• 제목/요약/키워드: Power Line Interference

검색결과 201건 처리시간 0.041초

Common Model EMI Prediction in Motor Drive System for Electric Vehicle Application

  • Yang, Yong-Ming;Peng, He-Meng;Wang, Quan-Di
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.205-215
    • /
    • 2015
  • Common mode (CM) conducted interference are predicted and compared with experiments in a motor drive system of Electric vehicles in this study. The prediction model considers each part as an equivalent circuit model which is represented by lumped parameters and proposes the parameter extraction method. For the modeling of the inverter, a concentrated and equivalent method is used to process synthetically the CM interference source and the stray capacitance. For the parameter extraction in the power line model, a computation method that combines analytical method and finite element method is used. The modeling of the motor is based on measured date of the impedance and vector fitting technique. It is shown that the parasitic currents and interference voltage in the system can be simulated in the different parts of the prediction model in the conducted frequency range (150 kHz-30 MHz). Experiments have successfully confirmed that the approach is effective.

계통연계형 인버터 병렬운전 시 LCL 필터 상호간섭 특성 연구 (A Study for Mutual Interference of LCL Filter Under Parallel Operation of Grid-Connected Inverters)

  • 이강;서정진;차한주
    • 전력전자학회논문지
    • /
    • 제26권2호
    • /
    • pp.75-81
    • /
    • 2021
  • This study analyzes the resonance characteristics caused by the mutual interference between LCL filters and the grid impedance under the parallel operation of the grid-connected inverter using the LCL filter. These characteristics are verified through simulation and experiment. Two inverters are used to connect to the grid in parallel, and the system parameters, including the LCL filter, are set to the same conditions. In the case of inverters running in parallel at the point of common coupling, the presence of grid impedance causes mutual interference between the LCL filters of each inverter, and the deviation of the filter resonance frequency is analyzed to understand the parallel inverter. The correlation between the number of devices and the size of grid impedance is simulated by PSIM and verified by MATLAB. By connecting the real-time digital simulator Typhoon HILS to the DSP 28377 control board, the mutual interference characteristics are tested under the condition of two inverters running in parallel. The experimental and analysis results are the same, indicating the validity of the analysis.

UHF대역에서의 SEAMCAT을 이용한 간섭 분석기법에 관한 연구 (A study on the Analysis Method of Interference using SEAMCAT in UHF band)

  • 조승일;장경승;강성철;이주환;강정진;최규석;차재상;김성권
    • 한국인터넷방송통신학회논문지
    • /
    • 제8권6호
    • /
    • pp.119-125
    • /
    • 2008
  • 본 논문에서는 가시거리가 확보가 되는 임의의 산간지형에서 UHF대역의 주파수 환경의 모델링을 제안한다. UHF대역을 사용하는 송신국은 Wt(Wanted Transmitter)로 정의하고 수신국은 Vr(Victim Receiver)로 정의하여 Victim link로 설정하며, 간섭원은 It(Interference Transmitter)와 Wr (Wanted Receiver)으로 정의하여 Interference link로 설정한다. Monte-Carlo 방식을 이용하는 전파간섭분석 시뮬레이션 툴인 SEAMCAT(Spectrum Engineering Advanced Monte Caelo Analysis Tool)을 사용하여 모델링된 주파수 환경을 시뮬레이션 한 결과와 임의의 산간지형에서 측정한 실측데이터를 비교하였다. SEAMCAT의 dRSS(desired Received Signal Strength)계산 값은 지형에 의해 생기는 손실이 있기 때문에 UHF 대역에서 수신 전력에서 70% 오차를 나타냄을 알 수 있었다. 따라서 지형에 의한 간섭회절만큼의 송신전력을 줄임으로써 실제 전파 환경과 유사한 가정을 할 수 있게 하였다. 본 논문에 제시된 UHF 주파수 환경에서의 시뮬레이션 모델링은 UHF 주파수 재배치 및 간섭분석 연구에 기여할 것으로 기대된다.

  • PDF

전력설비의 전기환경장해 (Electrical Environmental Effects of Power System)

  • 신구용;;이동일;윤진열;김상범;김정부
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제13권2호
    • /
    • pp.156-156
    • /
    • 1999
  • This paper describes the characteristics and the criteria of electrical environmental effects produced from power system especially transmission line. Audible noise radio and TV interference, electric and magnetic inductions which are main items for optimal conductor selection as well as major contributors to the community complaint of electrical environmental problem, are surveyed and studied comparing with the criteria or the environmental protection regulation of domestic and foreign countries. As a result a domestic criteria of electrical environmental on power system was suggested.

상용화 드론을 이용한 송전선로 점검방안 및 현장시험 (Patrol Monitoring Plan for Transmission Towers with a Commercial Drone and its Field Tests)

  • 김석태;박준영;이재경;함지완;최민희
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제4권2호
    • /
    • pp.115-123
    • /
    • 2018
  • 과거 송전선로를 점검하기 위하여 선로를 주행하는 로봇시스템을 이용하여 점검방법이 있었으나 선로를 주행하기 위한 구동장치와 장애물을 회피하기 위한 복잡한 메커니즘 등으로 시스템 자체가 무거워 선로에 설치하기가 어렵고 선로의 장애물을 완벽하게 회피하여 주행하지 못하는 단점이 있었다. 그래서 공중에서 비행하며 점검하는 비행로봇 형태가 개발됐고 최근 회전익 멀티콥터 형태 드론의 비행안정도가 높아짐에 따라 전력산업에도 전력설비 점검에 이용되기 시작했다. 배전설비를 수동조종으로 비행하는 드론을 이용하여 점검해 왔다. 그러나 송전선로나 철탑의 경우, 설비 규모가 크고 경간 거리가 멀어 비행 중인 드론의 위치와 송전선로간의 거리를 가늠하기 어렵기 때문에 드론을 수동으로 시계비행하며 송전선로를 점검하기에는 선로와의 충돌위험에서 자유롭기 어렵다. 또한, 수동조종으로 선정된 웨이포인트(Way-point)에 의존한 자동비행점검도 송전선로에 형성되는 자기장에 의해 드론의 전자식 나침판이 오작동하여 비행방향의 오류를 초래하므로 송전선로와의 충돌 가능성이 여전히 상존한다. 그러므로 본 논문에서는 송전선로의 자기장을 영향에 대한 드론점검 작업환경을 조사하고 이를 근거로 자기장 영향권 밖에서 비행경로를 생성하여 고배율카메라와 열화상 카메라가 탑재된 상용화 드론을 이용하여 자동비행하면서 송전선로를 점검할 수 있는 체계를 소개한다. 또한, 이 점검체계를 이용하여 충남지역의 154 kV, 345 kV, 765 kV 등 전압별 실 선로에 대하여 적용한 현장시험결과를 소개하고자 한다.

Tug에 의한 반잠수식 해양 구조물 위치 유지를 위한 제반 파라메터 검토 (Parameter Study of Position Keeping for Semi-submersible Offshore Structure by Tugs)

  • 이진호;박준흠;장학수
    • 한국해양공학회지
    • /
    • 제28권4호
    • /
    • pp.274-279
    • /
    • 2014
  • This paper investigates the line dynamic forces connecting tugs and a floater, where the planar motion of the floater is due to the weather criteria during the position keeping of the offshore structure by tugs. The analysis situation consists of the position keeping states for the seabed mooring line connection work of the offshore structure at the offshore site. Specifically, the decision about the tug power capacity for the position keeping is essential and depends on the weather criteria, line characteristics, length of line, etc. The planar motion of the structure is constrained by the interference of the installation vessel's operational range, behavior of the underwater fairlead, and other surrounding structures. In this paper, the tug line forces and planar motion of an offshore structure are summarized dependent on the tug line length and line material characteristics in the states fora given floater draft and weather criteria. The tug line dynamic forces and planar motion evaluated here will be used to determine the proper tug power and clearance of an offshore structure.

A Possible Path per Link CBR Algorithm for Interference Avoidance in MPLS Networks

  • Sa-Ngiamsak, Wisitsak;Varakulsiripunth, Ruttikorn
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2004년도 ICCAS
    • /
    • pp.772-776
    • /
    • 2004
  • This paper proposes an interference avoidance approach for Constraint-Based Routing (CBR) algorithm in the Multi-Protocol Label Switching (MPLS) network. The MPLS network itself has a capability of integrating among any layer-3 protocols and any layer-2 protocols of the OSI model. It is based on the label switching technology, which is fast and flexible switching technique using pre-defined Label Switching Paths (LSPs). The MPLS network is a solution for the Traffic Engineering(TE), Quality of Service (QoS), Virtual Private Network (VPN), and Constraint-Based Routing (CBR) issues. According to the MPLS CBR, routing performance requirements are capability for on-line routing, high network throughput, high network utilization, high network scalability, fast rerouting performance, low percentage of call-setup request blocking, and low calculation complexity. There are many previously proposed algorithms such as minimum hop (MH) algorithm, widest shortest path (WSP) algorithm, and minimum interference routing algorithm (MIRA). The MIRA algorithm is currently seemed to be the best solution for the MPLS routing problem in case of selecting a path with minimum interference level. It achieves lower call-setup request blocking, lower interference level, higher network utilization and higher network throughput. However, it suffers from routing calculation complexity which makes it difficult to real task implementation. In this paper, there are three objectives for routing algorithm design, which are minimizing interference levels with other source-destination node pairs, minimizing resource usage by selecting a minimum hop path first, and reducing calculation complexity. The proposed CBR algorithm is based on power factor calculation of total amount of possible path per link and the residual bandwidth in the network. A path with high power factor should be considered as minimum interference path and should be selected for path setup. With the proposed algorithm, all of the three objectives are attained and the approach of selection of a high power factor path could minimize interference level among all source-destination node pairs. The approach of selection of a shortest path from many equal power factor paths approach could minimize the usage of network resource. Then the network has higher resource reservation for future call-setup request. Moreover, the calculation of possible path per link (or interference level indicator) is run only whenever the network topology has been changed. Hence, this approach could reduce routing calculation complexity. The simulation results show that the proposed algorithm has good performance over high network utilization, low call-setup blocking percentage and low routing computation complexity.

  • PDF

Evolution Strategy 알고리즘을 이용한 송진선로 주변에서의 최적 자계차폐 위치선정 (Decision of Optimal Magnetic Field Shielding Location around Power System Using Evolution Strategy Algorithm)

  • 최세용;나완수;김동훈;김동수;이준호;박일한;신명철;김병성
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제51권1호
    • /
    • pp.5-14
    • /
    • 2002
  • In this paper, we analyze inductive interference in conductive material around 345 kV power transmission line, and evaluate the effects of mitigation wires. Finite element method (FEM) is used to numerically compute induced eddy currents as well as magnetic fields around powder transmission lines. In the analysis model, geometries and electrical properties of various elements such as power transmission line, buried pipe lines, overhead ground wire, and conducting earth are taken into accounts. The calculation shows that mitigation wire reduces fairly good amount of eddy currents in buried pipe line. To find the optimum magnetic field shielding location of mitigation wire, we applied evolution strategy algorithm, a kind of stochastic approach, to the analysis model. Finally, it was shown that we can find more effective shielding effects with optimum location of one mitigation wire than with arbitrary location of multi-mitigation wires around the buried pipe lines.

고속 전철용 단상 PWM 컨버터의 고조파 저감에 관한 연구 (A Study on the Harmonic Reduction of the Single Phase PWM Converter for High Speed Rail)

  • 박정배;임훈규;이광운;여형기;유지윤
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1998년도 전력전자학술대회 논문집
    • /
    • pp.5-9
    • /
    • 1998
  • In the high speed rail system, the distortion of the voltage and the current waveform of the input power line increases the power loss and make a several electro-magnetic problems such as EMI or the interference of the communication line. In this paper, the control scheme of the PWM converter to make a good power factor and to regulated the output voltage as well as to reduce the harmonic component of the input current is proposed. Also a control schem of the PWM converter in the parallel operation to reduce the harmonics of the input current is proposed

  • PDF

고속 전철구간에서의 전력유도 환경 영향 분석 (Environmental Effect Analysis of Electromagnetic Induction in Express Electric Railway)

  • 이상무;최문환;조평동
    • 정보통신설비학회논문지
    • /
    • 제9권1호
    • /
    • pp.19-23
    • /
    • 2010
  • The Electromagnetic Interference could occur due to power line on the telecommunication service. The Countermeasure is practised by legal law. Various affecting factors are described in the law. In this paper, an effect by pipeline especially in the ground, power feeding plant, and curved railway sector is analyzed as environmental factors which are not included in the law. By the practical measurement, it appears that the measured voltages on the spots with underground pipeline are grouped into lower voltage level, induced voltage tends to be high near power feeding plant, and also in the curved railway line. These analytical results can be meaningly considered in the application of countermeasure.

  • PDF