• Title/Summary/Keyword: Power Facility

Search Result 1,286, Processing Time 0.029 seconds

DC Arc Characteristics Analysis according to U1699B Test Standardof the Status (태양광발전설비 DC 아크특성 분석)

  • Wan-Su Kim;Kwang-Muk Park
    • Current Photovoltaic Research
    • /
    • v.11 no.4
    • /
    • pp.118-123
    • /
    • 2023
  • The main cause of solar facility fires is arc, and in the last 3 years ('16 to '18), about 80% of domestic solar facility fires have been caused by arcs. The capacity of solar power facilities installed around the world continues to increase, and fires caused by arcs are also expected to increase as the solar power generation facilities that were initially installed become obsolete, In this paper, an arc generation test was conducted based on the UL1699B test standard. As a result of the test, the arc generation satisfied the minimum arc current according to the test conditions, and DC arc characteristics were analyzed through data such as arc voltage and arc current according to variables such as speed of moving electrodes and electrode spacing.

Effects of frequency ratio on bridge aerodynamics determined by free-decay sectional model tests

  • Qin, X.R.;Kwok, K.C.S.;Fok, C.H.;Hitchcock, P.A.
    • Wind and Structures
    • /
    • v.12 no.5
    • /
    • pp.413-424
    • /
    • 2009
  • A series of wind tunnel free-decay sectional model dynamic tests were conducted to examine the effects of torsional-to-vertical natural frequency ratio of 2DOF bridge dynamic systems on the aerodynamic and dynamic properties of bridge decks. The natural frequency ratios tested were around 2.2:1 and 1.2:1 respectively, with the fundamental vertical natural frequency of the system held constant for all the tests. Three 2.9 m long twin-deck bridge sectional models, with a zero, 16% (intermediate gap) and 35% (large gap) gap-to-width ratio, respectively, were tested to determine whether the effects of frequency ratio are dependent on bridge deck cross-section shapes. The results of wind tunnel tests suggest that for the model with a zero gap-width, a model to approximate a thin flat plate, the flutter derivatives, and consequently the aerodynamic forces, are relatively independent of the torsional-to-vertical frequency ratio for a relatively large range of reduced wind velocities, while for the models with an intermediate gap-width (around 16%) and a large gap-width (around 35%), some of the flutter derivatives, and therefore the aerodynamic forces, are evidently dependent on the frequency ratio for most of the tested reduced velocities. A comparison of the modal damping ratios also suggests that the torsional damping ratio is much more sensitive to the frequency ratio, especially for the two models with nonzero gap (16% and 35% gap-width). The test results clearly show that the effects of the frequency ratio on the flutter derivatives and the aerodynamic forces were dependent on the aerodynamic cross-section shape of the bridge deck.

Detection and Diagnosis of Power Distribution Supply Facilities Using Thermal Images (열화상 이미지를 이용한 배전 설비 검출 및 진단)

  • Kim, Joo-Sik;Choi, Kyu-Nam;Lee, Hyung-Geun;Kang, Sung-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.1-8
    • /
    • 2020
  • Maintenance of power distribution facilities is a significant subject in the power supplies. Fault caused by deterioration in power distribution facilities may damage the entire power distribution system. However, current methods of diagnosing power distribution facilities have been manually diagnosed by the human inspector, resulting in continuous pole accidents. In order to improve the existing diagnostic methods, a thermal image analysis model is proposed in this work. Using a thermal image technique in diagnosis field is emerging in the various engineering field due to its non-contact, safe, and highly reliable energy detection technology. Deep learning object detection algorithms are trained with thermal images of a power distribution facility in order to automatically analyze its irregular energy status, hereby efficiently preventing fault of the system. The detected object is diagnosed through a thermal intensity area analysis. The proposed model in this work resulted 82% of accuracy of detecting an actual distribution system by analyzing more than 16,000 images of its thermal images.

A Study on the Power Management Algorithm of Centralized Electric Vehicle Charging System (중앙제어기반 전기자동차 충전시스템의 에너지관리 알고리즘에 관한 연구)

  • Do, Quan-Van;Lee, Seong-Joon;Lee, Jae-Duck;Bae, Jeong-Hyo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.566-571
    • /
    • 2011
  • As Plug-in Hybrid Vehicle and Electric Vehicle (PHEV/EV) take a greater share in the personal automobile market, their high penetration levels may bring potential challenges to electric utility especially at the distribution level. Thus, there is a need for the flexible charging management strategy to compromise the benefits of both PHEV/EV owners and power grid side. There are many different management methods that depend on the objective function and the constraints caused by the system. In this paper, the schema and dispatching schedule of centralized PHEV/EV charging spot network are analyzed. Also, we proposed and compared three power allocation strategies for centralized charging spot. The first strategy aims to maximize state of vehicles at plug-out time, the rest methods are equalized allocation and prioritized allocation based on vehicles SoC. The simulation results show that each run of the optimized algorithms can produce the satisfactory solutions to response properly the requirement from PHEV/EV customers.

A central facility concept for nuclear microreactor maintenance and fuel cycle management

  • Faris Fakhry;Jacopo Buongiorno;Steve Rhyne;Benjamin Cross;Paul Roege;Bruce Landrey
    • Nuclear Engineering and Technology
    • /
    • v.56 no.3
    • /
    • pp.855-865
    • /
    • 2024
  • Commercial deployment of nuclear microreactors presents an opportunity for the industry to rethink its approach to manufacturing, siting, operation and maintenance, and fuel cycle management as certain principles used in grid-scale nuclear projects are not applicable to a decentralized microreactor economy. The success of this nascent industry is dependent on its ability to reduce infrastructure, logistical, regulatory and lifecycle costs. A utility-like 'Central Facility' that consolidates the services required and responsibilities borne by vendors into one or a few centralized locations will be necessary to support the deployment of a fleet of microreactors. This paper discusses the requirements for a Central Facility, its implications on the cost structures of owners and suppliers of microreactors, and the impact of the facility for the broader microreactor industry. In addition, this paper discusses the pre-requisites for eligibility as well as the opportunities for a Central Facility host site. While there are many suitable locations for such a capability across the U.S., this paper considers a facility co-located with the Vogtle Nuclear Power Plant and Savannah River Sites to illustrate how a Central Facility can leverage the existing infrastructure and stimulate a local ecosystem.

A Study on the Improving Power System Reliability According to the Reactive Power Problem in the Bulk Power Station (대전원단지의 무효전력 출력제약에 따른 영향에 대한 연구)

  • Song, Seok-Ha;Joo, Joan-Young
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.73-75
    • /
    • 2002
  • This paper presents the properly method of system security and facility countermeasures. We performed simulation for yearly peak of Korean power system in 2002 under the reactive power problem in a nuclear power plants. Analysis of the problems in power system operation by power flow, fault and stability study. Establishment of power system optimal operating plan by stabilizer and maintaining the reasonable voltage level.

  • PDF

A Study on the Application Method of Facility Classification System for the Development of Asset Management System for Power Generation Structures (발전구조물의 자산관리 시스템 구축을 위한 시설물분류체계 활용방안에 관한 연구)

  • Jeon, Seokhyeon;Jeong, Jeongsik;Ahn, Jinhee;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.113-118
    • /
    • 2019
  • Recently, the maintenance concept of infrastructure has been changed from the stability management of the structure determined by the safety inspection of the existing facilities to the asset management related to evaluating and managing the performance of the facilities. For management of the property of the facilities, it is necessary to efficiently classify their information for the maintenance and service level of the facilities and to manage them. In the case of power plant facility, especially, it is a complex structure, which is constructed in a various component and detail. In this study, therefore, the components of power plant facility were classified into facilities, spaces, parts, and elements considering the type of integrated construction classification system in Korea. To reflect the deterioration rate of the facility in accordance with environmental conditions such as airborne salt and humidity etc., it was classified by adding direction, interior, and exterior condition of each component not to be considered in the existing classification system for its effective and systematic maintenance, since it is generally located in the coastal area due to the operation of the power generation structure. The classification system developed in this study can be used as fundamental data for development of the computer system for asset management of power plant facility.

A Study on Starting Characteristic and Improvement for High Power Motor with Tunnel Boring Machine (TBM용 대용량 전동기의 기동 특성 및 개선 관한 연구)

  • Kim, Tae-Kue;An, Joon-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.68 no.1
    • /
    • pp.44-51
    • /
    • 2019
  • Tunnel Boring Machine's Technology has depends mostly on imports, currently domestic technology development was proceeding. There are many technologies in this field, above all, the large-capacity motor drive technology required for excavation is one of the core technologies. In particular, when several large motors are simultaneously starting, there are many problems due to a large starting current at that time, and it is difficult to design and operate a power receiving facility. In this paper, A method of reducing the starting current by using the regenerative power generated by the deceleration of the motor has been studied. To verify this proposal, we designed the induction motor controller using CAE based power simulation tool and verified the results of the proposed method by applying the reduced model. As a result, it is possible to reduce the maximum starting current and shorten the start-up time. Moreover, even if several motors are connected to one bank, it is proved that the method can be efficiently operated by using the sequential braking / starting sequence. In the case of a power system in which a large capacity electric motor such as a tunnel excavation system is driven, the results of this study are expected to be a stable and effective method for solving the start-up current problem and designing the power receiving facility.

The Evaluation of NOx Emission Factor from Large Combustion Facilities in Seoul (서울지역 대형연소시설에서의 질소산화물 배출계수 산정)

  • 조기찬;최종욱;박후경;유병태
    • Journal of environmental and Sanitary engineering
    • /
    • v.15 no.4
    • /
    • pp.78-83
    • /
    • 2000
  • The emission factor of nitrogen oxides(NOx) was evaluate to clarify the characteristics of NOx emitted from seven large combustion facilities in seoul area. The emission factors of NOx at A-1 and A-2 facilities of internal combustion engine were 66.957kgNOx/ton and 20.913kgNOx/ton, respectively. The emission factor of A-1 facility was higher than that of A-2 facility even same internal combustion engine, because A-1 facility adopted SCR(selective catalystic reactor) for reduction of NOx emission factor of A-2, A-4, and A-7 power generation boiler facilities were 4.300kgNOx/ton, 2.460kgNOx/ton and 1.796kgNOx/ton, respectively. The capacity of A-2 facility was about two times than that of A-4 and A-7. These emission factors were lower than those at facilities in other areas of korea, because of using low NOx burner of power generation boiler. The emission factors of NOx at A-3 and A-6 incinerator facilities were 0.147kgNOx/ton and 0.221kgNOx/ton which were lower than other facilities, respectively, because these facilities incinerate municipal solid waste of low heating value and uwe SCR for reducing NOx concentration.

  • PDF