In this paper, we propose a new node architecture LonWorh control Network for home network system environmint using power line communications. Using conventional Lon Work technology is a many disputable points for home network. LonWork network system needs high-cost development equipment. Moreover, conventional Lon Work system can not implement high-grade algorithms and variety application operation. because of the limitation of processing ability in Neuron chip. For that reason, the proposed structure is applicable to low-cost and more complex applications which are impossible in home network using conventional Lonworks structure. The proposed structure is implemented with some hardware and かone software for power line home network. The physical layer and the MAC layer of the LonTalk protocol within ton Work are implemented in hardware, which decreases the development costs communication processor. The upper of link layer of the LonTalk protocol is implemented with software, which decreases the development costs of software and increases the flexibility of tile system and increases the extension of the system. We verified the commercial feasibility of the proposed system through the power line tests with the existing LonWorks network in home network. As a result, it is concluded that the proposed architecture provides increasing flexibility and decreasing cost of the system.
Park, K.W.;Seo, H.C.;Kim, C.H.;Jung, C.S.;Yoo, Y.P.;Lim, Y.H.;Lee, W.J.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.3
/
pp.465-471
/
2007
The one step type pole and two step type pole are used in KEPCO's distribution system. The neutral current increases in three-phase four-wire distribution system due to unbalanced load. Usually, power line and communication line are installed at contiguity by effect of topography in Korea. To this end, the damages such as electrostatic induction, electromagnetic induction and harmonic induction generated by induced voltage and current are occured in power line and communication line. This paper calculates the neutral current in KEPCO's distribution system using EMTP by composing various simulated conditions. Also, these results are verified by vector analysis.
Journal of electromagnetic engineering and science
/
v.9
no.4
/
pp.175-181
/
2009
The measurements were performed to verify experimentally that the voltage arising on a telecommunication line by a power line is due to the induction phenomena because there has been an opinion that the arising voltage on a telecommunication line is not by induction, but by other causality. The voltage appeared on the telecommunication line by way of an electric field or magnetic field generated by the source apparatus that had been artificially made to provide intentional constant high-voltage or current in ELF, that is, 60 Hz as an emulated commercial power.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.6
/
pp.115-121
/
2011
Intelligent distribution equipment is inevitable to realize self-healing which is one of smart grid functions in distribution network. Therefore, most of distribution equipment have been developed with self diagnostic sensors. However, it is not effective to construct on-line monitoring system for underground distribution cable because of high cost and low sensitivity. Recently, optical fiber composite cable is being considered for communication and power delivery in order to cope with increasing communication in distribution network. This paper presents the design and performance assessment results of underground cable on-line monitoring system using DTS(Distributed Temperature Sensing) and optical fiber composite underground cable.
Kim, Young-Sung;Jeong, Jung-Il;Kim, Jae-Chul;Cho, Sung-Min
Proceedings of the KIEE Conference
/
2007.07a
/
pp.533-534
/
2007
This paper investigates impulsive noise from a pole transformer in low voltage distribution system for power line communication. EMI noise from the pole transformer is indicated from the experiment. The noise has certain characteristics because it is caused by partial discharge. The noise level is above -35dBm without a filter. Therefore, the filter which is made of ferrite is used in order to eliminate the noise. the noise filters should be applied to both the phase line and the neutral line. Otherwise, It is likely to have little overall impact on elimination of noises. the performance of filter is verified with various experiments. In conclusion, the equivalent circuit of power line communication including noise source is described as a lumped circuit.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.64
no.4
/
pp.291-296
/
2015
Transmission line is exposed to a large area, and then faults are likely to occur than the other component of power system. When a fault occurs on a transmission line, fault locator helps fast recovery of power supply on power system. This paper deals with the design of a digital fault locator for improvement accuracy of the fault distance estimation and a fault occurrence position for transmission line. The algorithm of a fault locator uses a DC offset removal filter and DFT filter. The algorithm utilizes a fault data of GPS time synchronized. The computed fault information is transmitted to the other side substation through communication. The digital fault locator includes MPU module, ADPU module, SIU module, and a power module. The MMI firmware and software of the fault locator was implemented.
Kim, Kyung-Won;Seo, Min-Cheol;Cho, Jae-Yong;Yoo, Sung-Cheol;Kim, Min-Su;Kim, Hyung-Cheol;Oh, Jun-Hee;Sim, Jae-Woo;Yang, Youn-Goo
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.21
no.2
/
pp.121-128
/
2010
This paper presents a design of a 100 W high-efficiency power amplifier, whose operational frequency band expands from 30 to 512 MHz, using negative feedback network, push-pull structure, broadband RF choke, and transmission line transformer for balun configuration. The push-pull amplifier has been tuned for higher output power using a shunt capacitor as a matching component at its load especially for high-frequency region. The implemented power amplifier exhibited a very flat power gain of $18.34{\pm}0.9\;dB$ throughout the operating frequency band and very high power-added efficiency(PAE) of greater than 40% at an output power of 100 W. It also showed second- and third-harmonic distortion levels of below -34 dBc and -12 dBc, respectively, through the entire operating frequency band.
Currently digital communication system adapt various digital modulation schemes. All these communication systems are required to cause the minimum interference to adjacent channels, they must therefore employ the linear power amplifiers. In respect to linear power amplifiers, there are many linearization techniques. Feedforward power amplifier represent very wide bandwidth and high linearization capability. In the feedforward systems overall efficiency is reduced due to the loss of delay line. In this paper, delay filter instead of transmission delay line adapted to get more high efficiency. Experimental results showed that ACLR has improved 17.04dB which is added 2.54dB by using the delay filter.
International Journal of Advanced Culture Technology
/
v.11
no.1
/
pp.395-402
/
2023
The implementation of a hybrid network utilizing Power Line Communication (PLC) and Wi-Fi technologies has been demonstrated to improve signal strength and coverage in areas with poor connectivity due to internet shadow areas. In this study we strategically positioned Wi-Fi relays and utilized the capabilities of PLC technology to significantly improve signal strength and coverage in areas with poor connectivity. We also analyzed the effects of metallic obstacles on Wi-Fi signal propagation and proposed a solution to strengthen the signal enough to pass through them. Our experiment demonstrated the feasibility and potential of using this hybrid network in industrial scenarios for real-time data transmission. Overall, the results suggest that the use of PLC and Wi-Fi hybrid networks can be a cost-effective and efficient solution for overcoming internet connectivity challenges and has the potential to provide high-speed internet access to areas with unreliable signals.
Journal of Korea Society of Digital Industry and Information Management
/
v.15
no.4
/
pp.9-17
/
2019
Sun power generation systems which use large capacity centralized inverters have loss of power generation due to cloud and building shadows, pollution, cell deterioration, etc. To minimize loss of power generation, decentralized solar power systems using multiple micro-inverters are being proposed as an alternative. A distributed solar power system consisting of a system-connected system uses power line communication to collect data from the micro-inverters. Power line communication has the advantage of using power lines without separate lines for data transmission, but in distributed solar power generation systems that use a large number of micro-inverters, the bit error rate is less reliable due to the phenomenon caused by limited transmission power, high load interference and noise, variable signal attenuation, and impedance characteristics. So we proposed wireless intelligent controller for micro-inverter that is used to build distributed solar power systems. and we design and implement that. Further, the proposed wireless intelligent controller for micro-inverter was used to establish a small-volume solar power plant to check its function and operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.