• Title/Summary/Keyword: Plant location

Search Result 587, Processing Time 0.032 seconds

A Case Study for Analyzing the Optimal Location for A Solar Power Plant via AHP Analysis with Fine Dust and Weather Information (미세먼지와 기상정보 기반의 AHP 분석을 통하여 태양광 발전소 최적입지선정에 대한 사례연구)

  • Lee, Geon-ju;Lee, Gi-Hyun;Kang, Sung-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.157-167
    • /
    • 2017
  • Solar energy has been known as a successful alternative energy source, however it requires a large area to build power generation facilities compared to other energy sources such as nuclear power. Weather factors such as rainy weather or night time impact on solar power generation because of lack of insolation and sunshine. In addition, solar power generation is vulnerable to external elements such as changes in temperature and fine dust. There are four seasons in the Republic of Korea hereby variations of temperature, insolation and sunshine are broad. Currently factors that cause find dust are continuously flowing in to Korea from abroad. In order to build a solar power plant, a large area is required for a limited domestic land hereby selecting the optimal location for the plant that maximizes the efficiency of power generation is necessary. Therefore, this research analyze the optimal site for solar power generation plant by implementing analytic hierarchy process based on weather factors such as fine dust. In order to extract weather factors that impact on solar power generation, this work conducts a case study which includes a correlation analysis between weather information and power generation.

Development of Web-based Power Plant Simulator System (원격 훈련용 발전 시뮬레이터 개발)

  • Byun, Seung-Hyun;Kang, Hae-su;Woo, Joo-Hee;Lee, Jee-Hoon;Kim, Duck-Ho
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.277-283
    • /
    • 2021
  • Power plant simulators have been used for operator training, control verification and engineering verification. In general, simulators can be used in the place where they are installed by only single user group at a time. Considering high cost of simulator development, a lot of available scenarios, the diversity of user level and accessibility based on users' work location, development of simulator system that can be used by multiple user groups regardless of location is required in order to enhance utilization of simulators. In this paper, the simulator system that can be used by multiple user group simultaneously without location limitation is proposed. The simulator system is composed of simulator servers, database servers, HMI servers, a web server, web clients. Simulator server consists of control model, process model that are developed for Circulating Fluidized Bed power plant located overseas. A web server manages user accounts, operation procedures, multiple server access between web client group and simulator server group. In other words, a web server makes a user group select a simulator server at a time. The developed simulator system is integrated after implementing process model, control model, HMI, and web server. Web client systems are installed on local site where power plant is located, while simulator servers, HMI servers, database servers, and a web server are located in KEPCO RI. The developed simulator system is verified by steady-state test, malfunction test and so on via remote access.

Floating Photovoltaic Plant Location Analysis using GIS (GIS를 활용한 수상 태양광 발전소 입지 분석)

  • Lee, Ki Rim;Lee, Won Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.1
    • /
    • pp.51-59
    • /
    • 2016
  • Global consumption of fossil fuels continues to increase. As developing countries use fossil fuel as much as the existing fossil fuel using countries, the total amount of fossil fuel consumed has risen. The finite fossil energy depletion insecurity have become serious. In addition, fossil energy is caused by environmental pollution, economic and social problems remain in assignments that need to be addressed. Although solar power is clean and has many benefits, there are several problems in the process of installing a solar power plant. To solve these problems, floating photovoltaic plants has emerged as an alternative. This floating photovoltaic plants location analysis has not been made yet. In this study, the conditions of the floating photovoltaic plants location is analyzed with the Analytic Hierarchy Process using the terrain and climate factors. The score is assigned to the attribute information of each factor by the classification table. After multiplied by the weight the result is analyzed by visualization of the score. As the result, the score of the northen part of Gyeongsangbuk-do province is higher than the southern part of Gyeongsangbuk-do province. Especially Andongho lake in Andong City and the reservoir in Yeongyang-Gun are extracted as the optimal location. The score of the river boundary is low not the center of the river stream. It is expected that this study would be a more accurate floating solar power plant location analysis.

Localization of solar-hydrogen power plants in the province of Kerman, Iran

  • Mostafaeipour, Ali;Sedaghat, Ahmad;Qolipour, Mojtaba;Rezaei, Mostafa;Arabnia, Hamid R.;Saidi-Mehrabad, Mohammad;Shamshirband, Shahaboddin;Alavi, Omid
    • Advances in Energy Research
    • /
    • v.5 no.2
    • /
    • pp.179-205
    • /
    • 2017
  • This research presents an in-depth analysis of location planning of the solar-hydrogen power plants for electricity production in different cities situated in Kerman province of Iran. Ten cities were analyzed in order to select the most suitable location for the construction of a solar-hydrogen power plant utilizing photovoltaic panels. Data envelopment analysis (DEA) methodology was applied to prioritize cities for installing the solar-hydrogen power plant so that one candidate location was selected for each city. Different criteria including population, distance to main road, flood risk, wind speed, sunshine hours, air temperature, humidity, horizontal solar irradiation, dust, and land costare used for the analysis. From the analysis, it is found that among the candidates' cities, the site of Lalezar is ranked as the first priority for the solar-hydrogen system development. A measure of validity is obtained when results of the DEA method are compared with the results of the technique for ordering preference by similarity to ideal solution (TOPSIS). Applying TOPSIS model, it was found that city of Lalezar ranked first, and Rafsanjan gained last priority for installing the solar-hydrogen power plants. Cities of Baft, Sirjan, Kerman, Shahrbabak, Kahnouj, Shahdad, Bam, and Jiroft ranked second to ninth, respectively. The validity of the DEA model is compared with the results of TOPSIS and it is demonstrated that the two methods produced similar results. The solar-hydrogen power plant is considered for installation in the city of Lalezar. It is demonstrated that installation of the proposed solar-hydrogen system in Lalezar can lead to yearly yield of 129 ton-H2 which covers 4.3% of total annual energy demands of the city.

Comparison of Dose Rates from Four Surveys around the Fukushima Daiichi Nuclear Power Plant for Location Factor Evaluation

  • Sanada, Yukihisa;Ishida, Mutsushi;Yoshimura, Kazuya;Mikami, Satoshi
    • Journal of Radiation Protection and Research
    • /
    • v.46 no.4
    • /
    • pp.184-193
    • /
    • 2021
  • Background: The radionuclides released by the Fukushima Daiichi Nuclear Power Plant (FDNPP) accident 9 years ago are still being monitored by various research teams and the Japanese government. Comparison of different surveys' results could help evaluate the exposure doses and the mechanism of radiocesium behavior in the urban environment in the area. In this study, we clarified the relationship between land use and temporal changes in the ambient dose rates (air dose rates) using big data. Materials and Methods: We set a series of 1 × 1 km2 meshes within the 80 km zone of the FDNPP to compare the different survey results. We then prepared an analysis dataset from all survey meshes to analyze the temporal change in the air dose rate. The selected meshes included data from all survey types (airborne, fixed point, backpack, and carborne) obtained through the all-time survey campaigns. Results and Discussion: The characteristics of each survey's results were then evaluated using this dataset, as they depended on the measurement object. The dataset analysis revealed that, for example, the results of the carborne survey were smaller than those of the other surveys because the field of view of the carborne survey was limited to paved roads. The location factor of different land uses was also evaluated considering the characteristics of the four survey methods. Nine years after the FDNPP accident, the location factor ranged from 0.26 to 0.49, while the half-life of the air dose rate ranged from 1.2 to 1.6. Conclusion: We found that the decreasing trend in the air dose rate of the FDNPP accident was similar to the results obtained after the Chernobyl accident. These parameters will be useful for the prediction of the future exposure dose at the post-accident.

A Simulation Study on Handshake Location in an AS/RS with Twin Cranes for Mixed-model Production in an Automotive Plant (자동차 공장의 혼류생산을 고려한 AS/RS 내 트윈크레인 Handshake 작업영역 위치 결정에 관한 시뮬레이션 연구)

  • Jeongtae Park;Bosung Kim;Taehoon Lee;Seonghwan Lee;Soondo Hong
    • Journal of the Korea Society for Simulation
    • /
    • v.32 no.4
    • /
    • pp.11-18
    • /
    • 2023
  • This study analyzes the effect of a handshake location of an AS/RS with twin cranes for mixed-model production line at an automobile plant. Implementing a handshake operation has the advantage for preventing route interference between twin cranes that operate without crossing into each other's working areas. However the handshake operation requires additional unloading and loading processes to retrieve assembly parts beyond the handshake area. Therefore the decision regarding the handshake location is crucial to improve efficiency of storage and retrieval operations. Simulation results show that the handshake operation with the optimal handshake location reduces the average response time of storage requests to 87% compared to non-handshake operation.

A Numerical Study of the Backdraft Behavior with the Variation of the Ignition Location and Time (점화원 위치 및 점화시간 변화에 따른 백드래프트 거동에 관한 수치적 연구)

  • Ko, Min Wook;Oh, Chang Bo;Han, Yong Shik;Do, Kyu Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.1-8
    • /
    • 2016
  • The behavior of backdraft in the compartment with different ignition locations and times was numerically investigated. The Fire Dynamics Simulator (FDS) v5.5.3 with a model-free simulation option was used in the numerical simulation of backdraft. The ignition source was located near the inside wall, at the compartment center and near the window opening, respectively. The ignition was started at the instance when the fresh air reached the ignition location or when a sufficient time passed compare to the instance of the arriving of the fresh air to the ignition location. As a result, for the ignition source was located near the inside wall, a strong fire ball was observed at once and the result was similar to the previous experimental result. For the ignition source was located at the center of the compartment, a strong fire ball was occurred and two strong fire balls were observed consecutively for the ignition time was delayed. For the ignition source was located near the window opening and longer time was given for the ignition compare the duration of the fresh air arriving to the ignition location, the rapid temperature variation was not observed because there was no flame. However, for the ignition was started at the instance when the fresh air reached the ignition location, the ignition could be initiated and a intensive fire ball was observed. The pressure measured at the upper inside part of the window opening provided a similar trend with the previous experimental result of compartment backdraft.

Insights into the Incidence of Watermelon chlorotic stunt virus Causing Yellowing Disease of Watermelon in Western and Southwestern Regions of Saudi Arabia

  • Ahmad, M.H.;Shakeel, M.T.;Al-Shahwan, I.M.;Al-Saleh, M.A.;Amer, M.A.
    • The Plant Pathology Journal
    • /
    • v.34 no.5
    • /
    • pp.426-434
    • /
    • 2018
  • During the spring season of 2014, a total of 148 melon and watermelon leaf samples were collected from symptomatic and asymptomatic plants in the western and southwestern regions of Saudi Arabia and were tested for the presence of Watermelon chlorotic stunt virus (WmCSV) and other suspected cucurbit viruses by double antibody sandwich enzyme-linked immunosorbent assays. Ninety-eight samples were found to be positive for the presence of WmCSV, nine samples were positive for the presence of Cucurbit yellow stunting disorder virus (CYSDV), and 22 showed a mixed infection with both WmCSV and CYSDV. No other cucurbit viruses were detected in any of the samples. Host range experiments revealed that eight out of fourteen tested plant species were susceptible to WmCSV. PCR products of approximately 1.2 kb were obtained after amplification using primers specifically targeting the coat protein region of WmCSV. Positive PCR results were confirmed by dot blot hybridization. Coat protein gene sequences from eleven WmCSV isolates indicated that the highest identity was between the 104WMA-SA isolate from the Wadi Baish location and a previously reported isolate from the AL-Lith location in Saudi Arabia. The lowest identity was observed between the 42WMA-SA isolate and an isolate from Palestine.

Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant (해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계)

  • Moon, Won-Sik;Won, Jong-Nam;Huh, Jae-Sun;Jo, Ara;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.