A Study on Automatic Space Analysis for Plant Facilities Based on 3D Octree Argorithm by Using Laser Scanning Information

  • Kim, Donghyun;Kwon, Soonwook;Chung, Suwan;Ko, Hyunglyul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.667-668
    • /
    • 2015
  • While the plant projects grow bigger and global attention to the plant is increasing, efficient space arrangement is not working in plant project because of the complex structure in installing the equipment unlike the construction project. In addition to this, presently, problem in installation process caused by the disagreement between floor plan and real spot is rising. Therefore the target of this research is to solve the problems and reaction differences, caused by changing the space arrangement in installing the equipment of plant construction. And this research suggests the equipment arrangement method for construction and related processes. To solve the problem, 3D cloud point data of space and equipment is collected by 3D laser scanning and the space matching is operated. In processing the space matching, data is simplified by applying the octree algorithm. This research simplifies the 3D configuration data acquired by 3D scanner equipment through the octree algorithm, and by comparing this data, identifies the space for target equipment, and finally suggests the algorithm that makes the auto space arrangement of equipment possible in construction site and also suggests the process to actualize this algorithm.

  • PDF

Boryeong Fire Plant Museum Project (보령화력발전소 홍보관 계획)

  • Lee, Moo-Sang;Jung, Do-Kuen
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.77-78
    • /
    • 2007
  • This project has been designed for people to experience and understand the process, importance and benefit of coal fire plants. As the biggest and first typical Korean fire plant using coal, Boryeong fire plant has had important roll for the Korean industries. Even so, people has had wrong prejudice for the fire plant in terms of environmental protection. To do these kind of rolls, this museum has been designed with theme, "Boryeong fire plant mating symbiotic relationship between nature, human and technologies." The space was zoned with five major themes: i. circulation of energy in nature, ii. electric power and eco-fire plant, iii. future energy, iv roll for future of environment, v. Korea as the leading energy industry. The design has been developed focused on spatial experiences to make 'Design Sequence' with linear circulations haying several important destinations. The interior has been finished with minimal color and materials projected by big sized movie and various LED movie system. Concept of appordance has been used to make interactive experiences between exhibits and visitors.

  • PDF

AGING ASSESSMENT OF CANDU PLANT MAJOR COMPONENTS

  • Jeong, Il-Seok;Lee, Kyoung-Soo;Kim, Tae-Ryong
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.415-423
    • /
    • 2003
  • Korea Electric Power Research Institute(KEPRI) had worked a comprehensive Plant Lifetime Management (PLiM) project for a CANDU plant in corporation with Korea Hydro and Nuclear Power(KHNP). The project had been performed to understand the aging status of major components screened from the plant and to address provisions for the continued operation over its design life. A feasibility of the continued operation was reviewed in the aspects of technology, economics, and regulatory environments. This paper introduces general approach of aging assessment, screening of critical components and an experience of aging assessment for an example of fuel channel that is the most critical component in CANDU plant.

  • PDF

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

The Status of Power Plant Simulation Technology and KEPCO's Plan for Self-Reliance of the Technology (발전소 시뮬레이터 기술동향 및 국내 기술자립 계획)

  • Shin, Yeong-Cheol;Lee, Yong-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.525-528
    • /
    • 1993
  • KEPCO Research Center is carrying out a simulator(full scope replica type) development project for two nuclear power plants(Kori-2, Younggwang-3,4) and one fossil power plant(Poryong-3,4). In this project, we aim not only the installation of high performance simulators at the power plant sites but also the realization of self reliance of power plant simulation technology in Korea. In the course of preparing procurement specification for the 3 simulators, the present status of power plant simulation technology has been surveyed and is presented in this paper. The fidelity of simulation and the automation of simulation model production has been greatly improved due to the ever increasing computing power of today's workstations. The need and importance of the application of high fidelity simulators to the operator training is refocused since the accident at TMI Nuclear Power Plant, U.S.A.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Simulation and Data Sampling Modelling for 1000MW Boiler Process (1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션)

  • Park, Doo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF

Development of STAGE-GATE based Evaluation Index for the Improvement of Design Quality of Plant Material (플랜트 기자재 설계품질 향상을 위한 STAGE-GATE 기반 평가항목 개발)

  • Lee, In Tae;Baek, Dong Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.65-71
    • /
    • 2020
  • Worldwide plant market keeps maintaining steady growth rate and along with this trend, domestic plant market and its contractors also maintain such growing tendency. However, in spite of its external growth, win-win growth of domestic material industry that occupies the biggest share in plant industry cost portion is extremely marginal in reality. Domestic plant material suppliers are required to increase awareness of domestic material brand by securing quality and reliability of international standard through improvement of design quality superior to that of overseas material suppliers. Improvement of design quality of plant material becomes an essential element, not an option, for survival of domestic plant industry and its suppliers. Under this background, in this study, priority and importance by each evaluation index was analyzed by materializing plant design stage through survey of experts and defining evaluation index by each design stage and based on this analysis result, evaluation index of stage-gate based decision-making process that may improve design quality of plant material was suggested. It is considered that by utilizing evaluation index of stage-gate based decision-making process being suggested in this study, effective and efficient decision-making of project decision-makers would be enabled and it would be contributory to improve design quality of plant material.

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.