• 제목/요약/키워드: Power/ground

검색결과 1,880건 처리시간 0.032초

전력 유도 장애 발생 시 통신 선로의 접지체 임피던스 크기가 유도 잡음 전압에 미치는 영향 분석 (Analysis on the Effects of the Induced Noise Voltage with the Impedance Changes of Telecommunication Line in the Power Inducting Situation)

  • 최문환;이상무;조평동
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2007년도 학술대회
    • /
    • pp.227-230
    • /
    • 2007
  • In this paper, we have analyzed the change characteristics of induced noise due to the impedance change of the ground in both ends of telecommunication line. As what affects the induced noise, there are power influence or longitudinal transverse voltages and its weighted filtered voltage. In the result of measurement, we can see the noise level change due to the change of the ground impedance, that is, as the ground impedance at either end of the telecommunication line become grower, the noise level is increased, and as the ground impedance at either end of the telecommunication line become smaller, the noise level is decreased. However, we can't define the relation between ground impedance size and PIF in these measurement results, so we will have to carry out the measurement more deeply and more practically with various conditions in environmental viewpoint and/or experimental viewpoint to establish the definition between ground impedance size and PIF.

  • PDF

Design of the Ground Resistance Measuring System to the Earth-Noise

  • Jung Min-Jae;Joo Hyung-Jun;Lee Ki-Hong;Oh Sung-Up;Jung Jae-Ki;Seong Se-Jin
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.566-570
    • /
    • 2001
  • Generally, grounding systems are responsible for the safe operation of a power system. Their performance guarantees equipment protection and personnel safety under condition of the limited ground potential rise and touch voltages as well as step voltages under ground fault conditions. Therefore, it is necessary to measure the ground resistance frequently for checking the performance of grounding system, In this paper the ground resistance measuring system using digital signal processor and high-performance L-C resonant band pass filter is presented. The signal current magnitude for measuring ground resistance in this system is $10^{-1}[A]\;to\;5\times10^{-2}[A]$ and the current frequency is 30[Hz].

  • PDF

변압기의 선간 단락사고 보호를 위한 지락비율차동 계전 알고리즘의 성능향상 방법 (Improved Ground differential relaying algorithm for the protection of a line-to-line fault of transformer)

  • 강해권;김진호;김세창;박종수;박종은
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.760-761
    • /
    • 2011
  • Ground differential relay is used to provide fast, sensitive, and selective protection for the wye connected and grounded electrical power equipment such as generators, power transformers, and grounding transformers. The ground differential protection only protects the ground faults within the protection zone, so that it can't protect the line-to-line fault. This paper proposes the algorithm to provide the protection for the line-to-line fault through the ground differential protection. The proposed algorithm detects the line-to-line fault of transformer using the comparison between the positive and the negative current, when the ground differential relay dose not operate. The performance of the algorithm is verified using a PSCAD/EMTDC simulator under various case studies.

  • PDF

COMS SYSTEM LEVEL RF COMPATIBILITY TEST SYNTHESIS

  • Lim, Hyun-Su;Park, Durk-Jong;Yang, Hyung-Mo;Ahn, Sang-Il
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2007년도 Proceedings of ISRS 2007
    • /
    • pp.500-503
    • /
    • 2007
  • During the COMS system level test, the RF compatibility will be performed in order to verify that there is no issue in RF interface between satellite and COMS ground station, namely SOC (Satellite Operation Center) before the launch. As used for KOMPSAT1, the RF coaxial cable was chosen to be used to connect satellite and SOC with various advantages as compared with ground antennas. As the preparation step, RF cable and required multiplexer were tested in advance. This paper suggests the way for the RF compatibility tests between the satellite and the SOC over RF cable interface and presents the estimated level diagram as the signal power analysis result.

  • PDF

케이블 TV 전송선로의 특성 개선을 위한 접지방식 (Grounding method for Improving of the Characteristics on Cable TV Transmission Line)

  • 황종선;김영민;연제진
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2002년도 제4회 영호남학술대회 논문집
    • /
    • pp.37-40
    • /
    • 2002
  • Ground connection began by experimenting lightning with the use of a kite and it means electric appliances, communication equipments, measuring instruments and so on connecting the Earth in order to flow away overcharged electricity. There are two kinds of earth connection: Power Ground and Signal Ground. Power Ground is for preventing an electric shock and in general there's no current in the connector. However in an accident, there's a quick flow of electricity out to the Earth. Signal Ground is not only for the safety of appliances but also for the safety of equipment operation. This paper is about connection for noise and interference reduce in order to prevent wrong operation and distortion of signal in the electrical appliances which can take place in cable TV.

  • PDF

Design-oriented acceleration response spectrum for ground vibrations caused by collapse of large-scale cooling towers in NPPs

  • Lin, Feng;Jiang, Wenming
    • Nuclear Engineering and Technology
    • /
    • 제50권8호
    • /
    • pp.1402-1411
    • /
    • 2018
  • Nuclear-related facilities can be detrimentally affected by ground vibrations due to the collapse of adjacent cooling towers in nuclear power plants. To reduce this hazard risk, a design-oriented acceleration response spectrum (ARS) was proposed to predict the dynamic responses of nuclear-related facilities subjected to ground vibrations. For this purpose, 20 computational cases were performed based on cooling tower-soil numerical models developed in previous studies. This resulted in about 2664 ground vibration records to build a basic database and five complementary databases with consideration of primary factors that influence ground vibrations. Afterwards, these databases were applied to generate the design-oriented ARS using a response spectrum analysis approach. The proposed design-oriented ARS covers a wide range of natural periods up to 6 s and consists of an ascending portion, a plateau, and two connected descending portions. Spectral parameters were formulated based on statistical analysis. The spectrum was verified by comparing the representative acceleration magnitudes obtained from the design-oriented ARS with those from computational cases using cooling tower-soil numerical models with reasonable consistency.

태양광발전 계통연계 실증시험장 구축에 관한 연구 (The study on construction of the practical testing ground of grid-connected photovoltaic system)

  • 김의환;장주연
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.65.2-65.2
    • /
    • 2010
  • Currently the variety of governmental business support and research for supplying solar energy have been actively progressed. As of now, however, There are no practical testing infrastructures of grid-connected photovoltaic system which test performance of solar power facility in domestic. Therefore, in KEPRI, there is in progress construction of practical testing ground of 500 kW class grid-connected PV System for developing the evaluation of the performance technology including the Module, PCS, and etc, that is the important instrument of the PV System, in Gochang area. It analyzed the site creation work for constructing the practical testing ground and new construction of control room and the unit standards, specifications and capacity of required equipment. For the system detailed design, configuration, instrument-specific parameters established, power generation predictions of Array Type and the components of testing ground are needed to build.

  • PDF

직류 접지극의 전식보호 방법 연구 (Research on Protection Method for Ground Electrode of DC Systems from Corrosion)

  • 정우용;김효성
    • 전력전자학회논문지
    • /
    • 제26권2호
    • /
    • pp.90-95
    • /
    • 2021
  • In contrast to AC grounding systems, the ground electrode in DC systems continuously maintains positive or negative polarity. Ground electrodes with (+) polarity proceeds by oxidation reaction. Thus, the DC current should flow opposite to the polarity of the leakage current flowing through the (+) ground electrode by using a compensation electrode, and the current flowing through the (+) ground electrode can be 0A. However, according to protecting the (+) ground electrode, the compensation electrode corrodes and gets damaged. Thus, the (+) ground electrode must be protected from corrosion, and the service life of the compensation electrode must be extended. As an alternative, the average value of the current flowing through the compensation electrode should be equal with the value of the leakage current flowing through the (+) ground electrode by using the square waveform. Throughout the experiment, the degree of corrosion on the compensation electrode is analyzed by the frequency of the compensation electrode for a certain time. In the experiment, the frequencies of the square waveform are considered for 0.1, 1, 10, 20, 50, 100 Hz, and 1 kHz. Through experiments and analysis, the optimal frequency for reducing the electrolytic damage of the (+) electrode and compensation electrode in an LVDC grounding environment is determined.

해남-전주 HVDC 계통의 정상상태 및 지락 고장시 제어특성 (The Control Characteristics of Haenam-Cheju HVDC system at Ground Fault and Steady State)

  • 곽주식;우정욱;심응보
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1331-1333
    • /
    • 1999
  • In Haenam-Cheju HVDC link several modes of operations and controls are provided, which are constant frequency control, constant power control and constant current control. This paper describes basic control action of converters under three control modes and shows EMTDC simulation results at ground fault and steady state respectively.

  • PDF

OPGW활선 공사시 건조대 아크 예측 (Prediction to Dry-Band Arcing in Live Line Installation)

  • 김정년;김성욱;백주흠;전승익
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.433-435
    • /
    • 2004
  • 본 논문에서는 기존의 가공지선(GW, Ground Wire)을 OPGW(Optical Ground Wire)로 교체공사를 할 경우 나타나는 절연로프에서의 건조대 아크현상을 수치적인 모델링를 통하여 해석할 수 있는 프로그램을 제작하고 현장조건을 입력하여 문제점을 판단하고 해결할 수 있는 방안을 제시하고자 한다.

  • PDF