• Title/Summary/Keyword: Planning Management

Search Result 6,139, Processing Time 0.029 seconds

A Proposal of Rural Landscape Policy for Preservation, Formation and Management (농촌경관의 보전.형성.관리를 위한 정책제안 연구)

  • Joo, Shin-Ha
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.4
    • /
    • pp.77-86
    • /
    • 2008
  • The purpose of this study is to propose the policies for preservation, formation and management of Korean rural landscape. For this, the current rural landscape policies are examined and recent legislative changes are also surveyed. The Landscape Law and the Comprehensive Countermeasures for Rural Landscape Improvement are the most significant changes. The proposed issues are as follows: 1. the establishment of rural landscape planning system, 2. the arrangement of the criteria and guideline for rural landscape planning and design, 3. the re-arrangement of the rural landscape index and landscape map, 4. the survey and management of the rural landscape amenity, 5. the revitalization of the landscape projects for rural area, 6. the pragmatic connection with other law and system(especially the Landscape Law), 7. the education and cultivation of the rural landscape expert groups.

A Stochastic Pplanning Method for Semand-side Management Program based on Load Forecasting with the Volatility of Temperature (온도변동성을 고려한 전력수요예측 기반의 확률론적 수요관리량 추정 방법)

  • Wi, Young-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.6
    • /
    • pp.852-856
    • /
    • 2015
  • Demand side management (DSM) program has been frequently used for reducing the system peak load because it gives utilities and independent system operator (ISO) a convenient way to control and change amount of electric usage of end-use customer. Planning and operating methods are needed to efficiently manage a DSM program. This paper presents a planning method for DSM program. A planning method for DSM program should include an electric load forecasting, because this is the most important factor in determining how much to reduce electric load. In this paper, load forecasting with the temperature stochastic modeling and the sensitivity to temperature of the electric load is used for improving load forecasting accuracy. The proposed planning method can also estimate the required day, hour and total capacity of DSM program using Monte-Carlo simulation. The results of case studies are presented to show the effectiveness of the proposed planning method.

POSSIBLITIES AND LIMITATIONS OF THE APPLICATION OF POERATIONS RESEARCH TECHNIQUE TO REGIONAL PLANNING: WITH A CASE IN KOREA

  • Kim An-Jae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.1 no.1
    • /
    • pp.89-94
    • /
    • 1976
  • Many techniques have been applied to comprehensive regional planning through the processes of goal-building, research and analysis, plan-establishing, implementation-scheduling, and evaluation. Operations research(OR) is one of those techniques. OR has been developed in such fields of military operations, industrial engineering and business management during the last three decades in several developed western countries. It is a recent tendency for public administrators and researchers to be interested in OR for their scientific decision making. Therefore, we see that OR has not only a weak basis on, but a few practical applications to urban and regional planning. Such situation is worse in developing countries. This paper aims at investigating the possible basis and limitations or obstacles of OR application to public decision making, especially regional planning. A practical example of OR application to regional planning in Korea and its evaluation will be introduced.

  • PDF

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

An Application of QFD to the Development of Full Automatic Temperature Controller (QFD를 적용한 전자동 온도조절장치 개발사례 연구)

  • 이기룡;박병춘
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.1
    • /
    • pp.61-73
    • /
    • 2002
  • The Quality Function Deployment(QFD) is a Quality Management technique to maximize customers' satisfaction by reflecting customer requirements into all business processes, including concept definition, product planning, parts planning, process planning, production planning, and sales planning. The basic concept of the QFD is to translate customers' requirements appropriately into engineering characteristics, into parts characteristics, into process characteristics, and into specific requirements and activities in production. In this study, we reviewed and analyzed the application process of the QFD to the development of A2 FATC (Full Automatic Temperature Controller), an automotive component developed and produced by company A. It has been reported that by applying the QFD to the development of A2 FATC, company A. achieved 34% improvement in control robustness quality characteristic, 27% improvement in deviation quality characteristic, and 30% improvement in overall quality characteristics.

Effective Demand Selection Scheme for Satisfying Target Service Level in a Supply Chain (공급망의 목표 서비스 수준 만족을 위한 효과적인 수요선택 방안)

  • Park, Gi-Tae;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.205-211
    • /
    • 2009
  • In reality, distribution planning for a supply chain is established using a certain probabilistic distribution estimated by forecasting. However, in general, the demands used for an actual distribution planning are of deterministic value, a single value for each of periods. Because of this reason the final result of a planning has to be a single value for each period. Unfortunately, it is very difficult to estimate a single value due to the inherent uncertainty in the probabilistic distribution of customer demand. The issue addressed in this paper is the selection of single demand value among of the distributed demand estimations for a period to be used in the distribution planning. This paper proposes an efficient demand selection scheme for minimizing total inventory costs while satisfying target service level under the various experimental conditions.

Production planning in fish farm (어류양식장 생산계획에 관한 연구)

  • EH, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.3
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

Formal integration of process planning and shop floor control with petri nets

  • Lee, Kyung-Huy
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.619-622
    • /
    • 1996
  • This paper presents the formal integration of process planning and shop floor control with Petri net formalism. Formal integration means that both planning and control problems can be modeled, interfaced, and transformed with the Petri net formalism. This integrated framework provides a systematic approach for rapidly developing a formal shop floor controller from process planning with respect to shop floor configuration.

  • PDF