Kim, Yong;Jang, Hyeuk;Ryu, Duck-Hee;Kim, Jae-Seong;Lee, Bo-Young;Boo, Joon-Hong
Proceedings of the KSME Conference
/
2004.11a
/
pp.1-6
/
2004
Lots of researches were gone already about grooving corrosion mechanism of ERW carbon steel pipe. But there is seldom study for water hammer happened by fluid and acceleration of corrosion rate by incresed flow velocity. Therefore, in this study carried out the analysis based on hydrodynamic and fracture mechanics. Analyzed stress that act on a pipe using ANSYS as a program, and also FLUENT and STAR-CD were used for flow phenomenon confirmation. As the result, fatigue failure is happened by water hammer and corrosion rate was increased because of turbulent flow.
Journal of the Korean Society for Advanced Composite Structures
/
v.7
no.1
/
pp.1-8
/
2016
In this paper, the full-size structural performance test for a lightweight soundproof tunnel composed of partitioned pipe truss members is carried out to investigate the structural performance. In addition, a nonlinear structural analysis of the same finite element model as the full-size testing model is performed to compare the test result. The test and analysis results showed that the lightweight soundproof tunnel ensures the structural safety against wind loads, snow loads and load combinations. As a result, the full-size test and analysis results meet all the design load conditions, hence the proposed lightweight soundproof tunnel is ready for the field application.
By carrying out numerical analyses and model experiments, this paper presents the attenuation characterization of an L(0,2) guided ultrasonic wave propagating in a buried steel pipe. From this investigation, we first find that the L(0,2) mode has a better attenuation property. Second, it is shown from the numerical analyses that the attenuation increases with increases in the soil embedment length (0, 500, 1000, and 1500 mm) and degrees of saturation (0, 50, 99, and 100%). Third, it is also shown from the model experiment that the attenuation increases as the embedment lengths and soil moisture quantities (0, 10, 20, and 30 kg) increase. Finally, we find that an exponential extrapolation gives a better attenuation prediction because the extrapolation gives similar attenuation patterns between the numerical and experimental results.
Although Gas Tungsten Arc Welding (GTAW or TIG welding) is considered as high quality and precision welding process, it also has demerit of low melting rate. Narrow-gap TIG welding which has narrow joint width reduces the groove volume remarkably, so it could be shorten the welding time and decrease the overall shrinkage in heavy wall pipe welding. Generally Narrow-gap TIG welding is used as orbital welding process, it is important to select the optimum conditions for the automatic control welding This paper looks at the application and metallurgical properties on Narrow-gap TIG welding joint of heavy wall large austenitic stainless steel pipe to determine the deposition efficiency, the resultant shrinkage and fracture toughness. The fracture toughness depends slightly on the welding heat input.
Proceedings of the Safety Management and Science Conference
/
2012.04a
/
pp.301-311
/
2012
The law(construction standard specification, construction, standard-work regulation, Industry safety standard related regulation) related to the installation of scaffolding being used commonly on the construction site is regulated that the gap of ledger is within 1.5m and first ledger is within 2m. The gap of ledger here is essential for the stability of scaffolding structure. But it is determined that it is possible for the gap of ledger is applied by explaining safety handrail as ledger, because of the fact that in current, on the construction site, safety handrail is installed with the material of scaffolding ledger as a steel tube pipe. On this study, it is aimed to guarantee the safety by analyzing the ledger of scaffolding practically and prevent the accident of manager and laborer through the actualization.
Lee Jang-Hwan;Hwang Byoung-jun;Kim Je-Sub;Jung Keun-Ho;Lim Nam-Ki;Jung Sang-Jin
Proceedings of the Korea Concrete Institute Conference
/
2004.11a
/
pp.517-520
/
2004
Concrete Filled steel Tube pipe structure is a rational type of structure that maximizes performance by combining the strong points of steel frame and concrete. In the structure, the confining effect of steel pipes increases the bearing power of infilled concrete and the strengthening of local bucking of steel pipes by infilled concrete increases the bearing power of members. and these result in the reduction of cross-sectional area and high transformation capacity. Moreover. the structure is economically efficient and widely applicable that it is used from super-high buildings to residential, business and apartment buildings. It enables the construction of multi-story buildings with long spans using columns of small cross-sectional area. In case of diaphragm, however, it is difficult to confirm the compactness of the closed inside of steel pipes. The present study examined the properties of super-high strength concrete over 80MPa by comparing it with 40MPa concrete through heat conductivity and length change tests based on a mixture ratio satisfying the mixture goal presented in the guideline for the design and construction of concrete-filled steel pipe structure. and evaluated the performance of super-high strength concrete according to the shape and size of the aperture ratio of diaphragm.
Kim, Seog-ku;Jeong, Jang-sik;Kwak, Phill-jae;Choi, Jun-hyang;Lee, Hyun-dong;Lee, Tae-yoon
Journal of Korean Society on Water Environment
/
v.20
no.2
/
pp.163-169
/
2004
Feasibility of using PE sheet laminated CSP(Corrugated steel pipe) to sewers were tested via corrosion and abrasion tests for PE sheet laminated CSP; 1) corrosion test for PE film and PE coated plate, 2) corrosion test for joint of PE sheet laminated CSP, 3) corrosion test for outside of PE sheet laminated CSP, and 4) abrasion test for inside of PE sheet laminated CSP. The results for the corrosion and abrasion tests are as follows. 1. Results for corrosion tests on PE films and zinc coated steel plates that were coated with PE films show that the surfaces of both PE were not changed compared to those of original PE samples. Furthermore, PE films maintained strong adhesion on the steel plates even though they were exposed to sewage and seawater provided cutting planes of the steel plates were treated with molding. But, results for corrosion tests on the spots that were previously cut off by a knife and a cutting planes of the steel plates were treated without molding show that steel plates have been corroded if they were exposed to sewage and seawater. 2. Results for corrosion tests on joints of PE sheet laminated corrugated steel using sewage show that gathering rust was observed at cutting plane of PE sheet laminated corrugated steel after 180 days, but PE film was not flaked off. However, PE film at cutting plane was flaked off when PE sheet laminated corrugated steel was exposed to seawater. Furthermore, flaking process was severely progressed at lockseam points of which the surfaces were not smooth. 3. Results for laying PE sheet laminated corrugated steel under the ground show that the surface of untouched PE film was almost identical to that of original PE film. However, the spots that were previously cut off by a knife and a cutting plane of PE sheet laminated corrugated steel have flaked off. 4. As a result of abrasion tests conducted with PE sheet laminated corrugated steel and sand, brilliance and thickness of PE was not greatly changed under the severe abrasion conditions. Therefore, the durability of PE sheet laminated corrugated steel for abrasion was determined to be good.
Journal of the Korea Institute of Building Construction
/
v.22
no.2
/
pp.161-169
/
2022
The government [3] specifies steel pipe scaffolding as conventional scaffolding and is promoting the installation of system scaffolding, an integrated work platform, and avoidance of the use of steel pipe scaffolding as much as possible. However, in places where equipment cannot enter, such as power plants and plant sites, places the structure is complex, and places where scaffolding cannot be stacked on the ground, there is no choice but to install steel pipe scaffolding. When installing steel pipe scaffolding on an H-beam structure at a high place, the performance of the steel frame clamp is very important in order to form a work space which workers can work safely. In this study, the displacement magnitude and tensile load of members in each installation direction of the clamp for steel frame were verified through performance tests and structural analysis modeling. As a result, it was confirmed that the performance for each installation direction satisfies the safety certification standard tensile load of 10,000N. Although the performance value is satisfactory, deformation of the attachment pressing bolt was verified and was confirmed to have minimal deformation. Thus, to ensure the load is properly to the attachment body, the clamp for a steel frame must be installed in the direction in which the load is transmitted.
Renewability and pollutant free energy source makes hydrogen energy popular rapidly. Hydrogen gas pressure which is after passing through reciprocating compressor part has high pulsation wave form. A unit, snubber is used as compressor components to reduce the harmful pulsation waveform and to remove the impurities in the hydrogen gas. An experiment has been conducted to investigate the pulsation reduction performance of a steel pipe used in snubber system. The amplitude of pressure reduction were varied from $0.054{\sim}0.321\;kPa$ for 10 hz to 60 hz motor speed. Compressor operation by motor with 10 to 60 hz were resulted in reduction of pressure pulsation from 16.415% to 35.151%. Pressure losses were varied from $0.001%{\sim}0.759%$, and pressure drop per centimeter of the steel pipe were varied from $0.0160{\sim}16.03\;Pa$.
Journal of the Korean Society of Manufacturing Process Engineers
/
v.19
no.1
/
pp.43-48
/
2020
At present, 24 nuclear power plants are in operation nationwide as the main power source responsible for about 27% of Korea's electricity, and five nuclear power plants are currently under construction. Issues of nuclear safety and reliability have always existed, but after the Fukushima accident, ensuring reliability has become an even more important issue for safety. Compared to other kinds of accidents, the initial response after a nuclear accident is more important than any other accident. Prior to accidents, it is important to be able to predict and judge the accident in advance for the sake of prevention. In this research, non-destructive inspection methods for existing pipe welds include radiographic, ultrasonic, magnetic particle practice, and liquid penetration testing. For this experiment, carbon steel pipes like that of the material used in nuclear pipes were adopted, and specimen welded to the flange (Flange) were manufactured. After testing, the weld specimen were not damaged through the infrared thermography (IRT) experiment. This study attempted to improve the safety of carbon steel pipes through a comparative analysis of finite element analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.