• Title/Summary/Keyword: Plant Operation & Maintenance

Search Result 245, Processing Time 0.033 seconds

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung;Son, Ki-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.6
    • /
    • pp.574-581
    • /
    • 2012
  • Condition-based maintenance(CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance strategy as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

Risk Monitor Development for On-Line Maintenance (가동중 정비를 위한 Risk Monitor 개발)

  • 김길유;한상훈;김태운
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.21-26
    • /
    • 1997
  • Korea Atomic Energy Research Institute (KAERI) developed a risk monitor called Risk Monster which supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Risk Monster can update the plant risk continuously according to the change of system/component configuration since Risk Monster reevaluates the plant risk based on the Probabilistic Safety Assessment (PSA) results. A brief description of Risk Monster is provided. The PSA model of UCN 3, 4 nuclear power plant was converted by KAERI to Risk Monster model. Using this Risk Monster model, a feasibility study of the on-line maintenance of an Essential Service Water (ESW) pump was performed. On-line maintenance of one ESW pump has been shown to be acceptably safe, and has economic benefits. In addition, it is not a violation of technical specification to continue plant operation with an out-of-service ESW pump.

  • PDF

Development of RCM Framework for Implementation on Safety Systems of Nuclear Power Plant

  • Kim, Tae-Woon;Brijendra Singh;Park, Chang K.;Chang, Tae-Whee;Song, Jin-Bae
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.631-636
    • /
    • 1996
  • This paper presents a Reliability Centered Maintenance (RCM) framework for implementation on safety system of nuclear power plant (NPP). RCM is a systematic methodology to optimize the surveillance and maintenance tasks for critical components which provides efficiently and effectively reliability of system and safety of plant. Maintenance of the safety systems is essential for its safe and reliable operation. Reliability Centered Maintenance at NPP is the program which assure that plant system remains within original design criteria and that is not adversely affected during the plant life time. Aim of this paper is to provide the RCM framework to implement it on safety systems. RCM framework is described in four major steps.

  • PDF

Decision-making Method of Optimum Inspection Interval for Plant Maintenance by Genetic Algorithms (유전 알고리즘에 의한 플랜트 보전을 위한 최적검사기간 결정 방법론)

  • 서광규;서지한
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.1-8
    • /
    • 2003
  • The operation and management of a plant require proper accounting for the constraints coming from reliability requirements as well as from budget and resource considerations. Most of the mathematical methods to decide the inspection time interval for plant maintenance by reliability theory are too complicated to be solved. Moreover, the mathematical and theoretical models are not usually cases in the practical applications. In order to overcome these problems, we propose a new the decision-making method of optimal inspection interval to minimize the maintenance cost by reliability theory and genetic algorithm (GA). The most merit of the proposed method is to decide the inspection interval for a plant machine of which failure rate $\lambda$(t) conforms to any probability distribution. Therefore, this method is more practical. The efficiency of the proposed method is verified by comparing the results obtained by GA-based method with the inspection model haying regular time interval.

Selection of Maintenance Interval Based on RCM for a Coal Handling Equipment (신뢰도중심정비에 의한 석탄취급설비 정비주기선정)

  • Cho, Il-Yong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.37-42
    • /
    • 2013
  • Power plants have many components and equipment. It is difficult for operators to know the each equipment fails or what equipment fails. It is important to prevent failure in advance. Recently, outlook of maintenance tasks is changing from time based maintenance to condition based maintenance. In this study, we selected RCM-based maintenance intervals for coal handling equipment at coal power plant. For RCM analysis, we have made great progress in a maintenance task and interval. If we apply RCM analysis to the whole plant system, we can expect qualitative improvement and efficient operation of power plant system.

  • PDF

A Study on the Effects of Maintenance Schedule in a Competitive Electricity Market (경쟁시장에서 보수계획의 수익영향과 최적보수 방향)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.593-595
    • /
    • 2003
  • The introduction of electricity industry provides generators incentives to recover the related cost through the market. Hence, the generator should sell his/her electricity at high market-clearing price with optimal operation of his/her power plant. The maintenance of power plant is the most critical factor in affecting generators' decision-making. This paper analyzes technique for establishing maintenance schedule reflecting recovery cost and considers differences in monthly load pattern in minimizing LOLP.

  • PDF

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.

Tele-robotic Application for Nozzle Dam Maintenance Operation in Nuclear Power Plants

  • Seo, Yong-Chil;Kim, Chang-Hoi;Cho, Jae-Wan;Kim, Seung-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1520-1524
    • /
    • 2004
  • This paper describes the development of a robotic maintenance system for use in a maintenance operation of the nozzle dam in a water chamber of a steam generator at the Kori nuclear power plant in Korea. The robotic maintenance system was designed to minimize the personnel exposure to a hazardous radioactive environment. This robotic maintenance system is operated by a teleoperated control which was designed to perform the nozzle dam maintenance tasks in a remote manner without endangering the human workers. Specific maintenance tasks involve the transportation, insertion, and removal of nozzle dams in a water chamber inside a steam generator via a narrow man-way entrance port. The developed robotic maintenance system has two major subsystems: a two degrees of freedom guiding device acting as the main guiding arm and a master-slave manipulator with a kinematic dissimilarity. The mechanical design considerations, control system, and capabilities of the robotic maintenance system are presented. Finally, a graphical representation of the nozzle dam maintenance processes in a simulated work environment are also demonstrated.

  • PDF

A Development of Image Transfer Remote Maintenance Monitoring System for Hand Held Device (휴대용 화상전송 원격정비 감시시스템의 개발)

  • Kim, Dong-Wan;Park, Sung-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.276-284
    • /
    • 2009
  • In this paper, we develop the image transfer remote maintenance monitoring system for hand held device which can compensate defects of human mistake. The human mistakes always happen when the worker communicate information each other to check and maintenance the equipment of the power plant under bad circumstance such as small place and long distance in power plant. A worker couldn't converse with other when in noisy place like Power plant. So, we make some hand device for handy size and able to converse in noisy place. The developed system can have improvement of productivity through increasing plant operation time. And developed system is composed of advanced H/W(hard ware) system and S/W(soft ware)system. The H/W system consist of media server unit, communication equipment with hand held device, portable camera, mike and head set. The advanced s/w system consist of data base system, client pc(personal computer) real time monitoring system which has server GUI(graphic user interface) program, wireless monitoring program and wire ethernet communication program. The client GUI program is composed of total solution program as pc camera program, and phonetic conversation program etc.. We analyzed the required items and investigated applicable part in the image transfer remote maintenance monitoring system with hand held device. Also we investigated linkage of communication protocol for developed prototype, developed software tool of two-way communication and realtime recording skill of voice with image. We confirmed the efficiency by the field test in preventive maintenance of plant power.

Development of the Preventive Maintenance Template for Static Exciter in the Nuclear Power Plant (원자력발전소 정지형 여자기의 예방정비기준(PMT) 개발)

  • Chin, Soo-Hwan;Park, Jin-Youb;Hong, Young-Hee
    • Journal of Energy Engineering
    • /
    • v.20 no.2
    • /
    • pp.154-162
    • /
    • 2011
  • PMT(Preventive Maintenance Template) is a standardized maintenance program that describes maintenance items & period as operation condition to increase component reliability at the component level. The existing maintenance programs are focused on time based maintenance to inspect and repair component depend on fixed period. But recently, we have developed advanced maintenance program(named PMT) to increase reliability and optimize maintenance program of the plant significant component. This paper presents how to develop the PMT for nuclear power plant's static exciter.