Journal of Information Technology Applications and Management
/
v.9
no.3
/
pp.31-46
/
2002
The objective of this paper is to develop an evaluation model for pilot informatization projects. There are relatively many researches on evaluation models for information systems. These previous researches, however, lack of comprehensive view of informatization Projects and pilot systems. We apply and test a hybrid evaluation model for to measure the success of pilot informatization projects. A user satisfaction model has been used and hypotheses are developed to find relationships of evaluation factors. The hypotheses have been tested with 51 user surveys. The result of this research can give an insight for the evaluation of pilot informatization projects.
South Korea is carrying out and expanding smart grid pilot projects to build a framework for a national smart grid and expand overseas markets. It is important to properly evaluate performance for the projects and further develop related businesses in a more desirable direction. This study is to provide evaluation criteria for the performance of smart grid pilot projects and a basis for further continuous development according to the type of projects. Evaluation criteria were selected through reviews of documental materials and expert discussions. The viability of the proposed draft in the situation of South Korea was examined by expert Delphi surveys. The Delphi surveys were conducted twice, and therefrom drawn were 18 evaluation criteria for 6 evaluation categories.
To meet the demand of Korea's e-trade, global e-trade should be implemented and the global network is absolutely needed for the completion of e-trade. In this regard, this study suggested the concept and effect of global e-trade and analyzed the current status of PAA, ASEM projects which have been processing as pilot projects. Also, it derived tasks for the implementation of global e-trade through SWOT analysis and made up questions to the firms which are participating the pilot projects. Therefore, the four implementation models of global e-trade network are brought up. These models are very similar to each pilot project such as PAA, ASEM, and could be classified by developed and developing countries.
This study aims to identify limitations and pending problems after reviewing the overall policies and status of rural Newtown projects, and to seek solutions to its problems. This study targeted the villages of 5 districts, which were developed as rural new-towns after 2009 and included the basic status and progress of the pilot districts. This study conducted a literature review to examine the basic status and progress of the pilot districts, and based on this, analyzed the demand prediction, site selection, project implementation, and housing and amenity facilities of the pilot districts. The study methods included literature reviews, on-site surveys, interviews with village representatives, and consultations with experts. According to the analysis results, a low occupancy rate of the Newtown project districts is because the prediction of occupancy demand was incorrectly completed before implementing the projects. Also, the eligibility for occupancy, such as age restriction and mandatory farming was too strict. Other problems included an absence of income generation support policies for rural returnees, a housing supply policy in disregard of agricultural characteristics, and a lack of understanding of maintenance of communal space, etc.
Since 2004, the Korean government has been engaged in u-IT new technology verification projects in an effort to level up the industries. Recently, cases are reported that RFID/USN technology has been adopted and applied to business processes, mainly by large enterprises. However, further policies and support for the industries have been restrained because of unavailability of essential data for policy making. Therefore, the study examined the level of satisfaction among the actual recipient organizations from the 27 pilot projects to draw implications from the study result. Accordingly, the level of satisfaction was assessed in four project phases from RFID/USN building, utilization (technical quality), utilization (business quality), to maintenance. The study result showed that the technical stability reached a significant level but the level of satisfaction in the maintenance phase for the utilization and proliferation of the technology remained at the lowest. It suggested that a more specified policy support is needed in the maintenance phase to include inexpensive supply of tags and devices, a maintenance establishment of consortium to maintain reliability and continuity of service, strengthening internal competence of the beneficiary organizations for utilization of RFID/USN.
Journal of The Korea Institute of Healthcare Architecture
/
v.27
no.4
/
pp.41-50
/
2021
Purpose: This study is aimed at the case of the cognitive health design pilot projects promoted by the Seoul Metropolitan Government since 2014 in terms of design to solve social problems in accordance with the aging population of our society. The purpose of this study is to analyze the maintenance and management of the projects and to suggest implications for the promotion and expansion of sustainable cognitive health design in the future. Method: It set the analysis frame by dividing management into maintenance-damage-demolition for the spatial types and spatial elements suggested in the Seoul Cognitive Health Guidelines. And it analyze the actual conditions of four pilot projects based on the field survey. Results: First, the ratio of damage and demolition was higher than maintenance. Second, designs and techniques with low durability were applied. Most of the cases where floor marks were applied to the external environment were lost or difficult to recognize, and their functions were limited due to storage of goods and parking of vehicles and motorcycles. Third, there was a large variation according to the type of residence. The project contents that can be applied to the low-rise residential area were also limited, and more elements were demolished than in the apartment type. Implications: First, it should limit project contents of space types and space elements that can be maintained even over time. Second, it should seek sustainable design and technical solutions. Third, it should seek alternatives to cognitive health design in low-rise residential areas where a large number of elderly people live.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.3
/
pp.192-203
/
2012
As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to 'Fundamental Construction Law of u-City,' u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, 'Broadband Information Network Development Project' of Ansan City will provide a reference model of expanding u-City projects for other cities.
Urban regeneration is a project to enhance the competitiveness. Therefore, it is necessary to examine the contents and expected effects of urban regeneration projects. In this study, we classified and analyzed the contents and expected effects of the 11 neighborhood urban regeneration pilot projects. The main results are as follows; First, physical regeneration is the most popular in terms of project contents, and social approach is the most typical for the expected effects. Second, the project of social regeneration is mainly focused on strengthening the capacity of residents. Third, the most expected effect of physical regeneration was about the improvement of landscape. Fourth, the most expected effect of social regeneration was the contents of residents' participation. Finally, there is a need for the development of projects that can expect a combination effects rather than a single effect. The urban regeneration new deal projects need to pay more attention to projects that can have various effects based on the development of competitive urban contents.
Korean Journal of Construction Engineering and Management
/
v.23
no.3
/
pp.116-127
/
2022
Recently, the smart city market based on the 4th industrial revolution is rapidly expanding worldwide and is being promoted in various ways. Korea has promoted various smart city public and private partnership projects, but there were limits to the activation of smart city public and private partnership projects due to insufficient enactment and revision of laws, public-oriented ordering method, and lack of private execution capacity. Therefore, this study intends to suggest key success factors for each stage of smart city public and private partnership projects through the analysis of the order status of the smart city national pilot city and the analysis of previous research. Through this, it is expected that it will be possible to eliminate various types of risks that may occur in the domestic smart city public and private partnership projects and contribute to revitalizing the smart city public and private partnership projects.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.209-212
/
2007
Project managers' leadership in construction projects significantly influence project performance and outcomes. However, due to its conceptual and quantitative nature, leadership is a subject which is difficult to be evaluated or measured despite of the benefits of its measurement. The objective is this paper to apply the LBDQ technique in evaluating project managers' leadership and discuss outcomes through a pilot test.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.