• Title/Summary/Keyword: Pile efficiency

Search Result 139, Processing Time 0.043 seconds

Efficiency of Pile Groups with Arrangement of Piles Using Numerical Analysis (수치해석을 통한 말뚝 배치에 따른 군말뚝 효율 분석)

  • Lee, Kichoel;Shin, Sehee;Kim, Dongwook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.523-531
    • /
    • 2021
  • In general, the foundation refers to a group pile with several single piles connected by an upper structure. However, when a load is applied to pile groups, the range of stress applied to the ground is expanded and overlapped compared with the single pile, so the overall bearing capacity may decrease. This reduction ratio of bearing capacity is referred to as the efficiency of pile groups. Therefore, in this study, the soil composition, the arrangement and spacing of group piles, and the contact characteristics between the ground and piles were set as analysis variables, and the group pile efficiency and individual pile behavior were analyzed. As a result of the analysis, the efficiency of pile groups tends to converge or decrease when the friction coefficients are increased with ground type. Through this, the optimal efficiency of pile groups can be derived. In addition, through the analysis of individual piles, the load ratio of each pile was analyzed when an upper load was applied. In the case of piles located inside group piles, the load was relatively low, and this is considered to have an influence on the internal ground.

Study on Application of PIR-D(Pile Installation Recorder-Driven Pile) in Driven Pile (항타 말뚝에서 항타관리시스템(Pile Installation Recorder-Driven Pile)의 적용성에 관한 연구)

  • Park, Bong-Keun;Park, Min-Cheul;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.28-35
    • /
    • 2004
  • Driven pile has the excellent bearing characteristics and good economics, so it is known as the comparative piling method. To use the advantages of driven pile fully, it is necessary to perform the proper construction management. Engineers must drive pile to the proper bearing layer with proper blow energy and measure the blow count and penetration per certain depth to analyze the bearing capacity and driveability. In conventional method, these parameters have been measured manually so it was difficult to get good accuracy. After PIR-D(Pile Installation Recorder-Driven Pile) was attached to the driving equipment, the hammer efficiency, blow count and penetration in blow/10cm were measured automatically. In this paper, to givethe rational judgement criteria of bearing layer, driveability, blow/10cm according to pile depth during pile driving, the some relationship between the driving resistance and ground layer distribution was analyzed. The ground investigation during piles (PHC ${\Phi}450,\;{\Phi}400\;&\;Steel\;Pile\;{\Phi}609{\ast}16t$) installation in the marine clay layer in Incheon, the sandy soil layer in Yongin and the tuff layer in Pusan was done. And measuring hammer efficiency not doing recently, we could compare hammer efficiency(Eh) by PIR-D and energy transfer ratio(ETR) by Pile Dynamic Analyzer(PDA).

  • PDF

A new proposal for the appropriate quality control of driven piles by using set values (최종관입량을 기준으로 한 합리적인 말뚝 시공관리 방안)

  • 이명환;홍헌성;김성회;전영석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03a
    • /
    • pp.51-63
    • /
    • 2000
  • Because of simplicity and easiness, dynamic pile driving formulae have long been used by most of the field engineers for pile quality control purposes. Yet their reliability have been repeatedly reported unsuitable and the results can lead to significant errors. According to the research results by the authors, the two most important sources of unreliability of dynamic pile driving formulae are uncertainty in the estimation of hammer efficiency and time dependent characteristics of pile bearing capacity. Based on this finding a new method is proposed. By using the actual value of hammer efficiency the pile bearing capacity at the time of driving could be reasonably estimated. By performing restrike test sometime after pile installation, time effect coefficient could be determined. The effectiveness of the proposed method was proven in the actual construction project.

  • PDF

New Design Method for Pile Group under Vertical Load (연직하중을 받는 무리말뚝의 새로운 설계 방법)

  • 이수형;정충기
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.06a
    • /
    • pp.11-29
    • /
    • 2002
  • Current design of pile group is based on the estimation of the overall bearing capacity of a pile group from that of a single pile using a group efficiency. However, the behaviors of a pile group are influenced by various factors such as method of pile installation, pile-soil-pile interaction, cap-soil-pile interaction, etc. Thus it is practically impossible to take into account these factors reasonably with the only group efficiency, In this paper, a new method for the design of pile groups is proposed, where the significant factors affecting the behavior of a pile group are considered separately by adopting several efficiencies. Furthermore, in the proposed method, the load transfer characteristics of piles and the difference of pile behaviors with respect to the pile locations in group can be taken into account. The efficiencies for the method are determined using the settlement failure criterion, which is consistent with the concept of allowable settlement for structures. The efficiencies calculated from the results of existing model tests are presented, and the bearing capacity of a pile group in the other model test is calculated and compared with that from the test result, to verify the validity of the proposed method.

  • PDF

Characteristics of Driving Efficiency and Bearing Capacity for Non-welded Long Steel Pipe Pile Method (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호;이상일;박진석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.381-388
    • /
    • 1999
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance by time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to work out the existing problems, and calibration chamber tests are peformed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new installation method has increase bearing capacity as well as reduce installation cost and period for long steel pipe piles as compared with existing methods.

  • PDF

Pilot 규모 biopile에 의한 유류오염토양의 정화

  • 김태승;박종겸;윤정기;노회정;정일록;김종하
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.04a
    • /
    • pp.205-208
    • /
    • 2004
  • Tile pilot scale biopile system was designed and constructed for evaluation of biopile efficiency. For the biopile system construction, two soil samples that were contaminated by mainly diesel were selected. The pilot scale biopile were consisted of the biopile dome, aeration system and monitoring system and two biopiles(pile A and pile B) were operated with nutrients and inoculum for more 100 days. The initial TPH concentrations for pile A and pile B were about 10,000 mg/kg and 2,300 mg/kg, respectively. After 70 days, the microbial densities in the pile A was increased and in the pile B it was no changed. The TPH contents decreased about 70% in the pile A and 30% in the pile B. Also, various kinds of PAHs were detected by analyzing the GC/MSD, and the reducing ratio in the piles A and pile B were similarly declined. The average biodegradation rates were calculated about 66.8mg/kg-day in the pile A and 10.9mg/kg-day in the pile B. During the operation period, pile temperature was the major limiting condition for the efficiency of all biopiles.

  • PDF

New Design Method for Pile Group Under Vertical Load (연직하중을 받는 무리말뚝의 새로운 설계 방법)

  • 이수형;정충기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.1
    • /
    • pp.31-40
    • /
    • 2003
  • Current design of pile group is based on the estimation of the overall bearing capacity of a pile group from that of a single pile using a group efficiency. However, the behaviors of a pile group are influenced by various factors such as the method of pile installation, pile-soil-pile interaction, cap-soil-pile interaction, etc. Thus, it is practically impossible to take into account these factors reasonably with the only group efficiency. In this paper, a new method for the design of pile groups is proposed, where the significant factors affecting the behavior of a pile group are considered separately by adopting several efficiencies. Furthermore, in the proposed method, the load transfer characteristics of piles and the difference of pile behaviors with respect to the pile locations in group can be taken into account. The efficiencies for the method are determined using the settlement failure criterion, which is consistent with the concept of allowable settlement fur structures. The efficiencies calculated from the results of existing model tests are presented, and the bearing capacity of a pile group in the other model test is calculated and compared with that from the test result to verify the validity of the proposed method.

Reinforcing Efficiency of Micro-Pile with Precast Retaining Wall (프리캐스트 옹벽 마이크로 파일의 보강 효율)

  • Moon, Changyeul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.61-71
    • /
    • 2008
  • This study investigates the lateral resistance of micro-pile system when surcharge load is acting on the back of retaining wall. Both laboratory experiments and numerical analysis were performed. The experimental retaining wall model was developed on the laboratory-sized foundation. While surcharge load was acting, the interval and length varied as experimental variables. From the investigation it is known that the micro-pile system can effectively control the lateral displacement which is developed on the precast retaining wall. The effectiveness became increased as the pile interval reduced and the length of pile increased. The greatest reinforcing efficiency was shown when the pile length was 0.5H and the interval was 7D.

  • PDF

Shaft Group Efficiency of Friction Pile Groups in Deep Soft Clay (대심도 마찰무리말뚝의 주면 무리효율 분석)

  • Paek, Jin-Yeol;Cho, Jae-Yeon;Jeong, Sang-Seom;Hwang, Taik-Jean
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2C
    • /
    • pp.49-60
    • /
    • 2012
  • In this study, the behaviors of friction pile groups are investigated using 3D finite element (FE) analysis. The emphasis was quantifying on the shear load transfer (f-w) characteristics of pile groups and the shaft group effects. A framework for determining the f-w curve is proposed based on both theoretical analysis and field load test database. Through comparisons with case histories and FE results, it is shown that the proposed f-w curve is capable of predicting the behavior of a friction pile in deep soft clay. Additionally, a numerical analysis that takes into account the group efficiency factors were performed for major parameter on group pile-soil interaction, such as the pile spacing, pile arrangement, soil condition, and location of pile cap. Based on these results, the shaft group efficiency factors were also proposed.

Numerical Analysis on the Effect of Increasing Stiffness of Geosynthetics on Soil Displacement and Pile Efficiency in Piled Embankment on Soft Soil (성토지지말뚝구조에서 토목섬유 인장강성 증가에 따른 변위 억제 및 말뚝효율 증가량에 대한 수치해석적 분석)

  • Lee, Taehee;Lee, Su-Hyung;Lee, Il-Wha;Jung, Young-Hoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.4
    • /
    • pp.31-43
    • /
    • 2015
  • A numerical analysis on the effect of increasing tensile stiffness of the geosynthetics on the soil displacement and pile efficiency was conducted. Parametric studies by changing the stiffness of soft soil, internal friction and dilatancy angles of the embankment material, and flexual stiffness of the composite layer including the geosynthetics were carried out. In general, increasing stiffness of the geosynthetics improves the pile efficiency, whereas the amount of its improvement depends on the condition of parameters. In case of the sufficiently low stiffness of the soft soil or high flexual stiffness of the composite layer including the geosynthetics, a noticeable increase in the pile efficiency can be observed. When the stiffness of the soft soil is very low, the increase in the stiffness of the geosynthetics can significantly reduce the vertical displacement in the piled embankment. When the flexual stiffness of the composite layer is sufficiently high, increasing stiffness of the geosynthetics can greatly improve the pile efficiency.