A Control Account Planning Using Material Requirement Planning in Earned Value Project

MRP기법을 이용한 EV프로젝트의 관리계정계획

  • Published : 2002.12.01

Abstract

Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

EVMS(Earned Value Management System)는 최근 건설 프로젝트를 관리하는데 매우 유용한 도구로 인식되고 있으며, 정부차원에서 적극적으로 도입을 검토하고 있는 선진 관리기법이다. 이 EVMS는 미국방성에 의해 1960년대부터 프로젝트의 효율적인 관리를 위해 개발된 C/SCSC(Cost/schedule Control System Criteria)에 기반을 두고 있으며, 국내외에서 정부발주공사뿐만 아니라 민간발주의 건설프로젝트를 관리하는 도구로 활용하기 위해 연구가 활발하게 진행되고 있다. 본 연구에서는 공정관리 프로그램과 복합작업모델(Work Package Model)을 바탕으로 건설프로젝트의 EV계획단계의 관리계정계획(CAP)을 수립하는데 효과적으로 사용할 수 있는 방안을 제조업의 재고관리모형중의 한 형태로 조립제품의 자원운영계획을 수립하는데 우수한 기법으로 알려진 MRP(Material Requirement Planning)기법을 활용하여 제시하고자 한다.

Keywords

References

  1. 건설교통부, '건설사업관리업무지침', 2001
  2. 건설교통부, '건축공사 . 기계설비공사 수량산출기준', 2000
  3. 강성수외 공역, '생산시스템 운영관리' 사이텍미디어, 2001
  4. 김양택, 현창택, 'Work Packaging Model의 개선을 통한 공정 - 공사비 통합모텔구축' 건설관리학회지 한국건설관리학회, 제1권 제4호, 2000, pp.82-90
  5. 김선규, 김재준, 'EVMS 최종공사비 예측 모델 최적성과 지수에 대한고찰', 건설관리학회지 한국건설관리학회, 제1권 제3호(통권 제3호), 2000, pp.101-107
  6. 이명호, 유지수 '경쟁우위확보를 위한 생산관리' 박영사, 1999
  7. 이유섭, '건설공사 EVMS적용방안', 한국건설기술연구원, 2001
  8. 정남기, 유철수, 'CALS 시대 생산관리', 청문각, 1998
  9. 최윤기, '일정과 비용을 통합한 건설공사 진도율 산정 시스템' 박사학위논문, 서울대학교, 1999
  10. Ahuja, Hira N. and Dozzi, S. M. Abourizk, 'Project Management' (2nd), JOHN WILEY & SONS, INC. 1994
  11. Christensen, David S., 'Using The Earned Value Cost Management Report to Evaluate the Contractor's Estimate at Completion, Acquisition Review Quarterly, pp.283-291, 1999
  12. Christensen, David S., 'Determining an Accurate Estimate at Completion', National Contract Management Journal 25: 17-25, 1993
  13. CII, 'Work Packaging For Project Control', Construction Industry Institute(CII), The University of Texas at Austin, 1997
  14. EIA Engineering Dep, 'Earned Value Management Systems (ANSI/EIA-748)', EIA(Electronic Industries Alliance), 1998
  15. Fleming, Quentin W. and Koppelman, Joel M., 'Earned Value Project Management', Project Management Institute, 2000
  16. PMBOK, 'A Guide to the Project Management Body of Knowledge', Project Management Institute, 2000
  17. Primavera Korea, 'P3 Manual', Primavera, 2000
  18. http://www.acq.osd.mil/pm/. EVM Official Web site
  19. http://www.dmo.defence.gov.au/esd/evm/index.cfm. EarnedValue Web Site for Australia
  20. http://www.suu.edu/faculty/christensend/evbib.html. Comprehensive Bibliography of EV Articles