The purpose of this study is to reduce the number of employees hired by Seoul Metropolitan Subway Corporation(SMSC) as a way of responding to deteriorating financial deficit problem. For the reduction, the personnel structure of Seoul Metro Rapid Transit Subway(SMRTS) newly founded in 1995 is benchmarked. Several assumptions are set for seeking the persuasive alternative; 1) no compulsory reduction of existing personnel, 2) raising the salary of SMSC to the same level of SMRTS for compensating intensified work burden, 3) hiring new employees to the amount of one-third of the reduced workforce for minimizing the problems associated with the reduction. The study suggests that the personnel reduction in relevant parts be planned in the following ways; 1) passenger transport part: from daily 3 shifts of 4 group to 2 shifts of 3 group, 2) fleet inspection, civil d: electric engineering, railtrack maintenance, signal parts: from 12 day-off to 10day-off, 3) architecture, AFC parts: from 2 shifts of 3 group to daily work, 4) fleet maintenance, architecture parts: expanding out-sourcing & automation, and 5) headquarter part: 10% reduction of the total of office workers. The study finds, by implementing the plan, that 1,270 employee can be reduced, and that aggregate 106.8 billion won will be saved for the next 10 years.
Journal of the Korea institute for structural maintenance and inspection
/
v.12
no.5
/
pp.152-160
/
2008
Since wall system apartment used the shear wall as main lateral resistance member, installation of openings which causing section loss of walls may cause significant problem to structure. Also, there are few studies for inducing coupling beam or slabs which are occurred by installing openings. Therefore, this study planned isolated 2-story shear walls which are reduced three half-scale specimen to find out walls behavior characteristic. The test results showed that strength reduction caused by loss of effective section of walls and different result of stiffness and energy dissipation regarding to the coupling beam and coupling slabs.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.2
/
pp.420-425
/
2010
In the process of warm forging, billet is heated up to $800^{\circ}C$ and located in the upper part of die block impression. The scattered oxidized scale may cause workers burn and shortening of die life sticking to the die block impression. The separating materials sprayed in die block cause harmful dust, harmful mist, fume, and bad odor which contaminate workshop environment. The process is classified as one of the avoided jobs and make the planned output achievement difficult. Development of an elimination device to clear out the contaminating materials in the workshop and improvement of the unsatisfactory maintenance method to fix the abrasion of die block impression which delays the dead line, cost increases needs to be developed. In this research, I tried to solve the problems caused in warm forging of bronze pipe joint such as the billet heating process, die maintenance, and manufacturing cost through improvement of warming forging manufacturing method and die maintenance method and eliminating harmful gas which will make the workshop more environment friendly.
Due to the global climate change, Korean peninsula is has been experiencing flooding and drought severely. It is hard difficult to manage water resources sustainably, because due to intensive precipitation in short periods and severe drought has increased in Korea. Reused water from the wastewater treatment plant (WWTP) could be a sustainable and an alternative water source near the urban areas. In order to understand the patterns of water reuse in Korea, annual water reuses data according to the times and regional governments were investigated from 2008 to 2019. The reused water from WWTP in Korea has been mainly used for river maintenance flow and industrial use, while agricultural use of water reuse has decreased with time. Metropolitan cities in Korea such as Seoul, Busan, Daegu, Ulsan, and Incheon have been mainly used reused reusing water for river maintenance flow. Industrial water reuse has been limitedly applied recently for the planned industrial districts in Pohang, Gumi, Paju, and Asan. By using the collected annual water reuse data from the domestic sewerage statistics of sewerage, the optimistic and pessimistic future estimations of for future annual water reuse were suggested from 2020 to 2040 on a five year interval for every five years.
Seoul Metropolitan Government has performed alternative transit system, light rail transit(LRT), for settling the problems of urban public transit system based on conventional bus service and heavy rail transit(HRT). LRT projects of total 8 lines(about 73.6km), including Ui-Sinseol line, have been planned as Build-Transfer-Operate(BTO) projects. For the first LRT, Ui-Sinseol line, however, design of structure had met standard for design of HRT, because of no domestic design code for LRT when participates of Ui-Sinseol project submitted the design proposal. This case study reports a successful example of LRT design minimizing the scale of stations designed in base of HRT code. The problems, like oversized structures compared with LRT vehicles, excessive costs for construction, had been resolved through negotiations with the participates of Ui-Sinseol line. Result suggests that present and future costs for construction and maintenance of the LRT projects in Seoul be considerably reduced in advance.
To cut down the maintenance expenses at branch lines, the foreign developed countries have developed the low-cost signalling on low-density lines. These examples are FFB(FunkFahrBetrieb) Radio based train operation by German railways(Deutsche Bahn AG), ERTMS REGIONAL by Europe and LOCOPROL system using a GPS. Also, Korea is developing Information and Communication Technology based low-cost signalling on low-density lines. The characteristics of this system are directly controled switch and crossing by driver. For the purpose of this paper, we reviewed the business process for switch and crossing control. Specially, we compared and analysed both methods whether the driver takes control over the operation procedures of switch or the control message is carried by the command of the controller. And by utilizing the instrument of UML, I planned the switch according to the control authority and the operation procedures needed for the control of crossing.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.117-124
/
2000
This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.
In this study, artificial neural networks were used to determine the intensity of brightness in interior spaces. The illumination elements to illuminate indoor spaces were considered, not individually, but as a system. So, during the planned maintenance periods of an illumination system, after its design and installation, simple brightness level measurements must be taken. For a three-dimensional evaluation of the brightness level in indoor spaces in a speedy and accurate manner, the obtained brightness level measurement results and artificial neural network model were used. Upon estimation of the most suitable brightness level for indoor spaces by using the artificial neutral network model, the energy demands required by the illumination elements decreased. Consequently, in this study, with estimations of brightness levels, the extent to which the artificial neutral networks become successful was observed and more correct results have been obtained in terms of both economy and usage.
Preventive maintenance can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. so, it is necessary to perform reliability analysis on the systems in which reliability is essential. In this paper, FMECA assessment adopted using real historical failure data in Korean power plants for apply RCM analytical method. The stochastic FMECA is an engineering analysis and a core activity performed by reliability engineers to review the effects of probable failure modes of generating unit and assemblies of the power system on system performance. Optimal RCM schedule which is considered the severity level of each generating unit and failure probability from failure prediction of generating unit can be planned using proposed FMECA with IOE index.
Odontogenic anomalies can occur as a result of conjoining defects. These include fusion, gemination and concrescence. The presence of fused teeth can lead to various clinical problems, including the aplasia of permanent successor, the supernumerary teeth and delayed eruption of permanent teeth. In general, the supernumerary teeth associated with fusion is mainly found in the maxillary anterior region. This report describes rare cases of supernumerary tooth associated with fused teeth of mandibular primary lateral incisor and canine. In the first case, fused teeth was extracted. The supernumerary teeth was erupted at canine space. The second case is still being observed. Extraction of fused teeth and observation of supernumerary teeth is planned.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.