A Development of Offshore plant Piping Process Monitoring System Based on 3D CAD Model (3D CAD 모델 기반 해양플랜트 배관 공정 모니터링 시스템 개발)

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.58-65
    • /
    • 2020
  • 3D Models of offshore plant piping materials designed by 3D CAD systems are provided to the production processes in the form of 2D piping drawings and 2D piping installation drawings. In addition to the standard engineering information, the purchasing, procurement, manufacturing, installation, and inspection of raw materials are managed systematically in an integrated process control system. The existing integrated process management system can help reduce the processing time by managing the flow and progress of resources systematically, but it does not include 3D design model information. Hence, it is difficult to understand complicated pipe structures before installing the pipe. In addition, when design changes or immediate design modifications are required, it is difficult to find related data or exchange information quickly with each other. To solve this problem, an offshore plant-piping process-monitoring system was developed based on a 3D model. The 3D model-based piping monitoring system is based on Visual Studio 2017 C# and UNITY3D so that the piping-process work information can be linked to the 3D CAD model in real time. In addition, the 3D model could check the progress of the pipe installation process, such as block, size, and material, and the progress of functional inspection items, such as cleaning, hydraulic inspection, and pneumatic inspection.

An Experimental Study on the Improvement of City Gas Buried Double Piping Integrity (도시가스 매설이중배관 건전성 향상에 관한 실험적 연구)

  • Lim, Hyung-Duk
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.757-763
    • /
    • 2020
  • City gas buried pipes are managed by corrosion protection to prevent corrosion. In the case of the press-in section, the double pipe and the main pipe may cause corrosion under the influence of stray current, which can shorten the life of the pipes. In addition, if the insulator is filled in the press-in section, the press-in section itself is a single structure, and can be directly affected by external impact, and when the surrounding ground subsidence occurs, the stress may be concentrated, resulting in serious consequences. In this study, a serration-type shock absorber in the form of a sliding support was proposed as a new buried double piping construction method using EPS. The serration-type shock absorber can contribute to the improvement of the integrity of the buried double piping, as it can utilize the gas piping's own ductility and stress distribution characteristics with proper anti-corrosion management and shock-absorbing material properties by preventing contact inside the buried double pipe. However, for application to ground piping, there remains a task to supplement the vulnerability against fire due to the characteristics of EPS materials.

Development of Real-Time Thickness Measuring System for Insulated Pipeline Using Gamma-ray (감마선을 이용한 단열배관의 실시간 두께측정시스템 개발)

  • Jang, Ji-Hoon;Kim, Byung-Joo;Kim, Gi-Dong;Cho, Kyung-Shik
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.22 no.5
    • /
    • pp.500-507
    • /
    • 2002
  • By this study, on-line real-time radiometric system was developed using a 64 channels linear array of solid state detectors to measure wall thickness of insulated piping system. This system uses an Ir-192 as a gamma ray source and detector is composed of BGO scintillator and photodiode. Ir-192 gamma ray source and linear detector array mounted on a computer controlled robotic crawler. The Ir-192 gamma ray source is located on one side of the piping components and the detector array on the other side. The individual detectors of the detector array measure the intensity of the gamma rays after passing through the walls and the insulation of the piping component under measurement. The output of the detector array is amplified by amplifier and transmitted to the computer through cable. This system collects and analyses the data from the detector array in real-time as the crawler travels over the piping system. The maximum measurable length of pipe is 120cm/min. in the case of 1mm scanning interval.

Study on AR/VR Model Generation Techniques Using Piping Isometric Drawing Files (배관 ISO도면 파일 기반 AR/VR모델 생성 기법 연구)

  • Lee, Jung-Min;Lee, Kyung-Ho;Kim, Yang-Ouk;Han, Young-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.19-24
    • /
    • 2021
  • This paper presents a method to generate three-dimensional AR/VR models using the information in Isogen data files (IDFs). An IDF is an output file produced by ISOGEN that contains piping isometric drawings. A piping isometric drawing is used for pipeline installation in the shipyard; therefore, the drawing describes assembly information with symbolic features, not with detailed geometric features. An IDF specifies relationships between piping routes and components with three-dimensional points and tag information as well as the bill of the materials of a pipeline. The key idea of this paper is that AR/VR models can be generated with the piping route points data and piping components tag information in real time, without any conversion of standard data exchange file formats, such as STP, IGES, and SAT. This paper describes IDF data structure and suggests the geometry generation process with IDF data and parametric functions.

Development of Materials Degradation Evaluation Program for Nuclear Power Plants (원전 재료열화 평가프로그램 개발)

  • Shin, Ho-Sang;Oh, Young Jin
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.3
    • /
    • pp.23-29
    • /
    • 2011
  • The renewed global interest in nuclear power has arisen from the need to reduce greenhouse gas emissions and to provide sufficient electricity for a growing global population before the accident at Fukushima Dai-ichi nuclear power plant in Japan. In spite of the safety issues of nuclear power plants raised by the ongoing Japanese nuclear crisis, many countries with nuclear power plants (NPPs) are still implementing license extensions of 10~20 years, and even consideration is being given to the concept of life-beyond-60, a further period of license extension from 60 to 80 years. To solving the materials aging problem is integral to its success. To evaluate the plant aging phenomena, a lot of background information such as materials and environment of the parts of the reactor and plant systems is needed by the experts. Information on degradation mechanisms is also used. In this paper, a materials degradation evaluation program called OnMDE-SYS (On-line Materials Degradation Evaluation System) is introduced. The developed program provides a variety of information on the materials and stressors as well as operational experience to the experts. It is also anticipated that the experts can perform materials degradation assessment on the web directly by referring to domestic and international information about the degradation of a nuclear power plants through OnMDE-SYS.

Prediction of Fracture Resistance Curves for Nuclear Piping Materials(II) (원자력 배관재료의 파괴저항곡선 예측)

  • Chang, Yoon-Suk;Seok, Chang-Sung;Kim, Young-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.11
    • /
    • pp.1786-1795
    • /
    • 1997
  • In order to perform leak-before-break design of nuclear piping systems and integrity evaluation of reactor vessels, full stress-strain curves and fracture resistance (J-R) curves are required. However it is time-consuming and expensive to obtain J-R curves experimentally. The objective of this paper is to modify two J-R curve prediction methods previously proposed by the authors and to propose an additional J-R curve prediction method for nuclear piping materials. In the first method which is based on the elastic-plastic finite element analysis, a blunting region handling procedure is added to the existing method. In the second method which is based on the empirical equation, a revised general equation is proposed to apply to both carbon steel and stainless steel. Finally, in the third method, both full stress-strain curve and finite element analysis results are used for J-R curve prediction. A good agreement between the predicted results based on the proposed methods and the experimental ones is obtained.

A Study on Weld Characteristics Analysis of Dissimilar Material (A105-A312) and Shape Friction Welding for Marine Plant Piping (해양 플랜트 배관용 이종 소재(A105-A312) 및 이종 형상 마찰용접의 용접 특성 분석에 대한 연구)

  • Kong, Yu-Sik;Kim, Tae Wan;Kwak, Jae Seob;Ahn, Yong Sik;Park, Young Whan
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.19 no.3
    • /
    • pp.29-35
    • /
    • 2020
  • This paper studies the main parameters of tube-to-bar dissimilar material and shape friction welding for piping materials. The weldability of joint parts was investigated with respect to tensile tests, micro-Vickers hardness, the bond of area, and optical microstructure. The specimens are tested as-welded. Optimal welding conditions are n = 2000 rpm, HP = 50 MPa, UP = 100 MPa, HT = 5 sec, and UT = 10 sec when the metal loss (Mo) is 11 mm. Moreover, the same two materials for friction welding are strongly mixed with a well-combined structure of micro-particles without any molten material, particle growth, or defects. Therefore, the expected result of dissimilar material friction welding includes a reduction of cost and material in the welding process.

A Study on the Piping Defect at The Final Stage of Axisymmetric Extrusion by Upper Bound Element Technique (상계요소법에 의한 축대칭 압출의 최종공정에서의 파이핑 발생에 관한 연구)

  • Choi, Jae-Chan;Choi, In-Keun
    • Transactions of Materials Processing
    • /
    • v.3 no.1
    • /
    • pp.23-37
    • /
    • 1994
  • The upper bound element technique(UBET) is used to analyze the final stage of the axisymmetric forward extrusion. Kinematically admissible velocity field involving curved surface of velocity discontinuity is assumed. The required power to arise the piping defect is obtained and is compared with Aviture's solution a the same condition. Conditions for inception of the cavity and development of the pipe are predicted. The internal radius of the pipe and critical length of billet are also determined. Experiments are carried out for extrusion with lead specimens to investigate the piping phenomena. The theoretically predicted results showed reasonably good agreement with the experimental observation.

  • PDF

Limit Loads for Piping Branch Junctions with Local Wall-thinning under Internal Pressure and In-plane Bending (감육이 존재하고 내압과 굽힘하중의 복합하중을 받는 T 분기관의 한계하중)

  • Han, Jae-Jun;Lee, Kuk-Hee;Kim, Yun-Jae;Lee, Sung-Ho;Park, Chi-Yong
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.299-304
    • /
    • 2008
  • This paper presents plastic limit loads of piping branch junctions with local wall thinning under combined pressure and in-plane bending, based on systematic three-dimensional finite element limit analyses using elastic-perfectly plastic materials. An ideal branch junction without weld or reinforcement around the intersection is considered with two locations of wall thinning; one in the run pipe, and the other in the branch pipe. Based on FE results, effects of thinning geometries on plastic limit moments are quantified and simple approximations of plastic limit loads are proposed.

  • PDF