• 제목/요약/키워드: Pollution loads

검색결과 381건 처리시간 0.022초

Enhancement of Estimation Method on the Land T-P Pollutant Load in TMDLs Using L-THIA (L-THIA모형을 이용한 수질오염총량관리제 토지계 T-P 발생부하량 산정방식의 개선)

  • Ryu, Jichul;Kim, Eunjung;Han, Mideok;Kim, Young Seok;Kum, Donghyuk;Lim, Kyoung Jae;Park, Bae Kyung
    • Journal of Korean Society of Environmental Engineers
    • /
    • 제36권3호
    • /
    • pp.162-171
    • /
    • 2014
  • In this study, the uncertainty analysis of present land pollutant load estimation with simplified land category in TMDLs was performed and the enhanced method for land pollutant load estimation with level II land cover consisting of 23 categories was suggested, which was verified by L-THIA model. For land TP load estimation in Jinwi stream basin, the result of comparison between existing method with simplified land category (Scenario 1) and enhanced method with level II land cover (Scenario 2) showed high uncertainty in existing method. TP loads estimated by Scenario 2 for land covers included in the site land category were in the range of 3.45 to 56.69 kg/day, in which TP loads differed by sixteen times as much among them. For application of scenario 2 to TMDLs, Land TP loads were estimated by matching level II land cover to 28 land categories in serial cadastral map (Scenario 3). In order to verify accuracy of TP load estimation by scenario 3, the simulation result of L-THIA was compared with that and the difference between the two was as little as 10%. The result of this study is expected to be used as primary data for accurate estimation of land pollutant load in TMDLs.

A Rough Estimation of Environmental Capacity in the Yellow Sea using a Numerical Hydrodynamic Model (해수운동모델을 이용한 황해 환경용량의 개략 산정)

  • Kim Gwang Su;Kim Dong Myung;Park Chung Kil
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • 제2권1호
    • /
    • pp.63-73
    • /
    • 1999
  • The results of residual currents simulation by a three-dimensional hydrodynamic model showed the water volume transport and the residence time to be about 4km³ per tidal cycle and about 6 years through the line of latitude, 34° 25' N in the Yellow Sea, and to be about 13km³ per tidal cycle and about 2.5 years through the southeastern boundary line of the Yellow Sea, respectively. On the bases of the entire seawater volume of the Yellow Sea and dissolved oxygen (DO) in summer, the environmental capacity of the Yellow Sea for reception of the maximum pollution load without reducing DO concentration below 5.0mg/ℓ in seawater may be estimated to be about 58×10/sup 6/tons of chemical oxygen demand (COD), which is equivalent to the load about 8 times as high as the annual organic pollution load from 14 major rivers. On the bases of DO transports by residual currents calculated on the line of 34° 25' N latitude and on the southeastern boundary line of the Yellow Sea being about 57×10³tons and about 203×10³tons of DO per day, respectively, the environmental capacities of the Yellow Sea for reception of the maximum pollution loads without reducing DO concentration in seawater nay be equivalent to COD loads about 3 times and 10 times, respectively, as high as the existing organic pollution loads from 14 major rivers.

  • PDF

Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds (부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Cheong, Eunjeong;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • 제32권4호
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • 제25권4호
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Water Quality Simulation of Juam Reservoir Depend on Total Pollution Loads Control (총량규제에 따른 주암호의 장래 수질 예측)

  • Jang, Sung-Ryong;An, Ki-Sun;Kwon, Young-Ho;Han, Jae-Ik
    • Journal of Environmental Science International
    • /
    • 제19권1호
    • /
    • pp.39-45
    • /
    • 2010
  • When the Juam multipurpose dam which is connected with existing large water supply facilities is finished, water environment is changed from stream to lake. The changed quality of water should be examined. In this study, the result of water quality forecasting is analysed and an effective management plan of water quality is presented. Tn this study, the WASPS model that is a dynamic water quality simulation model was selected to forecast the water quality. This model forecasts movement of change of pollutants. For an application of the model, the subject areas were divided into seventeen sub-areas by considering change temperature depending measuring points and on depth of water. Meteorological data collected by the meteorological observatory and data about quality measured by the Korea Water Resources Development Corporation were used for an operation of the model. As a result of quality examination through quality data and estimated pollutant loading, the water quality environment criterion was grade II and the nutritive condition was measured as meso-graphic grade. In this study, an effective management was planned to improve water quality by reducing pollution load. According to the result of examination, when more than 30% of BOD was reduced it was recorded that the environment standard of water quality was improved to the second grade.

Development of Desktop-Based LDC Evaluation System for Effectiveness TMDLs (효과적인 오염총량관리를 위한 데스크탑 기반의 LDC 평가 시스템 개발)

  • Ryu, Jichul;Hwang, Ha-Sun;Lee, Sung-Jun;Kim, Eun Kyoung;Kim, Yong Seok;Kum, Donghyuk;Lim, Kyoung Jae;Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • 제58권4호
    • /
    • pp.67-74
    • /
    • 2016
  • Load Duration Curve (LDC) can be used as a method for load management of point and non-point pollution source because the LDC easily assesses the water quality corresponding to hydrological changes in a watershed. Recently, the application of LDC to total pollution load management is a growing interest in Korea. In this regard, A desktop-based LDC assessment system was developed in this study to provide convenience to users in water quality evaluation. The developed system can simply produce the LDC by using streamflow and water quality data involved in its database. Also, The system can quantitatively inform the success or failure of the achievement for a target water quality at monthly scale. Furthermore, seasonal water quality and point/non-point pollution load in a watershed can be estimated by this system. We expect that the developed system will contribute to establish local and national policies regarding water management and total pollution load management because of its advantages such as the pollution tracking investigation and the analysis of water quality and pollution loading amount in an ungauged watershed.

A Study on Selection Method of Management Watershed for Total Pollution Load Control at Tributary (지류총량관리를 위한 관리유역 선정 방법에 관한 연구)

  • Hwang, Ha Sun;Lee, Sung Jun;Ryu, Jichul;Park, Ji Hyung;Kim, Yong Seok;Ahn, Ki Hong
    • Journal of Korean Society on Water Environment
    • /
    • 제32권6호
    • /
    • pp.528-536
    • /
    • 2016
  • The purpose of Total Pollution Load Control at Tributary is to obtain maximum improvement effect of water quality through finding the most impaired section of water-body and establishing the proper control measure of pollutant load. This study was implemented to determine the optimal management of reach, period, condition, watershed, and pollution source and propose appropriate reduction practices using the Load duration curve (LDC) and field monitoring data. With the data of measurement, LDC analysis shows that the most impaired condition is reach V (G4~G5), E group (flow exceedance percentile 90~100%) and winter season. For this reason, winter season and low flow condition should be preferentially considered to restore water quality. The result of pollution analysis for the priority reach and period shows that agricultural nonpoint source loads from onion and garlic culture are most polluting. Therefore, it is concluded that agricultural reuse of surface effluent (storm-water runoff with non-point sources) and low impact farming that includes reducing fertilization and controlling the height of drainage outlet are efficient water quality management for this study watershed.

Watershed Modeling Research for Receiving Water Quality Management in Hwaseong Reservoir Watershed (화성호 유역의 수질관리를 위한 유역모델링 연구)

  • Jang, Jae-Ho;Kang, Hyeong-Sik;Jung, Kwang-Wook
    • Journal of Korean Society on Water Environment
    • /
    • 제28권6호
    • /
    • pp.819-832
    • /
    • 2012
  • HSPF model based on BASINS was applied for the Hwaseong Reservoir watershed (HRW) to evaluate the feasibility of water quality management. The watershed was divided into 45 sub-basins considering various watershed environment. Streamflow was calibrated based on the measured meteorological data, discharge data of treatment plants and observed streamflow data for 2010 year. Then the model was calibrated against the field measurements of water qualities, including BOD, T-N and T-P. In most cases, there were reasonable agreements between observed and predicted data. The validated model was used to analyze the characterization of pollutant load from study area. As a result, Non-point source pollutant loads during the rainy season was about 66~78% of total loads. In rainy-season, water quality parameters depended on precipitation and pollutant loads patterns, but their concentration were not necessarily high during the rainy season, and showed a decreasing trend with increasing water flow. As another result of evaluation for load duration curves, in order to improve water qualities to the satisfactory level, the watershed managements considering both time-variant and pollution sources must be required in the HRW. Overall, it was found that the model could be used conveniently to assess watershed characteristics and pollutant loads in watershed scale.

Pollutant Load Characteristics by Baseflow in a Small Agricultural Watershed (농업소하천 유역의 기저유출에 의한 오염부하특성)

  • Shin, Yongchul;Lyou, Changwon;Choi, Ye Hwan;Lim, Kyuong Jae;Choi, Joongdae
    • Journal of Korean Society on Water Environment
    • /
    • 제22권2호
    • /
    • pp.244-249
    • /
    • 2006
  • Natural environment of Weolgokri watershed has been well preserved as a traditional agricultural watershed. A year record of streamflow, $NO_3-N$, T-N and T-P concentrations data (April 2004 - Mar. 2005) were examined to estimate annual and seasonal patterns of pollutant loads in streamflow and baseflow from the agricultural watershed. To estimate pollutant loads from baseflow, baseflow component was separated from streamflow using the digital filter method in the Web-based Hydrograph Analysis Tool system and loads of $NO_3-N$, T-N and T-P from streamflow and baseflow were evaluated. The $NO_3-N$, T-N, and T-P loads from streamflow were 13.85 kg/ha, 45.92 kg/ha and 1.887 kg/ha, respectively, while corresponding loads from baseflow were 7.43 kg/ha, 24.70 kg/ha, 0.582 kg/ha, respectively. It was found that $NO_3-N$ and T-N loads were contributed slightly more by the baseflow (53% and 53% of Total-loads) than by the direct runoff (47% and 47% of Total loads). However, only 30% of total T-P load was contributed by the baseflow. It is recommended that one needs to assess pollutant load contribution by the baseflow to identify appropriate pollution control strategies for an effective watershed management.

Estimation of Pollutants Loads using Unit Load Method in Hong-Bo Watershed (원단위법을 이용한 홍보유역의 오염부하량 산정)

  • Kim, Sun-Joo;Lee, Suk-Ho;Heo, Bae-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 한국농공학회 2001년도 학술발표회 발표논문집
    • /
    • pp.492-496
    • /
    • 2001
  • The purpose of this study is to estimation of pollutants loads using unit load method in Hong-bo watershed. In general, because river water quality management have been conducted with point source pollutant in our country, pollutants caused by precipitation have not been managed well so far. Especially the pollutants tends to concentrate in the reservoir of reclaimed land. Therefore, the reservoir of reclaimed land is need to continuous monitoring and update of an accurate data. also, It is need to improvement of environmental pollution. There are divide into nine sub-catchments and made an estimate of pollutants loads using unit load method in Hong-bo basin. The sample of data was during the 10 years.

  • PDF