• Title/Summary/Keyword: Plan Flood Line Spatial Analysis

Search Result 2, Processing Time 0.015 seconds

Utilization Plan Research of High Resolution Images for Efficient River Zone Management (효율적 하천구역관리를 위한 고해상 영상의 활용 방안 연구)

  • Park, Hyeon-Cheol;Kim, Hyoung-Sub;Jo, Yun-Won;Jo, Myung-Hee
    • Korean Journal of Remote Sensing
    • /
    • v.24 no.2
    • /
    • pp.205-211
    • /
    • 2008
  • The river management in Korea had been focused on line based 2D spatial data for the developing river management application system. In this study, the polygon based 3D spatial data such as aerial photos and satellite images were selected and used through comparing their resolution levels for the river environment management. In addition, 1m detailed DEM (Digital Elevation Model) was constructed to implement the real topography information around river so that the damage area scale could be extracted for flood disaster. Also, the social environment thematic maps such as a cadastral map or land cover map could be used to verify the real damage area scale by overlay analysis on aerial photos or satellite images. The construction of these spatial data makes possible to present the real surface information and extract quantitative analysis to support the scientific decision making for establishing the river management policy. For the further study, the lidar surveying data will be considered as the very useful data by offering the real height information of riverbed as the depth of river so that flood simulation can give more reality.

Estimation of Support Working Expenses for Dam Area using GIS Spatial Analysis (GIS 공간분석을 이용한 댐 주변지역 지원사업비 산정)

  • Hwang, Eui-Ho;Lee, Geun-Sang;Chae, Hyuo-Suck;Koh, Deuk-Koo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.4
    • /
    • pp.24-32
    • /
    • 2005
  • Budget distribution system suporting dam area was changed largely in 2005, and thus, population survey and area calculation for dam and needed to be performed based upon the new criteria. According to the former regulations, dam area was confined to inside of 5km from the H.W.L-line. However, new regulations divide it into two categories : inside and outside of catchment area within 2km from the H. W. L-line and those belong to 2~5km from the same line. In this study, topography, DEM, TIN and Hydrological Unit Map were build for the analysis of the Namgang Dam area. It shows that analysis of dam area using GIS methods produces a good results to be used for rational distribution of budget.

  • PDF