• 제목/요약/키워드: Planned Maintenance

검색결과 184건 처리시간 0.028초

체계중심병원설계를 위한 공조실 면적 계획에 관한 연구 (A Study on Area Planning of Air Conditioning Room for Hospital Design Focused on System)

  • 김은석;양내원
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제25권4호
    • /
    • pp.27-35
    • /
    • 2019
  • Purpose: As the improvement in quality of medical environment and the spatial consideration for the prevention of infection in the hospital have become increasingly important in the recent years, specific and practical planning for air conditioning room's area has become a major issue accordingly. However, the air conditioning room tends to be discussed focusing on technical factors such as air conditioning systems that are irrelevant to building plans, while discussions of most departments related to the medical functions have actively taken placed. Therefore, this study aims to investigate the factors influencing the planning for the air conditioning room area, and through subsequent analysis of the area of the air conditioning room, to propose a way to improve effective planning for the air conditioning room area. Methods: This study examines the case hospitals that fall into two types: each floor supply system and concentrated supply system, and compares and analyzes the air conditioning room area-related factors and the characteristics of changes in the interior of air conditioning room before and after remodeling through air conditioning floor plan of those case hospitals. Results: The air conditioning room can be classified into the net area of the functional space such as duct passages, and the public area such as aisle space, and of those the public area is an important factor in calculating the area of the air conditioning room. The public area of the air-conditioning room should not be planned considering only the spaces for mobile passage or maintenance activities, but should be planned taking into account internal changes such as expansion and replacement of equipment in the future from the beginning. Implications: When planning a medical facility, it is used as basic data for the planning of the air conditioning room area, which is a significant fixed factor in the initial setting.

일본(日本)에서 계류변(溪流邊)의 환경복원(環境復元) 발전전략(發展戰略)(IV) (Strategy Prospects of Environmental Restoration of Stream Side in Japan(IV))

  • 박재현;우보명;이헌호
    • 한국환경복원기술학회지
    • /
    • 제3권4호
    • /
    • pp.84-90
    • /
    • 2000
  • The objective of this study was to introduce the current status and development strategy for an environmental restoration of stream side in Japan, and to consider a methodology which could be effectively applied for the environmental restoration of stream side in Korea. 1. In order to change the recent direction of the forest conservation and erosion control projects which are focused on the restoration of stream side ecology, we have to quit the past erosion control policy such as water control purpose, and establish new plans regarding on the forest conservation and erosion control which is considered the regional environmental restoration of watershed. 2. When we restore stream side and river side ecosystem, we should establish restoration plans which can keep the original nature of stream and river. 3. The forest conservation and erosion control construction projects for the restoration of stream and river ecosystem should be planned for the perfect restoration of their ecosystem by way of sustainable maintenance and management. 4. The restoration direction of stream and river ecosystem needs to be planned to restore the diversity of small geographies such as waterway, shoal and puddles rather than flattening of stream bed. 5. The main principle in the restoration of stream and river ecosystem is to accomplish forest conservation and erosion control construction projects which can conserve the existing stream and river ecosystem.

  • PDF

RTK-GPS 측량에 의한 해상파일 시공관리에 관한 연구 (A Study on Marine Pile Construction Management by Real-Time Kinematic GPS Positioning)

  • 강길선
    • 한국측량학회지
    • /
    • 제21권4호
    • /
    • pp.393-401
    • /
    • 2003
  • 해상파일 항타 공사를 위한 자동제어 기술은 해상에서 파일을 설계 도서상의 위치 좌표에 신속하고 정확하게 시방기준의 기울기와 방위로 항타 관입하여 시공품질 달성 및 시공 유지관리의 편리함을 제공할 수 있다. 따라서 본 연구에서는 해상 파일 항타를 위한 위치 자동제어에 RTK GPS 측량기법으로 정밀시공을 요구하는 파일을 이용한 해상구조물에 적용하여 해상준설공사, 파일 시설물 등의 해상 정밀시공관리 분야에 적용할 수 있는 3차원위치정확도를 결정함으로써 해상시공관리를 위한 보다 경제성 있는 RTK GPS 측량의 활용 방향을 제시하고자 하였다. 실시간 측정 정확도가 4cm 이내로 해상위치를 측정할 수 있으므로 시방기준에 비해 시공오차를 60% 감소시킬 수 있었고, GPS에 의한 해상 자동 위치제어 기술을 적용한 결과 해상공사 기간을 기존 공법 대비 30%를 단축하고, 해상공사 비용을 35% 절감할 수 있었다.

우리나라 대형 종합병원의 아웃소싱 실태 (Outsourcing in Hospital Services: Experience of Korean Hospitals)

  • 노태훈;이해종;박은철;강혜영
    • 한국병원경영학회지
    • /
    • 제8권4호
    • /
    • pp.59-75
    • /
    • 2003
  • This study was conducted to investigate the degree of utilization of outsourcing in large hospitals in Korea. We also investigated the outcome and the level of satisfaction for adopting outsourcing in these hospitals. Types of work areas that were currently operated by outsourcing and were planned to adopt outsourcing in the future were identified. A total of 83 hospitals were eligible for this study, which had more than 500 beds, and were identified from the 2003 National Hospital List published by the Korean Hospital Association. A self-administered Questionnaire survey was conducted between April 25th and May 20th in 2003 with a personnel being charged of arrangement of outsourcing in each hospital. Among the 58 hospitals responding the survey(response rate=69.9%), 49 hospitals(84.5%) utilized outsourcing in at least one work field in their organizations. The largest proportion of the hospitals(85.7%) using outsourcing responded that the biggest outcome after introducing outsourcing were cost reduction(49.0%), followed by improved efficiency in operating the organization or human resources(34.7%) and the improved quality of the work(6.1%). The degree of satisfaction for outsourcing among the hospital managers(3.43) was significantly higher than that among the employees(3.l4) on a S-point Likert-type scale(p<0.05). Among the 7 work areas, the hospitals used outsourcing most frequently in facility management(housekeeping, building maintenance, hospital security and parking management), followed by non-medical profit business(funeral, convenient store, and cafeteria), logistics(provision of patient meal, in-house delivery, and purchasing), and information and computing system(hospital information system, maintenance of personal computers and printers). The work areas that the hospitals planned to adopt or expand the outsourcing in the future most frequently were facility management, non-medical profit business, logistics, and information and computing systems. In conclusion, outsourcing was highly diffused in large Korean hospitals, particularly in the work field of facility management and non-medical profit business. The satisfaction for outsourcing was not high yet in Korean hospitals.

  • PDF

건설구조물(建設構造物)의 장수명화(長壽命化)와 건설폐기물(建設廢棄物)의 유효이용기술(有效利用技術) (Long- Term Durability of Construction Structure and Effective Use of Technology for Construction Waste)

  • 김규용;최형길;남정수;송하영;이도헌
    • 자원리싸이클링
    • /
    • 제18권3호
    • /
    • pp.11-19
    • /
    • 2009
  • 최근 지구환경의 문제가 사회적 이슈로 부각됨에 따라 자원절약 및 자원의 유효이용이라는 측면에서 일상생활에서부터 각종 산업분야에 이르기까지 재활용과 자원절약에 관한 관심이 날로 심화되고 있는 가운데 지구 온난화 방지, 자연환경파괴의 방지, 폐기물에 의한 환경오염 방지 등 지구환경보전 측면에서 콘크리트용 골재 자원의 고갈, 시멘트 소성에너지, $CO_2$ 저감 등은 해결이 불가피한 문제로서의 당면한 과제이다. 이에 따라 건설 산업의 분야에 있어서도 건축물의 내부에 축적되어 있는 막대한 양의 자원을 유효하게 활용하고 내구수명이 길게 설계된 장수명화 건축물을 안전하고 쾌적하게 유지 관리함으로써 불필요한 건설행위를 억제하여 지구자원 및 에너지를 절감하는 창조적인 사고가 필요하다고 할 수 있다. 본고에서는 건설폐기물 발생 억제 및 유한한 지구자원의 유효이용과 재활용을 활성화시킴으로서 지구환경부하 저감을 위한 건축생산 및 건축물의 성능설계 측면에서 건축적 요구와 지구환경을 고려한 건축물의 장수명화를 위한 방법 및 건설폐기물의 유효이용기술에 대해 소개하였다.

SFRC 중공 부재의 실험 및 유한요소 해석에 의한 전단강도 평가 (Evaluation of Shear Strength by Experiment and Finite Element Analysis of SFRC Hollow Members)

  • 김성은;정재원;김승훈
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제23권4호
    • /
    • pp.78-85
    • /
    • 2019
  • 본 연구는 전단력과 휨을 받는 춤이 작은 중공 SFRC 부재를 대상으로 중공에 따른 웨브폭이 부재의 전단강도에 미치는 영향을 평가하고자 실험 및 해석을 실시하고 기존식과 비교 분석하였다. 전체폭에 비하여 웨브폭은 1/2배, 2/3배로 선정하였으며, 전단경간비는 1.5로 계획하였다. 전단실험 결과, 웨브폭이 33% 증가함에 따라 최대전단강도는 10.3~28.0% 증가하였다. 실험체의 전체춤이 1.5배 증가함에 웨브폭이 100mm인 실험체는 전단강도가 29.2% 증가한 반면, 150mm인 실험체는 11.3% 증가에 그쳐, 웨브폭이 적을수록 춤의 증가에 따른 전단강도 증가율이 큰 것으로 나타났다. 이를 볼 때, 웨브폭이 적을수록 강섬유의 기여도가 큰 것으로 사료된다. KCI 기준식이 중공 슬래브의 전단강도를 매우 안전측으로 평가하고 있으며, Shin et al.의 제안식이 실험강도를 비교적 잘 예측하는 것으로 나타났다. 비선형 유한요소 해석으로부터 웨브폭이 2, 3, 6배 증가함에 따라 해석부재의 평균 전단강도는 각각 1.18배, 1.80배, 2.19배로 나타나, 웨브폭의 증가에 비례하여 전단강도가 증가하지 않는 것으로 나타났다.

여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구 (A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel)

  • 양주경;김효정
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제21권5호
    • /
    • pp.101-107
    • /
    • 2017
  • 터널공사의 발파공법의 특성상 여굴 발생은 필연적이라고 할 수 있다. 국내 터널 여굴 관련 설계기준에 의하면 공동구 바닥부의 여굴처리는 채움 10 cm로 되어 있으나 설계 여굴량 이상의 깊이를 모두 콘크리트로 채우게 되면 공사비가 크게 증가한다. 철도터널은 항구적인 콘크리트 궤도를 적용 중에 있다. 그러나 철도터널에서 바닥 여굴이 발생할 경우 압축강도 18 MPa의 콘크리트 채움 시공(T=100 mm)을 하고 있고, 상부에 150 mm ~ 237 mm의 보조도상 콘크리트층, 240 mm 콘크리트 궤도(TCL층)를 시공하는 등의 레일 하부와 터널 암반 사이에 약 600 mm 두께의 콘크리트로 시공하고 있어 경제성이 매우 떨어지는 실정이다. 이 연구에서는 기존터널단면과 변경터널단면에 대해 각각 여굴 깊이에 따라 콘크리트 균열 수치해석 및 콘크리트 균열 위험도 분석, 콘크리트 균열 안정성 확보를 위한 터널 바닥콘크리트 소요 두께에 대한 적정성을 평가하였다.

TPM활동에 있어서 기업성과에 영향을 미치는 매개변수의 효과에 관한 연구 (A Studies on the Effect of the Mediating Variable Affecting the Business Performance in the TPM Activity)

  • 연경화
    • 한국융합학회논문지
    • /
    • 제7권1호
    • /
    • pp.197-203
    • /
    • 2016
  • 본 연구에서는 AHP 분석의 결과로 도출된 TPM의 스텝활동 중 가장 중요한 활동들과 기업성과와의 관계를 모형으로 구축한다. 그리고 이러한 스텝활동들이 매개변수를 통해 기업성과에 영향을 미치는지를 융합적 관점에서 분석하고자 하였다. 4개의 스텝활동인 현장불합리 및 로스개선, 준비 및 5S 활동 기본조건 체계구축, 초기청소, 설비효율의 로스분석을 독립변수로 선정하고 TPM 활동수준을 매개변수로 하여 종속변수인 기업성과에 어떠한 영향을 미치는가를 분석하였다. 분석결과 4개의 스텝활동들은 기업성과에 직접 효과를 나타내고 있지는 않지만, TPM 활동수준이 매개변수로 투입된 경우에는 기업성과에 영향을 미치는 완전매개효과를 갖는 것으로 나타났다. 즉, TPM 활동수준은 매개변수로서의 역할을 하는 것으로 나타났다. 따라서 TPM에 참여한 사람들의 설비에 대한 자신감, 자기계발의 의식, 개인 업무에 대한 명확한 관리 등에 대한 인식수준이 높을수록 TPM활동은 성공적으로 기업의 성과에 공헌할 수 있는 것으로 해석할 수 있다.

나팔형 여수로를 가진 기존댐의 수리·수문학적 안전성평가에 관한 연구 (A Study on Evaluation for Hydraulic and Hydrologic Safety of an Existing Dam with Morning Glory Spillway)

  • 신은우;김경덕
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.269-278
    • /
    • 2004
  • 본 연구에서는 절대적인 안전성이 요구되는 댐의 홍수방어능력을 확보하기 위해서 나팔형 여수로를 가진 기존댐에 대한 수리 수문학적 안전성을 평가하였다. 검토결과 현재의 설계홍수량인 520cms(EL. 170.30m)에 대해서는 홍수소통과 연직관의 부압발생의 문제가 없는 것으로 나타났으나, 오리피스 흐름으로 변환되는 EL. 170.70m를 초과하는 방류에는 한계가 있는 것으로 나타났으며, 웨어의 정점 부근에서 부압발생의 가능성이 있는 것으로 판단된다. 여유고를 고려한 댐최고수위는 EL. 170.5m를 넘지 않아야 하는데, 금번 저수지 홍수추적 결과 댐최고수위 EL. 172.46m로 약 2m 상회하는 것으로 나타나 이에 대한 근본적인 대책이 필요하다고 판단된다.

폭염재난에 대응하는 Cooling Center 시설 및 운영기준에 관한 연구 (A Study on the Cooling Center Manual of Facility and Maintenance for Extreme Heat Disaster)

  • 김진욱
    • 한국방재학회 논문집
    • /
    • 제8권4호
    • /
    • pp.17-22
    • /
    • 2008
  • 폭염을 포함한 기후변화에 의한 사망자가 2000년의 경우 15만 명에 달하였으며 외부환경 변화에 대응하는 인간은 자연적인 체온 조절기능이 감소되고 냉난방기에 의한 인공적인 환경조절 의존도가 높아지고 있다. 자연재해로서의 폭염에 대한 대응책으로서 우리나라에서도 2007년부터 폭염지수를 예보하고 이에 따른 폭염경보를 발령하고 있으며 각종 산업현장에서도 이에 대한 대응방안을 마련하고 있다. 그러나 결국 이러한 폭염재해대책은 소극적인 방법으로 시민 개개인에게 최종적인 폭염대응을 책임지게 하고 있는 것이다. 이를 보완하기 위해서 보다 체계적이고 능동적인 폭염 대응 시스템의 구축이 필요한 것으로 사료된다. 본 연구에서는 이러한 폭염의 대응방법으로서 쿨링센터의 체계적인 설치와 운영에 대한 대안을 제시하고자 한다. 특히 쿨링센터가 단순한 대피처로서의 역할이 아니라 폭염재난에 있어서 긴급재난통제소와 같은 역할을 수행하는 것을 제안한다.