• 제목/요약/키워드: Plant Projects

검색결과 324건 처리시간 0.029초

Importance of pumped storage hydroelectric power plant in Turkey

  • Aras, Egemen
    • Advances in Energy Research
    • /
    • 제5권3호
    • /
    • pp.239-254
    • /
    • 2017
  • The world began to search for new energy sources with increasing energy demand. Renewable energy sources are as hydropower important for alternative energy. Countries with high hydroelectric potentials continue to work to utilize hydroelectric power plants in the most efficient way. Pumped storage hydropower plants are an important investment to meet the growing energy needs at peak times and to store energy. Although it produces energy in many countries, pumped storage hydropower plants have not begun to be built in Turkey which has high hydroelectric potential. A new era will be opened for energy production in Turkey where a large number of pumped storage hydropower plants projects are in study phase with the construction of pumped storage hydropower plants and first nuclear power plant.

시스템엔지니어링 방법론을 적용한 소프트웨어 테스트 케이스 개발에 관한 연구 (A Study on the Software Test Case Development using Systems Engineering Methodology)

  • 살림셀리;신중욱;김진일
    • 시스템엔지니어링학술지
    • /
    • 제14권2호
    • /
    • pp.83-88
    • /
    • 2018
  • Software has become an integral part of almost any system, triggered by the ever-growing demand for automation and artificial intelligent throughout engineering domains. The complexities of software-centric systems are also increasing, which make software test efforts become essential in software development projects. In this study, we applied systems engineering methodology in generating software test cases. We found out the similarities between requirements analysis and traceability concept of systems engineering and test specification contents of software test. In terms of acceptance test, software test cases could be considered as validation requirements. We also suggested a method to determine test order using a SysML modeling tool.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안 (Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects)

  • 이원규;박문선;김용수
    • 한국건설관리학회논문집
    • /
    • 제11권5호
    • /
    • pp.3-14
    • /
    • 2010
  • 본 연구는 EPC LSTK 프로젝트의 계획단계에서 계약자가 수행하는 타당성 분석사례들을 조사 및 분석하고, 이에 대한 문제점 및 개선방안 제시를 위하여 수행되었다. 이를 위하여 GCC 국가를 대상으로 한 5개의 타당성분석에 대한 사례를 조사하고 이를 분석하였다. 상기와 같은 목적과 방법에 따라 진행된 본 연구의 결과를 요약하면 다음과 같다. 1) 타당성 분석시 고려변수 등에 대한 영향요인 분석 미흡으로 원가상승, 공기지연 초래 및 품질저하의 문제점이 존재하는 것으로 분석되었다. 2) 상기의 문제점을 바탕으로 원가상승에 대한 문제, 공기지연에 대한 문제, 품질저하의 문제에 대해 타당성 분석 차원의 개선방안을 제시하였다. 3) 해외 플랜트 공사에 있어 상기에서 분석한 문제점 및 개선방안을 준용할 수 있는 사업 타당성 분석 프로세스를 단계 별로 제시하였다.

성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 - (A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -)

  • 강신봉;김승철
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.48-55
    • /
    • 2016
  • 본 연구는 성공적인 해외건설프로젝트 수행을 위한 리스크 관리 계획 절차를 구축하여 활용방안을 제안하는 것을 목적으로 한다. 접근방법은 해외건설산업의 현황을 살펴보고, 영국의 프로젝트관리 체계인PRINCE2의 리스크 관리 기법의 적용과 국내 해외 건설사들의 리스크 관리 수행사례를 분석하였다. 이를 토대로 리스크 관리를 위한 해외건설사의 조직 구성과 업무프로세스를 제안하고, 리스크 관리 계획. 절차를 개발하여, 해외건설 프로젝트에 적용하였다. 그 결과, 리스크 관리와 계약관리를 효과적으로 수행할 수 있게 되었다. 본 연구의 결과는 향후 글로벌 건설기업으로 진화를 위한 해외건설사의 해외건설프로젝트 사업 능력 향상을 위해 유용하게 활용 될 수 있을 것으로 판단된다

플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구 (A Study for Selecting the Plant Project Risk Management Check List)

  • 최두회;방홍순;이태형;김옥규
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.54-64
    • /
    • 2018
  • 현재 건설사업의 발전으로 다양화가 되면서 관심을 가져야 할 분야 중 하나가 리스크이다. 리스크란 잠재적인 성격을 가지고 있으며 예측하기가 어렵다. 또한, 사업기간지연, 사업비 등 사업의 성패를 좌우할 만큼의 중요한 요인이다. 국내 외 건설사업에서 리스크 관리의 중요성을 인지하여 리스크에 관한 기법, 분석 등으로 연구가 지속되고 있다. 각 회사에서는 리스크 관리를 위해 PRM 체크리스트를 사용하는데, 기준과 항목이 각 건설사별로 다르다. 플랜트의 원활한 리스크 관리를 위해서 플랜트 PRM 체크리스트가 필요하다. 따라서 본 연구에서는 건설사업에서 고려되는 위험요인을 분석하고, 리스크의 사전대비를 위하여 리스크 관련 사례분석과 전문가들의 의견을 종합하여 플랜트 PRM체크리스트를 제안하였다. 그리고 발생빈도 및 중요도를 점수로 나타내서 각 리스크 요인별로 중요도를 보여주었다.

플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델 (Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects)

  • 강현욱
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.98-107
    • /
    • 2022
  • 본 연구의 목적은 플랜트 건설사업에서 모듈러 설계대안에 대한 위험기반의 평가지수를 도출하는 모델을 제안하는 것이다. 이에 따라 ① 기초사업비와 모듈을 적용하는 대상과 범위를 설정하는 단계, ② 설계, 구매, 제작, 운송, 시공업무에 대한 중요도, 편리성, 효율성 지수를 평가하는 단계, ③ 중요 위험사건의 영향에 따른 경제적 손실을 예방하기 위해서 필요한 예비비를 분석하여 총사업비를 추정하는 단계, ④ 모듈 설계대안별로 평가된 관리업무의 효율성 지수와 총사업비를 비교하여 RVI를 도출하는 단계로 구성하였다. 그리고 모델의 사용성을 검증하기 위해서 Module Plan-A는 Pipe Rack을 모듈로 적용하는 경우, Module Plan-B는 Steel Structure, Pipe Rack, Process Module을 모듈로 적용하는 경우로 설정하여 관리업무의 중요도, 편리성, 효율성 지수를 평가하고 위험예비비를 포함하여 총사업비를 추정하였다. 이와 같은 과정으로 모델을 검증한 결과, 1개의 공종에 모듈을 적용한 Module Plan-A 보다 3개의 공종에 모듈을 적용한 Module Plan-B가 관리업무의 효율성은 낮은 것으로 나타났지만, 기초사업비에서 간접비가 절감되어 종합적인 RVI는 높게 평가되었다.