• Title/Summary/Keyword: Plant Evaluation

Search Result 2,868, Processing Time 0.027 seconds

Development of Evaluation Model on Greenspace for Sustainability of Site-scale Development Projects (단지규모 개발사업의 지속가능성 확보를 위한 녹지 평가 모형 개발)

  • 양병이;이관규
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.2
    • /
    • pp.97-107
    • /
    • 2000
  • This study aims to develop the model of evaluation on greenspace to increase the sustain ability of the planning and management for site-scale development projects. The results of this study can be summarized as follows: (1) The comprehensive principles of sustainable development projects were established, which include coexistence of man and nature, reflection of ecological principles, minimization of environmental pollution and damage, recycling and reuse of materials. (2) According to established principles, the evaluation criteria were classified into seven categories as follows: retention of ample greenspace, formation of greenspace as a habitat, species diversity of vegetation, consideration of indigenous plants, construction of green network, conservation of greenspace, and reuse of plant materials. (3) As a result of the analysis of questionnaire of experts, evaluation model was worked out with which we can evaluate environmental friendliness greenspace. And, the final evaluation indicators for greenspace are the rate of greeneries volume, securing habitat, indigenous plants, reuse of plant materials, and species diversity of vegetation, and the indicator of greenspace conservation.

  • PDF

Consideration for Heat Exchanger Performance Evaluation with reduced spend fuel pool heat due to the long-term over-haul maintenance (장기 예방정비로 인한 사용후연료저장조 열원 감소가 열교환기 성능평가에 미치는 영향 고찰)

  • Park, Chan;Lee, Sung Ho
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.56-64
    • /
    • 2020
  • The safety related heat exchangers have been evaluated for their performance during the operation of the nuclear power plant. The evaluation program for the safety related heat exchanger was developed in 2010 and used by KHNP based on EPRI TR-10739 algorithms. The spend fuel pool heat exchanger is one of the safety related heat exchanger in the nuclear power plant and also evaluated for their performance. Recently the performance evaluation for the spend fuel pool heat exchanger was not available because of the decreased heat in the spend fuel pool due to the long term overhaul. This paper analyzes the main cause of evaluation failure in the evaluation process and suggests the criteria for the heat exchanger performance evaluation during the long term overhaul.

Configuration methodology and performance evaluation of distributed control systems (분산제어 시스템의 구성 방법 및 성능 평가)

  • 김평수;권욱현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.616-619
    • /
    • 1996
  • This paper presents the configuration methodology of Distributed Control System(DCS)s for process plant and their performance evaluation. Performance evaluation is specified both in terms of operational and installation aspects of system. In order to evaluate performance criteria of operational aspect, a simulation method is proposed. Modeling of system components including process computer, database, process controllers and LANs, etc, is implemented for simulation. Based on these characteristics, different system configurations are evaluated and compared through results about evaluation criteria in order to select the best DCS for particular process. The results, in abbreviated form, of the performance evaluation of DCS controlling a CAL(Continuous Annealing Line) plant of iron process are presented.

  • PDF

Strain-Based Structural Integrity Evaluation Methods for Nuclear Power Plant Piping under Beyond Design Basis Earthquake (설계기준초과지진 하의 원전 배관 구조건전성 평가를 위한 변형률 기반 방법)

  • Lee, Dae Young;Park, Heung Bae;Kim, Jin Weon;Ryu, Ho Wan;Kim, Yun-Jae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.2
    • /
    • pp.66-70
    • /
    • 2016
  • Following the 2011 Fukushima Nuclear Power Plant accident, the IAEA has issued a revised version of the Nuclear Safety Standard for beyond design basis earthquake to consider the core meltdown accident. In Korea, relevant laws and regulations were also revised to consider beyond design basis earthquake to nuclear components. In this paper, CAV, an seismic damage factor that determines the restart of nuclear power plant after operating breakdown earthquake, is proposed for extension to the beyond design basis earthquake. For pipings not satisfying the beyond design basis earthquake condition, several evaluation methods are suggested, such as strain-based evaluation methods, simple nonlinear analysis method and cumulative damage evaluation method.

A Study on Evaluation Standard for Revegetation Method through Monitoring of Vegetation on the Slope of Expressway (고속도로 비탈면 식생 모니터링을 통한 녹화공법 평가기준 연구)

  • Kim, Kyung-Hoon;Jeon, Gi-Seong;Hur, Young-Jin;Park, Jong-Chul;Joo, Baek;Kang, Dae-In
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.6
    • /
    • pp.57-73
    • /
    • 2020
  • A study was conducted to present the criteria for evaluating the revegetation method of the slope of the expressway. The results of comparative analysis between 2019-2020 field survey and existing research data (2015-2016) are as follows. Soil is a very important factor at the beginning of revegetation work. However, after the plant has settled, the importance of the soil composition diminishes. Among the plants used, the number of plants sown at the beginning gradually decreases. And it changes as it competes with invading plants. Among the plants used for sowing, it was found to affect the vegetation composition in the order of exotic grass > native herb and wildflower > native tree. Plant coverage is continuously evaluated as an important factor regardless of the time. The vegetation structure on the slope will change continuously over time. New items need to be evaluated in situations where a lot of time has elapsed since the application of revegetation work. It is desirable to use the current evaluation standard only to perform the evaluation within 1 to 2 years. In the long run, it is necessary to establish a new evaluation standard that adjusts the weights of each item.

Performance Evaluation Test for Applying the Mechanical Development of the High-Strength Reinforcing Bars to the Nuclear Power Plant Structures (고강도철근 기계적정착의 원전구조물 적용을 위한 성능평가실험)

  • Lee, Byung-Soo;Bang, Chang-Joon;Lim, Sang-Joon;Kim, Seok-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.197-198
    • /
    • 2012
  • If the mechanical development be applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the re-bar yield strength and diameter. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.

  • PDF

Performance Evaluation of the Samcheonpo Small-Hydro Power Plant (삼천포 해양소수력 성능평가)

  • Cho, Hong-Yeon;Cho, Beom-Jun;Kang, Geum-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.617-620
    • /
    • 2007
  • The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.

  • PDF