• 제목/요약/키워드: Plant Safety Information Management

검색결과 90건 처리시간 0.025초

국내 원전 엔지니어링운영모델 활용성 향상을 위한 시스템 개발 (Development of Electronic Management System for improving the utilization of Engineering Model in Domestic Nuclear Power Plant)

  • 이상대;김정운;김문수
    • 한국안전학회지
    • /
    • 제36권5호
    • /
    • pp.79-85
    • /
    • 2021
  • A standard engineering model that reflects the current organization system and engineering operation process of domestic nuclear power plants was developed based on the Standard Nuclear Performance Model developed by the American Nuclear Energy Association. The level 0 screen, which is the main screen of the engineering model computer system, consisted of an object tree structure, which provided information that is phased down from a higher structure level to a lower structure level (i.e., level 3). The level 1 screen provided information related to the sub-process of the engineering operation, whereas the Level 2 screen provided information related to each engineering operation activity. In addition, the Level 2 screen provided additional functions, such as linking electronic procedures/guidelines, providing electronic performance forms, and connecting legacy computer systems (such as total equipment reliability monitoring system, configuration management systems, technical information systems, risk monitoring systems, regulatory information, and electronic drawing system). This screen level increased the convenience of user's engineering tasks by implementing them. The computerization of an engineering model that connects the entire engineering tasks of an establishment enables the easy understanding of information related to the engineering process before and after the operation, and builds a foundation for the enhancement of the work efficiency and employee capacity. In addition, KHNP developed an online training module, which operates as an e-learning process, on the overview and utilization of a standard engineering model to expand the understanding of standard engineering models by plant employees and to secure competitiveness.

RFID를 활용한 원전부품 공급사슬관리시스템 구축 방안 (Implementation of Nuclear Power Plant components Supply Chain Management System based on RFID)

  • 박두진;하창승;정이상
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2012년도 추계학술대회
    • /
    • pp.923-924
    • /
    • 2012
  • 원자력발전은 기본적으로 공급의 안정성과 경제성을 갖추고 있는 에너지원으로서 전력생산에 관한 자원 및 환경문제의 한계를 극복한 에너지원으로 평가받고 있다. 그러나 최근 일본 후쿠시마 원전사고로 독일과 이탈리아 등은 원전의 단계적인 철폐와 도입을 취소하는 등 원전의 안정성에 대한 논의가 활발히 이루어지고 있다. 우리나라도 최근 원전부품 납품에 관한 비리가 발생하는 등 원전에 관한 크고 작은 안전사고가 발생하고 있다. 따라서 본 논문에서는 원전부품을 효율적이고 안전하게 관리하기 위해 RFID를 활용한 원전부품의 공급사슬관리시스템의 구축 방안을 제안한다.

  • PDF

TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구 (Development of Synchro-EVM System Integrating TOC-CPM and EVM)

  • 이도헌;장길상
    • 대한안전경영과학회지
    • /
    • 제19권4호
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

Heater interlock by-pass로 인한 위험분석 및 사고방지에 대한 연구 (A Study on Risk Analysis and Acident Prevention Heater Interlock By-pass)

  • 손재근;박교식;강태연;여영구
    • 한국가스학회지
    • /
    • 제7권1호
    • /
    • pp.24-27
    • /
    • 2003
  • 본 연구에서는 국내 석유화학공장에서 운전되고 있는 CDU plant heater, NCC plant heater, CO plant Heater, aromatic plant heater 등 15개 plant heater를 대상으로 조사하였으며, 세부 내용으로는 heater 사고 예방을 위한 공정운전 표준, alarm 작동시 조치 및 setting 변경, 시운전 점검사항, interlock system 분석, interlock by-pass 운전현황, heater 주요 사고$\cdot$사례 등을 분석하였다. interlock 방지 및 시설개선 대책으로 실시간 monitoring 설치, local 압력계 및 온도계추가설치, 초기 운전시 점검방법, interlock by-pass 관리, 오작동 계기 sensor maker 변경, 운전 mode 변경시 주요 현장확인사항, DCS alarm 관리방법 등을 제시하였다. heater interlock에 관련되는 국내외 연구자료가 거의 없어서 주로 석유화학업체 운전 절차서, 공정trouble 일지, 부서장 및 현장 운전원의 의견을 반영하여 연구하였다. 연구의 결과에 따라 interlock 방지 및 시설개선 대책을 운전 절차서에 반영한다면 interlock으로 인한 사고를 크게 줄일 수 있을 것으로 기대된다.

  • PDF

중대사고관리를 위한 훈련도구(TRAIN)의 개발 (Development of TRAIN for Accident Management)

  • Moo-Sung Jae
    • 한국안전학회지
    • /
    • 제16권1호
    • /
    • pp.84-87
    • /
    • 2001
  • 중대사고관리는 원전의 노심손상사고를 예방하거나 완화시키기 위하여 기존의 가용자원이나 시스템, 운전의 행위를 사용하는 것을 말한다. 제어실이나 기술지원반을 위하여 중대사고관리를 위하여 개발된 TRAIN(Training pRogram for Accident Management Program In Nuclear Power Plant)의 초기문자로 명명된 시스템을 본 논문에 소개하였다. TRAIN은 중대사고현상 KB(Knowledge Base)와 사고시나리오 KB, 제어도와 함께 사고관리 절차도 그리고 필요정보로 구성되어있으며 제어실이나 기술지원반에게 중대사고의 현상지식을 취득하게 하고, 발전소의 취약특성을 파악하게 하며, 상당한 스트레스하에서 주어진 문제를 해결하게 하는데 본 연구의 결과는 기여할 것이다.

  • PDF

컴퓨터 단층촬영 방사선 노출 관리 시스템 소프트웨어 설계 (System Software Design of Computerized Tomography Radiation Dose Management)

  • 양유미;조상욱;이길흥
    • 디지털산업정보학회논문지
    • /
    • 제10권3호
    • /
    • pp.41-48
    • /
    • 2014
  • This paper provides the design of system software for the management of radiation dose that is generated by using computerized tomography(CT). Recently, the radiation leakage incident of Japanese nuclear power plant was in the news internationally and there is a growing interest not only in nuclear power plant but in medical radiation exposure. In spite of the fact that currently safety management of radiation is under control only the workers of the radiation involved, now the exposure management of patients have been required. As surgery and inspections using the radiation have increased, this medical radiation exposure is increasing too. But it is a real situation that medical institutions don't know the level of radiation exposure applied to the patient. Therefore, a system for managing the radiation exposure of a patient from the medical institution is required. This paper proposes a design of a software program that manages the radiation exposure of CT which is a typical imaging tool to use the radiation in the medical institution. By check the amount of radiation dose and set the limit of dose, we would be of help to optimize the medical exposure of the patient.

스마트공장의 IoT 센서 모니터링을 통한 에너지절감 및 안전성 향상 연구 (A Study on Energy Saving and Safety Improvement through IoT Sensor Monitoring in Smart Factory)

  • 최우형;강인철;김창수
    • 한국재난정보학회 논문집
    • /
    • 제20권1호
    • /
    • pp.117-127
    • /
    • 2024
  • 연구목적: 중소기업 제조공장에서 에너지 관리, 온도, 습도, 분진 및 가스, 공기 질, 기계작동 상태 등을 통합적으로 모니터링하여 에너지 절감 및 제조 공장 인프라의 안전성 향상을 위한 기반 연구를 수행하는 것이 목적이다. 연구방법: 이를 위해 디지털 전력량계 및 IoT 센서를 통해 에너지 관련 데이터 및 환경적인 정보들을 실시간으로 수집하였으며, 수집된 정보를 기반으로 모니터링 및 분석을 통해 에너지 절감을 위한 상황 전파 및 대응을 위한 연구를 진행하였다. 연구결과: ESG 경영 활동의 핵심 지표에 속하는 에너지관리, 비용 절감과 안전성 향상을 고려한 적용 방안을 제시하였다. 결론: 본 연구는 기업에서 실제적인 사례 연구로 스마트공장에서 다양한 센서 장치와 관련된 장치들을 활용하였으며, 이를 통해 수집된 정보를 기반으로 에너지 절감 및 안전성 향상에 대한 기반의 체계를 제시하였다.

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제7권2호
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

확률분포에 따른 불확실한 변수를 고려한 위험도기반의 정성적 평가 (Qualitative RBI Analysis in Considered with Uncertain Variables by Probabilistic Distribution)

  • 허호진;정재욱;김주동;최재붕;최송천;황인주
    • 설비공학논문집
    • /
    • 제25권2호
    • /
    • pp.70-78
    • /
    • 2013
  • Plants which are having conditions of high temperature and pressure always are exposed to danger. In order to prevent unexpected accidents, safety management that can effectively and appropriately examine facilities is required in plant operation. RBI(Risk-Based Inspection) technology in API 581 is one of standard management technique for evaluating risk on petroleum plants. There are qualitative and quantitative assessments in RBI methodology. Quantitative evaluation step is complex and required much information, so high-risk facilities in plant are selected firstly by qualitative method. Qualitative RBI is performed by choosing the answer in prepared questionnaire. However, it is difficult to believe thoroughly results from survey including ambiguous information. In this study, the procedure of qualitative RBI analysis with considering probability distribution concept were proposed by using Monte Carlo simulation method in order to increase reliability in spite of uncertain factors. In addition, qualitative risk of cooling system for LNG plant was evaluated using proposed procedure. Although 20 items of total 39 assessment items are applied to uncertain factors, risk section of high probability(89%) were verified. The detailed results were described in manuscript.

지능형 실시간 대기확산 시스템에 관한 연구 (A Study on Smart Real-time Atmospheric Dispersion System)

  • 오정석;현지이;방효중
    • 한국가스학회지
    • /
    • 제16권4호
    • /
    • pp.44-51
    • /
    • 2012
  • 대부분의 산업시설이 유해물질을 다루고 있기 때문에 산업시설의 사고발생은 막대한 물적, 인적 피해를 발생시키므로 안전관리, 중대형 사고 예방 및 위험 예측 등이 중요시 되고 있다. 특히, 유해물질 누출사고는 누출물질, 저장시설, 대기 상태에 따라 유독가스의 확산 속도와 범위가 달라지므로 이를 모사하는 대기확산 시스템이 이용되어왔다. 모사에 기반하는 대기확산 시스템은 산업시설 구조물 설계 단계에서 주로 사용되며 누출 사고 시 즉각적인 처리와 대응이 어렵다. 실시간 대기정보 데이터를 이용한 연구 및 사례는 존재하지만 시스템의 성능저하 및 전문적 지식의 결여로 신속한 처리 및 대응이 미흡하였다. 본 논문은 에너지 플랜트 환경에서 특수성과 효율성을 강화하여 유해화학물질 누출로 인한 대기확산범위를 즉각적으로 산출하고 누출 시점 및 지점을 지능형 알고리즘으로 결정함으로써 사고예방형 실시간 지능형 대기확산 시스템을 구현한다.