Journal of the Korean Society of Environmental Restoration Technology
/
v.16
no.2
/
pp.1-12
/
2013
This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.
Korean Journal of Construction Engineering and Management
/
v.14
no.6
/
pp.78-89
/
2013
Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.
Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
Journal of the Korean Society of Environmental Restoration Technology
/
v.21
no.4
/
pp.75-86
/
2018
This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.
Ever since ancient times, earthquakes have been a major threat to the civil infrastructures and the safety of human beings. The majority of casualties in earthquake disasters are caused by the damaged civil infrastructures but not by the earthquake itself. Therefore, the efficient and accurate post-earthquake assessment of the conditions of structural damage has been an urgent need for human society. Traditional ways for post-earthquake structural assessment rely heavily on field investigation by experienced experts, yet, it is inevitably subjective and inefficient. Structural response data are also applied to assess the damage; however, it requires mounted sensor networks in advance and it is not intuitional. As many types of damaged states of structures are visible, computer vision-based post-earthquake structural assessment has attracted great attention among the engineers and scholars. With the development of image acquisition sensors, computing resources and deep learning algorithms, deep learning-based post-earthquake structural assessment has gradually shown potential in dealing with image acquisition and processing tasks. This paper comprehensively reviews the state-of-the-art studies of deep learning-based post-earthquake structural assessment in recent years. The conventional way of image processing and machine learning-based structural assessment are presented briefly. The workflow of the methodology for computer vision and deep learning-based post-earthquake structural assessment was introduced. Then, applications of assessment for multiple civil infrastructures are presented in detail. Finally, the challenges of current studies are summarized for reference in future works to improve the efficiency, robustness and accuracy in this field.
In this paper we present the first results of summer-time F region irregularities during low solar condition observed using the Gadanki MST radar. Echoes were observed on all 20 nights of radar observations and were mostly confined to the post-midnight hours. Echo morphology is very different from the equinoxial post-sunset plume-like features reported earlier from Gadanki. Echo SNRs are lower by 25 dB than their equinoxial post-sunset counterpart, and are quite comparable to the equinoxial irregularities in the post-midnight hours, which are essentially the decaying post-sunset irregularities. The Doppler velocities, which lie in the range of $\pm$ 100 m s-1, show upward/northward motion of the irregularities during the initial phase in contrast to the observed predominant downward/southward velocities associated with the decaying equinoxial post-midnight F region irregularities. Spectral widths of the summer echoes, which are well below 50 m s-1 and are very similar to those of the decaying equinoxial irregularities, represent the presence of weak plasma turbulence. Simultaneous observations made using a collocated ionosonde show no ionogram trace during 2200-0530 LT except for a few occasions. Weak frequency type spread F observed during midnight hours occurred without prior occurrence of range spread F. Concurrent ionosonde observations made from magnetic equatorial location Trivandrum also show very similar result and thus no height rise of the F layer during the midnight hours could be monitored. The preliminary analysis suggests that the post-midnight irregularities reported here are mostly freshly generated ones. The observations are discussed in the light of other observational results reported earlier and the current under standing on the post-midnight occurrence F region irregularities in summer.
Journal of The Korean Association For Science Education
/
v.12
no.3
/
pp.61-76
/
1992
The purpose of this study was to develop the instructional model and teaching material to change the middle school students'conceptions of electric current into the scientific ones and to investigate the effects of the model in actual classrooms. We identified the students' ideas and their misunderstanding about the concept of eIectic current through reviewing the literatures and our in this study. Based on the above results, we developed the instructional model and designed the teaching sequence and prepare the learning materials about the unit of the electric current in middle school Our instructional model was based on 'learning cycle' developed by Lawson, but the new stage called "exploration through qualitative questions" to elicit the students' own conceptions was inserted to it. To investigate the effects or the new teaching model, the pre- and post-test using the POE type were administered to experimental group(52 students) taught with learning cycles and control group(52 students) taught with traditional styles. The results are as follows; 1) The rates of correct. predictions was varying according to the kinds of problems. And the rates of the correct. reasons of their predictions were lower than those of the predictions. 2) The mean scores of the post-test of both groups were significantly higher than those of the pre-test. We could not find statistically significant difference in theme an score between experimental group and control group after implementation of the model. But the experimental group gained higher scores than those of the control group on two problem. Therefore, although we cannot show the prominent effects of our teaching model based on learning cycles, there are some effects of our model on changing the middle school students' conceptions of electric current.
Transactions of the Korean Society of Mechanical Engineers
/
v.16
no.1
/
pp.156-161
/
1992
In this research a monitoring system for turning using NC information and the current of feed motor as a monitoring signal was developed. The overall system consists of modules such as learning process, NC data transmission, generation of forecast information, signal acquisition, monitoring and post process. In the learning process, the reference data and the cutting force equation necessary for monitoring are obtained from the accumulated monitoring results. In the generation of forecast information, the information of forecasted cutting forces is acquired from the cutting force equation and NC program and appended to each NC block as a monitor code. Reliability of monitoring is improved by using the monitor code in the real-time monitoring. Monitoring module is divided into two parts : the off-line monitoring where errors of NC program are checked and the on-line monitoring where the level of motor current is monitored during cutting operations. If the actual current level exceeds the limit value provided by the monitor code in the level monitoring, it is recognized as abnormal. In the event of abnormal status, the post processor sends the emergency stop signal to NC controller to stop the operation. Actual experiments have shown that the developed monitoring system works well.
Park, So-Youn;Kim, Hyung-Min;Lee, Daniel-Juhun;Kim, Seong-Kweon
The Journal of the Korea institute of electronic communication sciences
/
v.14
no.6
/
pp.1145-1152
/
2019
In this paper, a low power current mode 12-bit ADC(: Analog to Digital Converter) is proposed to mix digital circuits and analog circuits with the advantages of low power consumption and high speed operation. The proposed 12 bit ADC is implemented by using 4-bit ADC in a cascade structure, so its power consumption can be reduced, and the chip area can be reduced by using a conversion current mirror circuit. The proposed 12-bit ADC is SK Hynix 350nm process, and post-layout simulation is performed using Cadence MMSIM. It operates at a supply voltage of 3.3V and the area of the proposed circuit is 318㎛ x 514㎛. In addition, the ADC shows the possibility of operating with low power consumption of 3.4mW average power consumption in this paper.
This paper deals with how Korea Post establishes a nation wide network of the parcel warehouse & distribution centers(PWDC). The state-of-the-art of the parcel service business in Japan and U.S. are introduced for benchmarking purpose. Potential customers of the PWDC and their major goods are identified. Current major customers of the Korea Post were interviewed to figure out the potential demand of the PWDC service. Five-year volume estimation of the Korea Parcel Service(KPS) is presented based on the past 30-month B-C volume of the four major door-to-door delivery service companies in Korea. Yearly construction plan of the PWDCs is proposed; and the networking strategy of PWDC is discussed.
In this paper, we study about the stator winding magnetization method and the magnetizing fixture magnetization method in post-assembly magnetization. Most of small electrical machine use the stator winding magnetization method but it is impossible to magnetize the permanent magnet by the stator winding magnetization method when the capacity of machine increases and the coercive force of magnet increases. And the eddy current disturbs the magnetization seriously in case of LSPM(Line Start Permanent magnet Motor) that have conductor bar in rotor. Hence, the magnetization fixture is required. So, in this paper we study about the post-assembly magnetization method that can use the stator winding magnetization method or must use the magnetization fixture magnetization method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.