The Japanese government has carried out the power industry reform in three phases to supply power stably, control the rise of electricity tariff, and expand consumer choices. The reform of the Japanese electric power industry fosters new kinds of businesses as well as changes the competitive structure in which the enterprises participating electricity business compete. However, for the power industry restructuring to be done smoothly, the accompanying tasks should be carried out. Korea has also been devoting a lot of efforts to cultivate various types of new industries based on the convergence of energy and information and communications technology. If there are the same kinds of new industries between the two countries, the progresses of the industries can be compared to each other over a period of time.
It is not valid to measure the degree of market power based on the markup of price over marginal market cost in an industry for which the market price of some inputs is not available because those inputs are then excluded in estimating the dual total cost function. If the roles of those inputs are ignored, the markup of price over marginal market cost is likely to be positive in the perfectly competitive industry. In order to have accurate market power markups for the environmentally regulated Korean iron and steel industry, in which the market price of raw material and the price of abatement capital are hard to obtain, in this paper, a dual cost function is derived given the optimal quantities of raw material and abatement capital, and then estimated jointly with the supply relation. The annual average degree of market power for the industry is estimated to be 0.49 over the period 1982~2001. Ignoring environmental regulation would overstate the degree of market power by about 8 percent.
In electric Industry, the improvement of load factor by flattening load has been considered to be more important than any other tasks and has received wide concern and interest. Especially while annual peak load had occurred early evening in winter during past decades, but we found the trend has changed so that annual peak load occurred during the daytime in summer since 1981. In this paper we introduce various method for the load management.
This paper analyzes competition among service stations in the Korean gasoline market. We consider spatial differentiation as a source of product differentiation as well as the characteristics of the stations and vertical contracts between refiners and retailers as factors causing changes in equilibrium prices in the Korean gasoline retail market. The effect of the government's price disclosure policy on the retail market competition is also analyzed. Moran's I test indicates that the prices of neighboring gas stations are spatially correlated in the market. It is also found that gasoline prices for vertically integrated stations are much lower than those for independent stations. In addition, unbranded stations charge lower prices than branded stations but also induce branded stations to price more competitively. Meanwhile, the government's price disclosure policy did intensify price competition in the retail gasoline market. It is inferred that the price disclosure policy contributed to retailers gaining more bargain power in price negotiation with refiners, causing an eventual increase in retail prices.
Journal of Korea Society of Industrial Information Systems
/
v.20
no.4
/
pp.25-37
/
2015
The early studies indicated that the firm with monopoly power is likely to engage in X-inefficiency such as a managerial slack. The reflection of the X-inefficiency theory has led to the issue that the public sector may be more inefficient than the private sector. In Korea like other many countries the electricity gas water service which can be considered as natural monopoly have been provided mostly by the public sector. In order to provide the empirical evidence to the argument that the public sector may be more inefficient than the private sector this paper estimated the four types of Solow residual which is called the total factor productivity in the electricity gas water service industry with the associated empirical model and compared its productivity with one in the manufacturing industry. The empirical results do not support the argument that the public sector may be more inefficient or less productive than the private sector.
Journal of Agricultural Extension & Community Development
/
v.30
no.4
/
pp.199-212
/
2023
Recently, despite the active interest and research on biochar, there is a lack of research on the acceptance intention of farmers, who are technology adopters. Accordingly, the purpose of this study was to conduct a survey of 168 farmers and structurally analyze the factors affecting farmers' intention to accept biochar. The analysis results are as follows. First, promotion conditions and network effects have a positive influence on farmers' intention to accept biochar. Second, the mediating variable, network effect, has a complete mediating effect between performance expectations, social influence, and acceptance intention. This suggests that organizations need to be utilized to spread biochar because network effects increase the explanatory power of acceptance intention.
Many countries are trying to develope the sustainable energy and environmental protection through a more concrete international cooperation. In this paper, the necessity and technical & economical feasibility on the interconnection of power systems in the South Korea, North Korea and North East Asia Region are emphasized with reference to the interconnection between the integrated power system according to the reunification of Germany and the Western European Power System. The Germany has a similar experience of separation and disconnection of their power system what happened in the Korean peninsula. Particularly the Power Economics And Clean Environment Network that could contribute to the PEACE promotion. Through the PEACE NETWORK PROJECT, the interconnection of power systems in North-Eastern Asia should be discussed in serious.
Proceedings of the Technology Innovation Conference
/
1999.06a
/
pp.176-202
/
1999
Korea has exerted her efforts to assimilate nuclear power technology, and reportedly localized 95 percent of nuclear power technology by 1995. This paper investigates the evolution of nuclear power program in Korea to exploit the development process of the nuclear power industry and key factors for the technological localization of nuclear power plant. In developing countries, an imitative catching-up process can be shown as a course for developing the absorptive capacity of foreign technology, which depends on prior knowledge base and the intensity of effort. The process of technological learning consists of five stages including preparation, implementation of foreign technology, acquisition of peripheral technology, acquisition of core technology, and improvement f foreign technology. Moreover, this paper discusses six essential factors that have influenced the successful achievement of technological localization of nuclear power plants in Korea. They include the role and strategies of the government, the leading role of utility firm, the development and cooperation of the related organizations, the development of human resources and their efforts, market conditions and the assistance of foreign donors, and social conditions. Finally, this paper discusses about implications offered by the Korean experience for other developing countries.
There are many successful cases in power interconnection among European and South American countries. However, that is not the case in Northeast Asian countries. Even though there will be a considerable benefit in power interconnection in Northeast Asian countries, there will be some difficulties due to various interest relationship and constraints among countries in Northeast Asia. GTMax(Generation and Transmission Maximization) Program is a very useful tool to analyze competitive electricity market and power interconnection developed by Argonne National Laboratory under the Department of Energy in the USA. This study tried to verify applicability and usefulness by GTMax model to domestic electric power system and power transfer from Russia Far East by power interconnection. When the power by importing from Russia is 2,000MW(around 2% of domestic installed capacity in 2017), there is no impact on domestic electricity market because of small power transfer. The power by importing should be large enough for achieving greater cost reduction by power interconnection. Besides, it would be better to supply power to Kyung-In region directly in reducing overall cost when the power by importing from Russia are sold at low price. In the case of interconnecting Young-Dong region, if it is not possible to upgrade transmission line with power transfer capabilities between Young-Dong and Kyung-In region, then the power by importing from Russia can replace the power produced in Jung-Bu region and the relative benefit of importing power can be reduced.
Since catastrophe from explosion of Hukushima nuclear power plant, concerns over possibility of exposure to radioactive matter has been disseminating all over the world and frequent accidents of domestic nuclear power plants also has been amplifying throughout the nation. In the past, major focus was made on compensation for local residents who live nearby nuclear power plants, but focal point of this study is on wage premium of workers who are employed in R&D of nuclear power plants. It is difficult to derive socially desirable result if private sectors are responsible for compensation on workers who suffer from physical damages due to the exposure to radioactive matter. Because victims should verify the damages that occur in the working places. This study conducted a survey on which job would prefer the respondents who are engaged with the nuclear R&D projects as exposure levels to radioactive matter, security of job, location of firms, and work intensity differ. As a result, exposure to radioactive matter was the most important attribute in choosing alternative jobs followed by job security, work intensity and job location. Annual willingness to pay for reduction of exposure to radioactive matter was estimated as 7730~7770 thousand KRW depending on different econometric models. Therefore, Korean government should prepare institutional foundation in order that appropriate compensation should be made on workers who are engaged in R&D projects on nuclear power plants if they have damages from the exposure to radioactive matter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.