• 제목/요약/키워드: Planning Hierarchy

검색결과 349건 처리시간 0.028초

전라남도 중소도시의 공간계획 관리 방안 연구 (A Study on Spatial Planning Management Methods in Small and Medium Cities in Jeollanam-do)

  • 한다혁;이민석
    • 한국농촌건축학회논문집
    • /
    • 제23권4호
    • /
    • pp.55-62
    • /
    • 2021
  • This study conducted a management system and business analysis related to urban and architecture in local small and medium cities. The current status of the management department of the master plans, which were established based on the laws related to the spatial environment and implemented projects based on them, was analyzed, and the problems were derived. The basic urban master plan of the local government is classified as a hierarchical higher plan than other plans established within the same city, but there was a problem in that the timing of each plan was different. As a problem, the contents of the sub-plan were not included in the upper plan, or the opposite phenomenon occurred. In addition, the management entity of the master plan and sub-projects was different. To solve this problem, it is necessary to form a consistent structure of systematic planning and management subjects. In addition, in the future planning stage, it is necessary to establish a master plan establishment system according to hierarchies. This study is meaningful in that it can be used to establish a master plan establishment system according to hierarchy in the future planning stage and to establish the same management entity as the master plan in the projects stage.

Smalltalk 패러다임을 이용한 객체지향 시뮬레이션기반 전문가시스템 (Object-Oriented Simulation-Based Expert System Using a Smalltalk Paradigm)

  • 김선욱;양문희
    • 산업경영시스템학회지
    • /
    • 제24권66호
    • /
    • pp.1-10
    • /
    • 2001
  • Simulation-Based Expert System(SIMBES) is a very effective tool to solve complex antral hard problems. The SIMBES model includes a simulator, a feature extractor, a machine learning system, a performance evaluator, and a Knowledge-Based Expert System(KBES). Since SIMBES depends on Problem domains, a schedule-based material requirements planning problem, which is NP-hard, was selected to exemplify the SIMBES model. To implement the SIMBES application in Smalltalk paradigm, a system class hierarchy was constructed. The hierarchy consists of five large classes such as Job Generator, Job Scheduler, Job Evaluator, Inference Engine, and Executive System. Several classes inside these classes were identified. Additionally, instance protocols about all classes have been described in terms of messages and pseudo methods. These protocols can be implemented easily by any other object-oriented languages. Furthermore, these results may be used as a skeletal system to develop a new SIMBES efficiently, especially when the application is related to other scheduling problems.

  • PDF

AHP를 활용한 문화.관광웹 사이트 평가 (Web site Evaluation of Culture and Tourism using AHP method)

  • 김민철
    • 한국정보통신학회논문지
    • /
    • 제13권9호
    • /
    • pp.1737-1744
    • /
    • 2009
  • 본 연구에서는 3C_D_T 웹사이트 평가모델의 항목 구성을 접목시켜, 현재 운영되고 있는 J지역 내 문화 관광 웹 사이트 평가 요소들에 대하여 중요하게 생각하는 상대적인 중요도를 계층적 분석과정(AHP: analytic hierarchy process)을 적용하여 네티즌들이 우선적으로 고려하는 평가요소들의 상대적인 비중과 우선순위를 산출하였다. 분석 결과, 콘텐츠(Contents) 요인이 가장 중요한 요소로 나타났으며, 민감도 분석 등을 추가로 실시하여 개선 방안에 대해 제시하였다.

도시공원 조성의 우선순위 결정에 있어서 계층분석과정 기법의 적용 (Application of Analytic hierarchy Process to decide the priority of undeveloped neighborhood park)

  • 박문호
    • 한국조경학회지
    • /
    • 제24권1호
    • /
    • pp.42-54
    • /
    • 1996
  • Many of urban parks which have been designated for urban planning regulation are not well developed because the priority of investment is inferior to that of other public facilities. Park development is an urgent urban policy and it is hard to decide priority among parks. Therefore, it is necessary to evaluate the priority of park development. Thus the Analytic Hierarchy Process has been introduced because it is suitable for achieving objectivity by collecting the professional opinions. The goals of park development are evaluated by AHP method and the priorities among goals are conservation of natural environment, satisfying the residents' residents' needs, population density, regional pollution, land acquisition cost, ratio of greeneries and facilities within park areas. Priority of park development is decided by the standardization of each individual inventory data and considering of the professional opinions. Among the multi-attribute judgement methods, AHP method may be the most widely used. Despite the critical evaluations of the AHP, such as limitation of the nine-point scale and the rank reversal problem, application of AHP to decide the priority of park development is suitable for actual circumstances.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

페트리넷을 이용한 자율 이동로봇의 운용 (Operation Method For AMR(Autonomous Mobile Robot) Using Petri Net)

  • 이석주;이병주;박귀태
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.400-400
    • /
    • 2000
  • This paper purposed that verify the validity of Petri Net method for control progressive increase of system complexity, before extend the realized single robot system to multi-robot system. An autonomous mobile robot(AMR) needs decision making, motion control, path planning, tracking a path, obstacle avoidance, and sensor fusion, to complete its task. An AMR integrates and operates these technics through a consistent command system. An error in a command hierarchy which is like duplication or omission of a control command hierarchy for each module results in serious problems. This paper minimizes the error by modeling each module and whole system using Petri Net graphical representation and applies it to the exploration task of an AMR

  • PDF

대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구 (A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures)

  • 김대길;홍주영;이명도;엄진업;김대원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

AHP를 이용한 산업안전 교과목 선정에 대한 연구 (An Selection of Occupational Safety Curriculum using Analytic Hierarchy Process)

  • 김유창
    • 산업경영시스템학회지
    • /
    • 제24권69호
    • /
    • pp.87-92
    • /
    • 2001
  • A significant number of all reported accidents in Korea involved education and training Based on the Labor Ministry data, statistics, show the education cause was directly involved in 38% of major accidents, Since safety managers have in charge of safety education at the factory, occupational safety curriculum must be studied to train safety manager effectively. In this study an analysis on relative importance of industrial safety curriculum for a good safety manager was performed by Analytic Hierarchy Process(AHP) The results showed that relative importance of industrial safety curriculum by AHP was safety management(w=0.240) ergonomics and system safety(w=0.201) construction safety(w=0.182) mechanic safety(w=0.139) electronic safety(w=0.134) and chemical safety(w=0.104) in order. The results could be used for industrial safety curriculum planning in university and safety organization such as Korea Occupational safety and Health Agency.

  • PDF

안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발 (Development of Construction Process Safety Information Management System for Safety Accident Prevention)

  • 전현정;양광모;강경식
    • 대한안전경영과학회지
    • /
    • 제7권1호
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

지능형 전기품질 평가모델 개발 (Development of Intelligence Electric Power Quality Assessment Model)

  • 이범;최남섭;김경민
    • 제어로봇시스템학회논문지
    • /
    • 제13권6호
    • /
    • pp.531-536
    • /
    • 2007
  • This paper presents a power quality assessment model based on the Analytic hierarchy process. This model can assess unified power quality index which provide an overall performance of the distribution system. To obtain the unified power quality index, we propose the use of the AHP model which has three states: [Ideal]-[Actual]-[Worst]. The proposed method is especially useful and effective for planning. We have applied the proposed method to an actual relatively large system, and verified the usefulness.