Rate of Stop Statistics Following Power facility Stop-management Standard (전력설비 정지관리 기준에 따른 전력설비 정지종류 분류 및 년도별 정지율 통계)

  • Jung, Hong-Hee;Kim, Jong-Hyuk;Jung, Gu-Hyung;Kang, Dong-Ju;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.602-603
    • /
    • 2008
  • 본 논문에서는 전력계통의 안정적인 운영과 전기품질을 확보하고 전력수급 기본 계획 수립 등 전력설비 투자 계획에 활용하기 위하여 최근 새롭게 개정된 전력설비 정지관리 기준(電力設備 停止管理 基準)에 따라 전력설비 정지종류를 분류해 본다. 또한 계획정지, 비계획정지로 구분했던 2006년도 발전설비의 정지일수와 정지량등을 알아보고, 계획정지, 비계획정지, 운영예비초과정지 등으로 세분화된 분류에 따른 2007년도의 정지율을 계산하여 본다.

  • PDF