• 제목/요약/키워드: Pipeline construction

검색결과 203건 처리시간 0.03초

Practical Issues in Application of RFID to Pipeline Construction and its Benefit Analysis

  • Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권2호
    • /
    • pp.1-7
    • /
    • 2014
  • Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.

해저 송유배관 유지관리를 위한 기준 보완 제시 (Supplementation of Regulation on the Offshore Oil Pipeline for Maintenance)

  • 강찬성;문승재
    • 플랜트 저널
    • /
    • 제8권2호
    • /
    • pp.70-81
    • /
    • 2012
  • The study aims to supplement facility management plan and safety regulations & standard of oil pipeline by searching and reviewing related regulation & standard inside and outside of the country. Korean regulation & standard is reviewed based on harbor and fishery design standard of the ministry of maritime affairs and fisheries, general technology standard of oil pipeline safety regulation, gas excavation construction and safety maintenance indicator of Korea gas corporation. Global regulation & standard is reviewed based on U.S standard inspection for offshore pipeline and Europe/Mexico standard inspection for offshore pipeline. The contents of offshore pipeline installation is inserted into pipeline sector for objected facilities of safety inspection regulation & standard and, the standard of safety inspection for offshore pipeline is newly presented into pipeline maintenance part of the planning facilities management with its inspection period and method.

  • PDF

자원 이송용 파이프라인의 내리기 단계에서 평면 거동 평가를 위한 해석 모델 (2D Analytical Model to Evaluate Behavior of Pipeline in Lowering Phase)

  • 김정석;안기용
    • 한국건설순환자원학회논문집
    • /
    • 제11권4호
    • /
    • pp.467-475
    • /
    • 2023
  • 본 논문에서는 내리기 시 파이프라인의 단면력 해석을 위한 합리적인 해석 모델을 제안했다. 본 해석 모델은 기하학적 특성과 경계조건을 고려하여 파이프라인을 분할한 후 two parameters Beam On Elastic Foundation과 Euler-Bernoulli 빔으로 모델링했다. 또한 파이프라인과 지반의 상호 작용 뿐만 아니라 파이프라인에 작용하는 축력을 했다. 기존 모델은 정형화된 하중 조건만 적용이 용이했으나 Segmented Pipeline Model로 정의된 제안 모델은 내리기 시 발생되는 대부분의 시공 조건에 대해 고려할 수 있다. 또한 가정을 최소화하고 요소를 세분화하여 모델링의 편의성과 적용성을 향상시켰다. 그럼에도 불구하고 이 모델은 FE 모델에 대비 높은 정확도를 갖고 있으므로 내리기 시 파이프라인의 안전성 평가는 물론 형상관리에도 효율적으로 활용될 수 있을 것으로 기대된다. 또한 시공 단계에서 파이프라인의 안전성을 확보함에 따라 운용 중 내구성 향상에 큰 도움이 될 것으로 판단된다.

연약지반 배관응력 모니터링 시스템 개발 및 적용 (Stress Monitoring System for Buried Gas Pipeline in Poor Ground)

  • 홍성경;김준호;정석영
    • 한국안전학회지
    • /
    • 제21권1호
    • /
    • pp.41-47
    • /
    • 2006
  • This paper introduces stress monitoring system for buried gas pipeline in poor ground. During the six months of improvement construction of poor ground, maximum settlement of gas pipeline is about 40 cm. This value represents relative small compared to the initial settlement estimation of ground improvement construction plan, 90 cm. Also, this paper includes the result of finite element analysis of gas pipeline to confirm safety of pipelines in poor ground. The stress monitoring system for gas pipeline was developed to guarantee the safety of buried gas pipeline in poor ground. Eventually, the ground improvement workings are ended safely and it is proved that the pipeline has no safety problem.

Analysis of offshore pipeline laid on 3D seabed configuration by Abaqus

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid;Sagharichiha, Mohammad
    • Ocean Systems Engineering
    • /
    • 제5권1호
    • /
    • pp.31-40
    • /
    • 2015
  • Three dimensional (3D) non-linear finite element analysis of offshore pipeline is investigated in this work with the help of general purpose software Abaqus. The general algorithm for the finite element approach is introduced. The 3D seabed mesh, limited to a corridor along the pipeline, is extracted from survey data via Fledermous software. Moreover soil bearing capacity and coefficient of frictions, obtained from the field survey report, and are introduced into the finite element model through the interaction module. For a case of study, a 32inch pipeline with API 5L X65 material grade subjected to high pressure and high temperature loading is investigated in more details.

가스 파이프라인의 차량진동 응답 예측 (A Response Estimation for Vehicle Vibration of Gas Pipeline)

  • 박선준;박연수;강성후
    • 한국소음진동공학회논문집
    • /
    • 제14권1호
    • /
    • pp.40-49
    • /
    • 2004
  • In this paper, vibration response of aerial gas pipeline due to vehicle loads was quantitatively estimated through experiment and analysis in open cut construction site. The vehicle vibration of various construction machines causes serious effect to the aerial gas pipeline. The new vibration prediction equations presented in this study can estimate the vibration velocity response of the aerial gas pipeline. In the nitration prediction equations, the vehicle′s weight and traveling velocity, which are the sources of vibration, are combined into the term called, "scaled weight" Methods to reduce vibration were proposed in case the vibration velocity response of the gas pipeline exceeded the vibration criterion, using the vibration prediction equations presented in this study. One was to limit the vehicle′s traveling velocity and the other to install the isolation equipment. Both methods can be estimated quantitatively.

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구 (A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구 (A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF

Analysis of Data and Information Flow for Pipeline in Permafrost Area

  • Won, Seo-Kyung;Lee, Do-Yun;Lee, Junbok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-745
    • /
    • 2015
  • Since the G20 summit in 2011, South Korea who was dependent on foreign energy needs of 97% receives natural gas from Russia from 2015 to 30 years, but South Korea is a situation of scarce experience and skills of pipeline project in permafrost area. In this study, we kept the target for analyzing the data and information flow of the pipeline projects in permafrost area, and the ultimate goal is set to developing the hierarchy structure of design and construction data for an efficient administration of the project. In order to develop that structure, Configuration Management was introduced and through this method, it is expected to be used to build the overall information management system in O&M phase.

  • PDF