• 제목/요약/키워드: Plant configuration

검색결과 262건 처리시간 0.024초

도시지역 에너지 공급체계 개선방안 검토 연구 (A Study on the Planning of Urban Energy Supply Systems Including Co-generation System)

  • 우남섭;이태원;김용기
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.177-182
    • /
    • 2009
  • The purpose of this study is to investigate planning of urban energy supply systems configuration and operating conditions for the district heating and cooling system using combined heat and power system. Generally the district heating and cooling system has been known to one of the effective way for energy saving, cost reduction and demand side management of energy. Economical analyses were carried out and operating characteristics for some systems were examined in terms of GER factor which represents to the ratio of gas and electricity costs. Rates of the energy consumption and the $CO_2$ emission were compared from the system configuration of the energy supply system with new district cooling system with the conventional one.

  • PDF

사양 기반 플랜트 설계 시스템에서 생성된 원자력 플랜트 설계 데이터의 중립 모델로의 통합 변환 (An Integrated Translation of Nuclear Power Plant Design Data ftom Specification-driven Plant Design Systems to a Neutral Product Model)

  • 문두환;양정삼;한순흥
    • 한국CDE학회논문집
    • /
    • 제14권2호
    • /
    • pp.96-104
    • /
    • 2009
  • It gradually becomes important to study on how to efficiently integrate and manage plant lifecycle data such as 2D schematic and 3D solid data, logical configuration data, and equipment specifications data. From this point of view, converting plant design data from various systems into neutral data independent from any commercial systems is one of important technologies for the operation and management of plants which usually have a very long period of life. In order to achieve this goal, a neutral model for efficient integration and management of plant data was defined. After schema mapping between one of specification-driven plant design systems and the neutral model was performed, a plant data translator is also implemented according to the mapping result. Finally, by experiments with nuclear power plant design, the feasibility of the translator was demonstrated.

5KW급 인산형 연료전지 발전설비의 전력특성연구 (Electrical Characteristics of the 5KW PAFC Experimental System)

  • 유상진;최수현;김영택
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1989년도 하계종합학술대회 논문집
    • /
    • pp.9-11
    • /
    • 1989
  • A phosphoric acid fuel cell ( PAFC ) power plant with a capacity of SKW a.c has been constructed for R & D purposes at KIER under a sponsorship of KEPCO. The PAFC power plant has successfully generated an electricity for the first time in Korea. In the paper, the plant configuration and the experimental results ace reported.

  • PDF

Contruction of a robust control system for a plant with time delay

  • Morikawa, Youichi;Kamiya, Yuji
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1995년도 Proceedings of the Korea Automation Control Conference, 10th (KACC); Seoul, Korea; 23-25 Oct. 1995
    • /
    • pp.103-105
    • /
    • 1995
  • In this paper, though Simith controller is also used, we propose a new system configuration which can be regarded an SISO continuous nth-order plant with time delay of k-times of a sampling period as a linear discrete (n + k)th order plant of which all state variables can be available. Consequently, we can pply linear control system design techniques which do not consider the existence of time delay to the proposed system.

  • PDF

하동 화력 발전소 전범위 시뮬레이터 개발 (A Full Scale Fossil Power Plant Simulator For Hadong)

  • 김성호;김종현;조창호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.204-204
    • /
    • 2000
  • This paper describes the development of training simulator for Hadong fossil Power Plant. The simulator was developed to train operator, test new control Logic and evaluate alternative operating procedure for expert engineer of control system. The most control logics such as Siemens TELEPERM ME and GE Mark V are translated directly from microprocessors. Those HMI are also directly emulated. The simulation was performed by ProTRAX modeling software. The paper discusses the configuration of simulator and the simulation results of 30%, 50%, 75% and 100% normal rate load test.

  • PDF

A New LMR SG with a Double Tube Bundle Free from SWR

  • Sim Yoon-Sub;Kim Seong-O;Kim Eui Kwang;Hahn Do Hee
    • Nuclear Engineering and Technology
    • /
    • 제35권6호
    • /
    • pp.566-580
    • /
    • 2003
  • To resolve the concern of the SWR possibility in LMR and improve the economic feature of LMR, relative performance of various SG designs using a double tube bundle configuration is evaluated and a new SG design concept is proposed. The new steam generator design houses two tube bundles that are functionally different and its tube bundle region is radially divided into two. It prevents the occurrence of sodium water reaction while sodium is still used as the coolant for the primary heat transport system. The feasibility of the SG with a double tube bundle for actual use in an LMR plant is evaluated by setting up the skeleton of the NSSS for various possible configurations of the SG tube bundles. The evaluation revealed the relative advantages and disadvantages of the configurations and the new SG design concept performs good and can be actually used in an LMR plant.

분산제어 시스템의 구성 방법 및 성능 평가 (Configuration methodology and performance evaluation of distributed control systems)

  • 김평수;권욱현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.616-619
    • /
    • 1996
  • This paper presents the configuration methodology of Distributed Control System(DCS)s for process plant and their performance evaluation. Performance evaluation is specified both in terms of operational and installation aspects of system. In order to evaluate performance criteria of operational aspect, a simulation method is proposed. Modeling of system components including process computer, database, process controllers and LANs, etc, is implemented for simulation. Based on these characteristics, different system configurations are evaluated and compared through results about evaluation criteria in order to select the best DCS for particular process. The results, in abbreviated form, of the performance evaluation of DCS controlling a CAL(Continuous Annealing Line) plant of iron process are presented.

  • PDF

터빈제어용 3중화 디지털 제어시스템의 구성방식에 관한 연구 (A Study on Configuration Method of TMR Control System for Turbine Control)

  • 정창기;신윤오
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 B
    • /
    • pp.731-733
    • /
    • 1999
  • Distributed Control System has been used for large scale and critical system control such as aerospace industries, chemical and power plant and so on. It is very impotant factors for design of the control system to be reliable and fault-tolerant. These control systems have backup or redundant processing modules for minimizing the time of failure and improving reliability. But such methods have changeover duration from faulty module to healthy one. During that interval, feedback control loop raises bumper and performance of the system become worse. TMR(Triple Modular Redundancy) control system is one of the best reliable ones that can overcome such a mortal drawback. This paper analyzes the components of TMR system functionally and proposes practical and cost effective configuration method for turbine control of thermal power plant.

  • PDF

Preliminary Economic Analysis based on Optimization of Green Ammonia Plant Configuration in the Middle East for Import into Korea

  • Hyun-Chang Shin;Hak-Soo Mok;Woo-Hyun Son
    • 한국산업융합학회 논문집
    • /
    • 제27권2_1호
    • /
    • pp.277-285
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'net zero'. Due to limitations in producing green hydrogen domestically, Korean companies are interested in importing green hydrogen produced overseas. The Middle East has high-quality solar energy resources and is attracting attention as a region producing green hydrogen using renewable energy. To build a green ammonia plant, optimization of the production facility configuration and economic feasibility analysis are required. It is expected that it will contribute to reviewing the economic feasibility of constructing overseas hydrogen production plants through preliminary economic feasibility analysis.