Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

A Study on the Selection and Stability of Slings and Lugs of Mobile Cranes (이동식 크레인의 슬링.러그 선정 및 안정성 검토 연구)

  • Kim, Sun-Kuk;Seo, Jong-Min;Ho, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.164-174
    • /
    • 2008
  • As buildings become larger, higher and more complex in most construction sites, construction projects have to deal with transportation of more materials, labor and equipment, necessitating more use of construction equipment. Notably, in the high-rise building and plant construction projects mobile cranes are adopted more frequently among different types of construction machinery, which also results in serious industrial accidents relating to the use of crane. To reduce serious industrial accidents involving cranes, researches on its stability is in need. The research herein aims to study how to select sling and lug of mobile crane and review its stability. The research outcomes herein will make considerable contributions to selecting mobile cranes efficiently and ensuring their stability.

A Fundamental Study on the Comparison and Analysis of Overseas Design Orders of Korea, China and Japan (한중일 해외설계수주액의 비교·분석 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.195-196
    • /
    • 2019
  • The purpose of this study is to analyze the scale of overseas design orders in Korea, China and Japan by region and type of work, and to draw implications. As a result of analyzing the overseas design sales market of Korea, China and Japan, all three countries have the highest percentage of overseas sales in the Asian market, and the overseas design sales are the highest in power generation, chemical plant and transportation sectors. In addition to the Middle East and Asian markets, Japan and China have also diversified their strategies to diversify their markets by taking orders in various regions such as Europe, Africa and the United States. In particular, China is promoting the "New Silk Road Project" (One belt, One road), linking land and sea to a total of 25 countries and actively supporting aid projects in Africa and Asia, have. In addition, Japan has been actively supporting the government's expansion of ODA projects to expand overseas market entry. Therefore, it is necessary for Korea to increase its market share through diversification of overseas design market and diversification of industrial type, and to participate in overseas design market by expanding customized R&D investment.

  • PDF

A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) - (폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 -)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.5
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

Risk Mitigation for Independent Power Producer Projects in Developing Countries Based on Case Studies (사례연구를 통한 개발도상국 민자발전사업 리스크 경감방안)

  • Yoon, Young-Il;Yoo, Ho-seon;Yeo, Yeong-Koo
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.50-57
    • /
    • 2013
  • This study investigates the risks that can occur during the development stage of IPP project in developing countries. In case that ECA and MLA cannot participate due to poor credit rating of the country, the diversification of power purchaser in marginal states can be a great help to reduce both market risk and country risk at the same time. In case of thermal power plants and combined cycle power plants, the effect of performance degradation as time passed will be considered and expected profit of sponsors should be maintained. Recently, developing countries are expanding IPP projects to reduce the financing cost and Korean power companies are positively participating in IPP projects. Accordingly, the loss of Korean companies should be minimized by risk management through the risk mitigation methods of this study.

  • PDF

A Preliminary Study on a Method for the Weight Estimation and Calculation of Offshore EPC Projects (해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.2
    • /
    • pp.154-161
    • /
    • 2016
  • There are several existing studies for the weight estimation of offshore plants. However, most of them were applicable at the pre-FEED (Front End Engineering Design) stage. In this paper, a preliminary study on a method for the weight estimation and calculation of offshore EPC (Engineering Procurement Construction) projects is made for the use at the estimation stage after FEED. Based on literature surveys including ISO (International Organization for Standardization) 19901-5 about weight estimation, we proposes new weight factors and a weight curve. Weight factors defined in this study include MTO (Material Take-Off), estimated weight, FEED maturity factor, allowance factor, and contingency factor. The proposed method utilizes bottom-up approach for weight estimation and it can be used for the weight estimation and calculation of offshore EPC projects at the estimation stage.

The Analysis of Factors Affecting the Roadmap for Participation in Renewable Energy Projects Using a Multi-Level Model (다층모형을 활용한 신재생 에너지 사업 참여 로드맵에 미치는 영향 요인 분석)

  • Kim, Han-Jib
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.10
    • /
    • pp.422-433
    • /
    • 2021
  • At this point in time when active participation in renewable energy projects is required, basic information on growth engines and substantial promotion strategies for participation in renewable energy projects is needed. According to the this study tried to provide basic information for vitalizing participation in the renewable energy business by analyzing the factors affecting the new energy business participation roadmap using the multi-layered model. As a result of this study, it can be seen that in order to achieve an effective new energy business participation roadmap, it is necessary to re-establish the new and renewable energy business participation factors by industry. Specifically, it is necessary to prepare appropriate countermeasures such as the leading organization of the project, profit distribution method, green industry financial support, project implementation method, power plant location, and comprehensive long-term strategy, and there is an institutional approach that can promote the development of related industries. found to be necessary. Above all, it suggested that in order to achieve an effective new energy project participation roadmap, an institutional approach is needed that can expand the supply of new and renewable energy while minimizing the burden on the national economy and promote the development of related industries.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

ESTABLISHMENT OF CDM PROJECT ADDITIONALITY THROUGH ECONOMIC INDICATORS

  • Kai. Li.;Robert Tiong L. K.;Maria Balatbat ;David Carmichael
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.272-275
    • /
    • 2009
  • Carbon finance is the investment in Greenhouse Gas (GHG) emission reduction projects in developing countries and countries with economies in transition within the framework of the Kyoto Protocol's Clean Development Mechanism (CDM) or Joint Implementation (JI) and with creation of financial instruments, i.e., carbon credits, which are tradable in carbon market. The additional revenue generated from carbon credits will increase the bankability of projects by reducing the risks of commercial lending or grant finance. Meantime, it has also demonstrated numerous opportunities for collaborating across sectors, and has served as a catalyst in bringing climate issues to bear in projects relating to rural electrification, renewable energy, energy efficiency, urban infrastructure, waste management, pollution abatement, forestry, and water resource management. Establishing additionality is essential for successful CDM project development. One of the key steps is the investment analysis. As guided by UNFCCC, financial indicators such as IRR, NPV, DSCR etc are most commonly used in both Option II & Option III. However, economic indicator such as Economic Internal Rate of Return(EIRR) are often overlooked in Option III even it might be more suitable for the project. This could be due to the difficulties in economic analysis. Although Asian Development Bank(ADB) has given guidelines in evaluating EIRR, there are still large amount of works have to be carried out in estimating the economic, financial, social and environmental benefits in the host country. This paper will present a case study of a CDM development of a 18 MW hydro power plant with carbon finance option in central Vietnam. The estimation of respective factors in EIRR, such as Willingness to Pay(WTP), shadow price etc, will be addressed with the adjustment to Vietnam local provincial factors. The significance of carbon finance to Vietnam renewable energy development will also be addressed.

  • PDF

Element Technology and Strategy of Digital Twin in the Water Treatment (수처리공정의 디지털 트윈 요소기술과 추진 전략)

  • Young-Man Cho;Yong-Jun Jung
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.284-290
    • /
    • 2023
  • Domestic water supply and sewage facilities are rapidly aging and maintenance difficulties such as aging of operation and management personnel are overlapping, so Digital Twin technology is attracting attention as an intelligent means of process management. Digital twin projects for domestic water treatment processes include the smart sewage treatment project promoted by the Ministry of Environment, projects independently promoted by some local governments, and digital twin purification plant projects promoted by K-water. However, the content of digital twin promotion is different for each institution. Therefore, in the water treatment process, technological standardization and step-by-step implementation methods for digital twins must be preceded to reduce trial and error in future business promotion. This study aims to provide an efficient promotion plan by prescribing the digital twin element technology and composition method in the water treatment process and reviewing the contents currently being promoted by the Ministry of Environment, local governments, and K-Water individually.