• Title/Summary/Keyword: Power Market Simulator

Search Result 18, Processing Time 0.03 seconds

Electrical Characteristics of Mono Crystalline Silicon Solar Cell for Concentrating PV System using Fresnel Lenses (프레넬 렌즈를 이용한 집광 시 단결정 실리콘 태양전지의 전기적 특성)

  • Kang, Kyung-Chan;Kang, Gi-Hwan;Yu, Gwon-Jong;Huh, Chang-Su
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.218-219
    • /
    • 2007
  • Silicon feed stock shortage have acted as major restraints for growth of photovoltaic industry. Concentrating photovoltaic (CPV) system will reduce the use of silicon PV materials. This paper presents the application possibility of mono-crystalline silicon solar cell, which has increased in market share, for PV concentrator. We measured the power of solar cell using sun simulator and I-V curve tracer and compared the results. The comparison of results showed that the concentrated solar cell generated the power more approximately 7 times than without concentration in spite of non-heat sink. If CPV technology included heat sink combines already developed PV tracking system, it will have a merit economically.

  • PDF

Empirical Approach to Price Modeling in Electricity Market based on Stochastic Process (확률과정론적 기반의 전력시장가격모델링 기법)

  • Kang, Dong-Joo;Kim, Bal-Ho H.
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.4
    • /
    • pp.95-102
    • /
    • 2010
  • As the electric power industry is evolving into competitive market scheme, a new paradigm is required for the operation of market. Traditional dispatch algorithm was built based on the optimization model with an objective function and multiple constraints. Commercial market simulator followed the concept of the microeconomic model used in the dispatch algorithm, which is called as analytic method. On analytic method it is prerequisite to procure the exact data for the simulation. It is not easy anymore for each market participant to access to other participants' financial information while it used to be easy for monopoly decision maker to know all the information needed for the optimal operation. Considering the changing situation, it is required to introduce a new method for estimating the market price. This paper proposes an empirical method based on stochastic processes expected to build a capacity planning and long term contracts.

Design of MOS(Market Operation System) Simulator (전력시장운영시스템 시뮬레이터 설계)

  • Lee, Kang-Jae;Lee, Gun-Woong;Hwang, Kyung-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.347-348
    • /
    • 2007
  • 전력산업에 당초 도입 예정되었던 도매경쟁시장을 운영지원하기 위하여 전력거래소는 지난 2002년 도매경쟁 전력시장 운영시스템(Two Way Bidding Pool Market Operation System; TWBP MOS, 이하 전력시장운영시스템)을 구축하였다. 그러나 이후 배전분할 잠정 중단정책에 따라 구축 완료된 시스템은 실 업무에 적용해보지도 못한 채 폐기될 수도 있는 상황이 발생하였다. 하지만 전력거래소는 배전분할 잠정 중단에 따른 발전 경쟁시장(CBP; Cost-Based Pool) 장기화에 대비, 운영상의 효율성을 개선하고 기 개발된 전력시장운영시스템을 활용하여 급전체계를 개선하는데 성공하였다. 실시간 급전 운영을 위해 기존 EMS에 전력시장운영시스템을 연계하여 전력시장운영시스템의 5분 단위 수요 예측량을 기반으로 송전망 제약과 예비력 요구량 등을 고려한 발전기별 경제부하 배분량 및 예비력 배분량을 결정하고, 추가적으로 EMS에서 수요예측 오차 및 주파수 보정량을 실시간으로 계산하여 발전기별로 배분하도록 함으로써, 1일 전 시행하던 급전계획을 취득 자료를 기반으로 5분 단위로 실시간 계산할 수 있도록 급전 개선하였다. 이를 통해 실시간으로 에너지와 예비력을 동시에 최적화함으로써 전력시장 및 전력계통 운영을 한층 선진화 할 수 있는 계기를 마련하였으며 또한 저비용 발전기 사용을 극대화함으로 발전비용의 절감에도 기여하는 효과를 가져왔다. 이러한 긍정적인 효과에도 불구하고, 전력시장윤영 시스템은 구축된 모든 설비 및 프로그램을 당초 목적에 맞게 활용하지 못한다는 이유 등으로 시스템의 최적화 및 성능 개선에 대한 투자가 망설여지는 현실이다. 특히 온라인 실시간 시스템과 별도로 전력시장운영을 모의 할 수 있는 시뮬레이터가 구축되지 않아 시장의 흐름을 사전 예측하거나 시스템 오류 등을 재현하여 재발 대책 등을 마련하기가 매우 어려운 실정이다. 이에 본 논문에서는 그동안 쌓아온 전력거래소의 전력시장운영시스템 운영관리에 대한 다양한 경험을 바탕으로 구축비용을 획기적으로 절감할 수 있는 전력시장운영시스템 시뮬레이터의 구축방안을 제시하고자 한다.

  • PDF

Functional Test of A Station of Control System for Power Plant (발전소 제어시스템 기본 스테이션 기능 검증)

  • Byun, Seung-Hyun;Park, Doo-Yong;Lim, Ick-Hun
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.48 no.4
    • /
    • pp.25-32
    • /
    • 2011
  • A control system has been developed by korean engineers for 500MW korean standard type fossil power plant with the advent of retrofit of old control system. The developed control system is required to verify in terms of function and reliability prior to application to a power plant because a power plant is a very important facility in the industry. It is difficult to secure the enough period for installing the control system and commissioning due to the gradual increase of power demand and competitive power market environment. It is essential to verify the control system in order to reduce trial and error cases during overhaul period for application of control system to the power plant. This paper shows the case study of a functional test of a station of control system for power plant.

A Development of VPP Platform for the Efficient Utilization of Distributed Renewable Energy Resources (분산 재생에너지의 효율적 활용을 위한 가상발전소(VPP) 플랫폼 개발에 관한 연구)

  • Cho, Young-Hyeok;Baek, Seung-Yup;Choi, Won-Yong;Jeong, Dae-Yul
    • The Journal of Information Systems
    • /
    • v.27 no.2
    • /
    • pp.95-114
    • /
    • 2018
  • Purpose The recent concern over environmental problems such as greenhouse gas emission and fine dust contributes increasing interest in renewable energies. However the intrinsic characteristics of renewable energies, intermittent and stochastic generation, might cause serious problems to the stability and controllability of power grid. Therefore countermeasures such as virtual power plant (VPP) must be prepared in advance of the spread of uncontrollable distributed renewable energy resources to be one of major energy sources. Design/methodology/approach This study deals with the design concept of the VPP platform. we proposed as a technology solution for achieving the stability of power grid by guaranteeing a single power profile combining multiple distributed power sources with ICT. The core characteristics of VPP should be able to participate in the grid operation by responding to operation instructions from the system operator, KPX, as well as the wholesale electricity market. Findings Therefore this study includes energy storage device(ESS) as a controllable component as well as renewable energy resources such as photovoltaic and wind power generation. Based on this configuration, we discussed core element technologies of VPP and protype design of VPP solution platform according to system requirements. In the proposed solution platform, UX design for the integrated control center and brokerage system were included as well as ancillary service function to respond to KPX's operation instruction with utilizing the capability of ESS. In addition, a simulator was suggested to verify the VPP operations.

A Study on Development of Real-Time Simulator for Electric Traction Control System (TCS(Traction Control System)을 위한 실시간 시뮬레이터 개발에 관한 연구)

  • Kim, Tae Un;Cheon, Seyoung;Yang, Soon Young
    • Journal of Drive and Control
    • /
    • v.16 no.3
    • /
    • pp.67-74
    • /
    • 2019
  • The automotive market has recently been investing much time and costs in improving existing technologies such as ABS (Anti-lock Braking System) and TCS (Traction Control System) and developing new technologies. Additionally, various methods have been applied and developed to reduce this. Among them, the development method using the simulation has been mainly used and developed. In this paper, we have studied a method to develop SILS (Software In the Loop Simulation) for TCS which can test various environment variables under the same conditions. We modeled hardware (vehicle engine and ABS module) and software (control logic) of TCS using MATLAB/Simulink and Carsim. Simulation was performed on the climate, road surface, driving course, etc. to verify the TCS logic. By using SILS to develop TCS control logic and controller, it is possible to verify before production and reduce the development period, manpower and investment costs.

A Study on The Security Vulnerability Analysis of Open an Automatic Demand Response System (개방형 자동 수요 반응 시스템 보안 취약성 분석에 관한 연구)

  • Chae, Hyeon-Ho;Lee, June-Kyoung;Lee, Kyoung-Hak
    • Journal of Digital Convergence
    • /
    • v.14 no.5
    • /
    • pp.333-339
    • /
    • 2016
  • Technology to optimize and utilize the use and supply of the electric power between consumer and supplier has been on the rise among the smart grid power market network in electric power demand management based on the Internet. Open Automated Demand Response system protocol, which can deliver Demand Response needed in electric power demand management to electricity supplier, system supplier and even the user is openADR 2.0b. This paper used the most credible, cosmopolitanly proliferated EPRI open source and analysed the variety of security vulnerability that developed VEN and VTN system may have. Using the simulator for attacking openADR protocol, the VEN/VTN system that has been implemented as EPRI open source was conducted to attack in a variety of ways. As a result of the analysis, we were able to get the results that the VEN/VTN system has security vulnerabilities to the parameter tampering attacks and service flow falsification attack. In conclusion, if you want to implement the openADR2.0b protocol system in the open or two-way communication environment smart grid network, considering a variety of security vulnerability should be sure to seek security technology and services.

Design of a Binding for the performance Improvement of 3D Engine based on the Embedded Mobile Java Environment (자바 기반 휴대용 임베디드 기기의 삼차원 엔진 성능 향상을 위한 바인딩 구현)

  • Kim, Young-Ouk;Roh, Young-Sup
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.11
    • /
    • pp.1460-1471
    • /
    • 2007
  • A 3-Dimensional engine in a mobile embedded device is divided into a C-based OpenGL/ES and a Java-based JSR184 which interprets and executes a byte code in a real-time. In these two standards, the JSR184 supporting Java objects uses more processor resources than an OpenGL/ES and thus has a constraint when it is used in an embedded device with a limited computing power. On the other hand, 3-Dimensional contents employed in existing personal computer are created by utilizing advantages of Java and secured numerous users in European market, due to the good quality in contents and extensive service in a commercial network, GSM. Because of the reason, a mobile embedded device used in a GSM network needs a JSR184 which can provide an existing Java-based 3-Dimensional contents without extra conversion processes, but the current version of Java-based 3-Dimensional engine has drawbacks in application to commercial products because it requires more computing power than the mobile embedded device. This paper proposes a binding technique with the advantages of Java objects to improve a processing speed of 3-Dimensional contents in limited resources of a mobile embedded device. The technique supports a JSR184 standard interface in the upper layer to utilize 3-Dimensional contents using Java, employs a different code-conversion language, KNI(Kilo Native Interface), in the middle layer to interface between OpenGL/ES and JSR184, and embodies an OpenGL/ES standard in the lower layer. The validity of the binding technique is demonstrated through a simulator and a FPGA embedding an ARM.

  • PDF