• Title/Summary/Keyword: Pollutant delivery ratio

Search Result 25, Processing Time 0.019 seconds

Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds (낙동강 오염총량관리 단위유역 유달율 경험공식)

  • Kim, Mun Sung;Shin, Hyun Suk;Park, Ju Hyun;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

Pollutant Delivery Ratio of Okdong-cheon Watershed Using HSPF Model (HSPF 모형을 이용한 옥동천 유역의 유달율 분석)

  • Lee, Hyunji;Kim, Kyeung;Song, Jung-Hun;Lee, Do Gil;Rhee, Han-pil;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.1
    • /
    • pp.9-20
    • /
    • 2019
  • The primary objective of this study was to analyze the delivery ratio using Hydrological Simulation Program - Fortran (HSPF) in Okdong-cheon watershed. Model parameters related to hydrology and water quality were calibrated and validated by comparing model predictions with the 8-day interval filed data collected for ten years from the Korea Ministry of Environment. The results indicated that hydrology and water quality parameters appeared to be reasonably comparable to the field data. The pollutant delivery loads of the watershed in 2015 were simulated using the HSPF model. The delivery ratios of each subwatershed were also estimated by the simple ratio calculation of pollutant discharge load and pollutant delivery load. Coefficients of the regression equation between the delivery ratio and specific discharge were also computed using the delivery ratio. Based on the results, multiple regression analysis was performed using the discharge and the physical characteristics of the subwatershed such as the area. The equation of delivery ratio derived in this study is only for the Okdong-cheon watershed, so the larger studies are needed to apply the findings to other watersheds.

Pollutant Load Delivery Ratio for Flow Duration at the Chooryeong-cheon Watershed (추령천 유역의 유황별 유달율 계산)

  • Kim, Young-Joo;Yoon, Kwang-Sik;Son, Jae-Gwon;Choi, Jin-Kyu;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.19-26
    • /
    • 2010
  • To provide the basic information for the water quality management of the Sumjin River Basin, delivery ratios for flow duration were studied. Using the day-interval data set of discharge and water quality observed from the Chooryeong-cheon watershed, the flow-duration and discharge-load relation curves for the watershed were established, then the load-duration curve was constructed. Delivery ratios for flow duration were also developed. Delivery ratios showed wide variation according to flow conditions. In general, delivery ratio of high flow condition showed higher value reflecting nonpoint source pollution contribution from the forest dominating watershed. To resolve this problem, a regression model explaining the relation between flow rate and delivery ratio was suggested. The delivery ratios for different flow regime could be used for pollutant load estimation and TMDL (Total maximum daily load) development.

Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed (회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정)

  • Jung, Jae-Woon;Yoon, Kwang-Sik;Joo, Seuk-Hun;Choi, Woo-Young;Lee, Yong-Woon;Rhew, Doug-Hee;Lee, Su-Woong;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

Investigation on the Pollutant Delivery Characteristics using Physically Based Watershed Model (물리적 기반의 유역모형을 이용한 오염물질 유달 특성 규명)

  • Kim, Chul-Gyum;Kim, Nam-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.256-267
    • /
    • 2009
  • A method of estimating pollutant delivery ratios considering watershed physical and meteorological characteristics and flow conditions using SWAT-K watershed model was described, and pollutant delivery characteristics during dry and rainy seasons, for monthly and seasonally, and with flow regimes were investigated for the Chungju dam watershed. Delivery ratios for sediment, T-N, and T-P showed higher values over 100% during dry and winter seasons with low pollutant loads and flows, and showed relatively uniform ones under 100% during rainy and summer seasons with concentrated loads and flows. It was found that mainly wet flows during summer seasons played very important roles in investigating the delivery characteristics of total or nonpoint pollutant loads, because more than 90% of total loads were influenced by nonpoint source, and discharged with the flows. From the results, we could find out the delivery characteristics with various watershed and flow conditions which are difficult to consider by actual measurement, and could get a foothold of estimating more reasonable and scientific allocated loads for water quality standard using the reliable method of estimating delivery ratios with a watershed model.

Evaluation of Flow-Pollutant Load Delivery Ratio Equations on Main Subwatersheds within Juam Lake (농촌유역 유량-유달율 단순회귀식을 이용한 주암호 상류유역의 유달율 추정가능성 평가)

  • Jung, Jae-Woon;Lim, Byung-Jin;Choi, Dong-Ho;Choi, Yu-Jin;Lee, Kyoung-Sook;Kim, Young-Joo;Kim, Kap-Soon;Chang, Nam-Ik;Yoon, Kwang-Sik
    • Journal of Environmental Science International
    • /
    • v.21 no.10
    • /
    • pp.1235-1244
    • /
    • 2012
  • The objective of this study is to evaluate Flow-Pollutant load delivery ratio equations developed from rural watershed on main subwatersheds within Juam Lake. Two regression equations for BOD and three equations for T-P were evaluated on Bosung cheon, Dongbok cheon, Songgwang cheon, Naenam cheon, and Sinpyeon cheon. The results show that estimation of BOD delivery ratio using flow-delivery equation is reliable when relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed. On the other hand, application of regression equation for T-P was feasible when the landuse pattern and relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed.

Estimation of Pollutant Load Delivery Ratio for Flow Duration Using L-Q Equation from the Oenam-cheon watershed in Juam Lake (유량-부하량관계식을 이용한 주암호 외남천 유역의 유황별 유달율 산정)

  • Choi, Dong-Ho;Jung, Jae-Woon;Lee, Kyoung-Sook;Choi, Yu-Jin;Yoon, Kwang-Sik;Cho, So-Hyun;Park, Ha-Na;Lim, Byung-Jin;Chang, Nam-Ik
    • Journal of Environmental Science International
    • /
    • v.21 no.1
    • /
    • pp.31-39
    • /
    • 2012
  • The objective of this study is to provide pollutant loads delivery ratio for flow duration in Oenam-cheon watershed, which is upstream watershed of Juam Lake. To calculate the delivery ratio by flow duration, rating curves and discharge-loads curves using measured data were established, then Flow Duration Curve(FDC) and pollutant loads delivery ratio curves were constructed. The results show that the delivery ratios for $BOD_5$ for abundant flow($Q_{95}$), ordinary flow($Q_{185}$), low flow($Q_{275}$), and drought flow($Q_{355}$) were 23.9, 12.7, 7.1, and 2.9%, respectively. The delivery ratios of same flow regime for T-N were 58.4, 31.2, 17.2 and 7.1%, respectively. While, the delivery ratios T-P were 17.3, 7.5, 3.4, and 1.1% respectively. In general, delivery ratio of high flow condition showed higher value due to the influence of nonpoint source pollution. Based on the study results, generalized equations were developed for delivery ratio and discharge per unit area, which could be used for ungaged watershed with similar pollution sources.

Determination of Focused Control Pollutant Source by Analysis of Pollutant Delivery Characteristics in Unit Watershed Upper Paldang Lake (팔당호 상류의 단위유역별 오염물질 유출특성 분석을 통한 중점관리 오염원 선정)

  • Kim, Dong Woo;Jang, Mi Jeong;Han, Ihn Sup
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.5
    • /
    • pp.367-377
    • /
    • 2014
  • Paldang lake which is the most important water resource in Korea is classified as a stream type reservoir and water quality of Paldang lake can be significantly influenced by external pollutant source. So this study was aimed to determine focused control BOD and TP sources of each unit watershed upper Paldang lake through analysis of pollutant source distribution and pollutant runoff characteristics. Generated load, discharge load, delivery load and each load density of 11 unit watersheds upper Paldang lake were calculated using data of water quality and flow rate from pollutant sources and 74 small streams. As a result of generated load, discharge load and delivery load of BOD and TP from pollutant sources, the most BOD generated load was taken by livestock with 66% of total BOD discharge load and domestic had the most BOD discharge load, 42.7%. The ratio of delivery load of livestock and domestic was 36.4% and 34.3%, respectively. Livestock occupied high ratio of TP generated load, discharge load and delivery load with 82.5%, 44.4% and 46.7%, respectively. Gyeongan watershed which had high population density showed the highest BOD delivery load density of $14.6kg/km^2/d$ and the highest TP delivery load density with $1.23kg/km^2/d$ was analyzed in Cheongmi watershed including the biggest number of livestock. From these results, management of domestic sewer and livestock excrement was determined as a focused control pollutant source. And intensive management about domestic sewer in Gyeongan stream and livestock excrement in Cheongmi stream is required for water quality improvement of Paldang lake.

A Study on Estimated Pollutant Delivery Load for the Basic Plan of TPLC (수질오염총량관리계획 수립을 위한 유달부하량 추정방법 연구)

  • Hwang, Ha Sun;Rhee, Han Pil;Ahn, Ki Hong;Park, Ji Hyung;Kim, Yong Seok;Lee, Sung Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.375-383
    • /
    • 2016
  • Total Pollution Load Control (TPLC) calculates and manages the allowable pollutant load that is discharged from the watershed, which can meet the water quality target. Delivery Ratio (DR) is generally used for predicting the variation of pollutant mass balance between the pollutants discharged from the watershed and a certain point in the stream, and it is very important for estimation of accurate allowable pollutant load. The concept of DR in TPLC is different from prevalent DR, because DR in TPLC includes both the discharge of pollutants from the watershed and the delivery mechanism. Therefore, DR in TPLC should be estimated by using a proper and unified methodology. The appropriate method and equation for estimation of DR in TPLC was developed through the review of various methodologies, and the applicability of the equation was evaluated in a study area (Geumho A). Determination coefficients (R2) of regression were shown to be relatively high (BOD 0.71~0.87, T-N 0.86~0.90, T-P 0.62~0.69). Applicability of the developed methodology and equations was evaluated as appropriate for TPLC, and it is suggested.

A Study on Verification of Delivery Ratio Methodology for Basic Plan at TPLMs(Total Pollutant Load Management System) (수질오염총량관리계획 수립을 위한 유달율 적용방안 검증 연구)

  • Lee, Sung Jun;Rhee, Han Pil;Park, Ji Hyung;Kim, Yong Seok;Hwang, Ha Sun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.714-722
    • /
    • 2017
  • The TPLMs is a system to manage the total amount of pollutants discharged from the watershed in order to achieve the target water quality of the river. In this process, the pollutant load can be classified into generation, discharge and delivery load. When using equation 2, the discharge coefficient should be 1. In case of using equation 3, it is considered that the discharge coefficient defined in the Technical Guideline should be applied. The delivery load is calculated as the product of the discharge load and the delivery ratio, and the delivery ratio is defined as the rate at which the pollutant discharged from the watershed reaches a specific point in the stream. In this study, the delivery ratio estimation method proposed by Hwang (2016) was applied to the Yonggang watershed in the Nakdong river. And the input data of QUALKO2 model was generated by using the estimated delivery ratio (equation 3) and the validation study was conducted by comparing with DRave (equation 2). As a result of the study, it is possible to use both the equation 2 and the equation 3, but it is necessary to change the methodology according to the application of the discharge coefficient.