• Title/Summary/Keyword: Pile diameter

Search Result 345, Processing Time 0.021 seconds

Reinforcing Effect of Micropiles According to the Cohesive Characteristics of the Soil Layer Beneath Foundations (파일직경과 기초하부 토사층의 점착특성에 따른 마이크로파일 보강효과)

  • Jang, Chang-Hwan;Kim, Mu-Yeun;Hwang, Tae-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.41-53
    • /
    • 2024
  • Micropiles are small, cast-in-place piles with a diameter of 300 mm or less, primarily used to reinforce existing structures and support new constructions. As the application of these piles has expanded, extensive research has been conducted on their bearing characteristics, particularly in micropiled rafts. These studies have consistently demonstrated the positive impact of micropiles on foundation reinforcement. However, previous research often overlooked the potential variations in behavior between micropiled and conventional piled rafts based on different pile conditions. Furthermore, the influence of the cohesive characteristics of the soil layer beneath the foundation on the reinforcing effect of the micropiles has not been adequately addressed. This study, therefore, undertook 3D numerical analysis to assess the reinforcing effect of micropiles, considering both pile conditions and the cohesive characteristics of the soil layer beneath the foundation. The findings revealed that micropiles are significantly more effective in non-cohesive soil layers compared to cohesive ones, with the potential to increase the bearing capacity of the raft by up to 3.7 times.

Numerical Analyses for Evaluating Factors which Influence the Behavioral Characteristics of Side of Rock Socketed Drilled Shafts (암반에 근입된 현장타설말뚝의 주면부 거동에 영향을 미치는 변수분석을 위한 수치해석)

  • Lee, Hyuk-Jin;Kim, Hong-Taek
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6C
    • /
    • pp.395-406
    • /
    • 2006
  • Drilled shafts are a common foundation solution for large concentrated loads. Such piles are generally constructed by drilling through softer soils into rock and the section of the shaft which is drilled through rock contributes most of the load bearing capacity. Drilled shafts derive their bearing capacity from both shaft and base resistance components. The length and diameter of the rock socket must be sufficient to carry the loads imposed on the pile safely without excessive settlements. The base resistance component can contribute significantly to the ultimate capacity of the pile. However, the shaft resistance is typically mobilized at considerably smaller pile movements than that of the base. In addition, the base response can be adversely affected by any debris that is left in the bottom of the socket. The reliability of base response therefore depends on the use of a construction and inspection technique which leaves the socket free of debris. This may be difficult and costly to achieve, particularly in deep sockets, which are often drilled under water or drilling slurry. As a consequence of these factors, shaft resistance generally dominates pile performance at working loads. The efforts to improve the prediction of drilled shaft performance are therefore primarily concerned with the complex mechanisms of shaft resistance development. The shaft resistance only is concerned in this study. The nature of the interface between the concrete pile shaft and the surrounding rock is critically important to the performance of the pile, and is heavily influenced by the construction practices. In this study, the influences of asperity characteristics such as the heights and angles, the strength characteristics and elastic constants of surrounding rock masses and the depth and length of rock socket, et. al. on the shaft resistance of drilled shafts are investigated from elasto-plastic analyses( FLAC). Through the parametric studies, among the parameters, the vertical stress on the top layer of socket, the height of asperity and cohesion and poison's ratio of rock masses are major influence factors on the unit peak shaft resistance.

Design Load Analysis for Offshore Monopile with Various Estimation Methods of Ground Stiffness (지반강성 산정방법에 따른 해상 모노파일의 설계하중 해석)

  • Jang, Youngeun;Cho, Samdeok;Choi, Changho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.9
    • /
    • pp.47-58
    • /
    • 2014
  • This study explores methods for modeling the foundation-seabed interaction needed for the load analysis of an offshore wind energy system. It comprises the comparison study of foundation design load analyses for NREL 5 MW turbine according to various soil-foundation interaction models by conducting the load analysis with GH-Bladed, analysis software for offshore wind energy systems. Furthermore, the results of the aforementioned load analysis were applied to foundation analysis software called L-Pile to conduct a safety review of the foundation cross-section design. Differences in the cross-section of a monopile foundation were observed based on the results of the fixed model, winkler spring and coupled spring models, and the analysis of design load cases, including DLC 1.3, DLC 6.1a, and DLC 6.2a. Consequently, under all design load conditions, the diameter and thickness of the monopile foundation cross-section were found to be 7 m and 80 mm, respectively, using the fixed and coupled spring models; the results of the analysis conducted using the winkler spring model showed that the diameter and thickness of the monopile foundation cross-section were 5 m and 60 mm, respectively. The study found that the soil-foundation interaction modeling method had a significant impact on the load analysis results, which determined the cross-section of a foundation. Based on this study, it is anticipated that designing an offshore wind energy system foundation taking the above impact into account would reduce the possibility of a conservative or unconservative design of the foundation.

A Study on the Ultimate Point Resistance of Rock Socketed Drilled Shafts Using FLAC3D and UDEC (유한차분해석과 개별요소해석을 이용한 암반에 근입된 현장타설말뚝의 선단지지력 연구)

  • Lee, Jae-Hwan;Cho, Hoo-Yeon;You, Kwang-Ho;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.1
    • /
    • pp.29-39
    • /
    • 2012
  • The maximum unit point resistance ($q_{max}$) of rock socketed drilled shafts subjected to axial loads was investigated by a numerical analysis. A 3D Finite Difference Method (FDM) analysis and a Distinct Element Method (DEM) analysis were performed with varying rock elastic modulus (E), discontinuity spacing ($S_j$), discontinuity dip angle ($i_j$), and pile diameter (D). Based on the results of obtained, it was found that the ultimate point resistance ($q_{max}$) increased as rock elastic modulus (E) and rock discontinuity spacing ($S_j$) increased. But, it was found that $q_{max}$ decreased as pile diameter (D) increased. As for the influence of the dip angle of rock discontinuity ($i_j$), it was shown that $q_{max}$ decreased up to 50% of maximum value within the range of $0^{\circ}$ < $i_j$ < $60^{\circ}$ due to the shear failure at rock discontinuities. Furthermore, it was found that if $20^{\circ}{\leq}i_j{\leq}40^{\circ}$, influence of $i_j$ should be taken into account because $q_{max}$ tended to approach a minimum value as $i_j$ approached a value near the friction angle of the discontinuity (${\phi}_j$).

Development of Improvement Effect Prediction System of C.G.S Method based on Artificial Neural Network (인공신경망을 기반으로 한 C.G.S 공법의 개량효과 예측시스템 개발)

  • Kim, Jeonghoon;Hong, Jongouk;Byun, Yoseph;Jung, Euiyoup;Seo, Seokhyun;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.9
    • /
    • pp.31-37
    • /
    • 2013
  • In this study installation diameter, interval, area replacement ratio and ground hardness of applicable ground in C.G.S method should be mastered through surrounding ground by conducting modeling. Optimum artificial neural network was selected through the study of the parameter of artificial neural network and prediction model was developed by the relationship with numerical analysis and artificial neural network. As this result, C.G.S pile settlement and ground settlement were found to be equal in terms of diameter, interval, area replacement ratio and ground hardness, presented in a single curve, which means that the behavior pattern of applied ground in C.G.S method was presented as some form, and based on such a result, learning the artificial neural network for 3D behavior was found to be possible. As the study results of artificial neural network internal factor, when using the number of neural in hidden layer 10, momentum constant 0.2 and learning rate 0.2, relationship between input and output was expressed properly. As a result of evaluating the ground behavior of C.G.S method which was applied to using such optimum structure of artificial neural network model, is that determination coefficient in case of C.G.S pile settlement was 0.8737, in case of ground settlement was 0.7339 and in case of ground heaving was 0.7212, sufficient reliability was known.

An Experimental Study on the Load-settlement Behavior and Settlement-reducing Effect of the Disconnected Piled Raft Foundation (말뚝보강기초의 하중-침하량 거동 및 침하감소효과에 대한 실험적 연구)

  • Lee Yeong-Saeng;Hong Seung-Hyeun
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.4
    • /
    • pp.95-104
    • /
    • 2006
  • For the interests in the economical and safe design of foundation system, the concern on the piled raft or disconnected piled raft foundation system is increasing now. In this study, the behavior and the effects of the disconnected piled raft foundation not studied actively in this country were examined using the triaxial compression tests in place of laboratory model tests. The triaxial test samples were prepared with Jumunjin standard sand and the carbon rods, which simulate the ground soil and piles respectively. After the sample in which carbon rods were arranged was laid inside the triaxial chamber, the confining pressure was applied and then loading test was conducted. To analyze the reinforcing effects of the disconnected piled raft foundation, a few number of tests were carried out by changing the number, the diameter and the length of the model piles. As a result of this study, in the disconnected piled raft foundation system, even though the number of pile is few and the diameter of pile is small, the settlement of the foundation system decreased greatly.

Mechanical and Hydraulic Stabilizing Method of Steel Pipe Propulsion Tunneling Using Liquid Nitrogen (액체질소를 이용한 강관압입공법의 역학적 수리학적 안정화공법)

  • Ji, Subin;Lee, Kicheol;Lee, Ju-hyung;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.3
    • /
    • pp.57-66
    • /
    • 2016
  • In this study, to prevent possible collapse caused by hydraulic or mechanical instability, liquid nitrogen injection method is developed and implemented at the tip of drilling auger of steel pipe propulsion tunneling. In this study, 1/5-scale model auger and sand chamber were manufactured. The prototype diameter of steel pile (or casing) is assumed about 1,000 mm. For the frictional sandy soils and plastic weathered soils, liquid nitrogen injection methods were tested varying water contents of the soils. For the induced hydraulic instability, the ground near the drilling auger was frozen within approximately 5 minutes preventing mechanical collapse and water infiltration. Securing stability of steel pile propulsion tunneling using liquid nitrogen was much more effective for which the water content of the soil somewhat exceeds the optimum water content.

A Study on Design of Earth-Retaining Structure Constructed by a Row of Bored Piles (주열식(柱列式) 흙막이벽(壁)의 설계(設計)에 관한 연구(研究))

  • Hong, Won Pyo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.2
    • /
    • pp.11-18
    • /
    • 1985
  • A row of bored piles has been used in several excavation works to retain the earth. This excavation bracing system has much effect on low-vibration and low-noise during construction. The system is also effective to provide protection to the adjacent existing ground and structures. For the purpose of establishment of a logical design method for the bored piles, first, a theoretical equation to estimate the resistance of piles is derived. Because arching action of soils between piles is considered in the equation, the characteristics of soils and the installation condition of piles would be considered logically from the beginning. Then a method is investigated to decide the interval ratio of piles. According to the method, the interval between piles can be decided from the information of the Peck's stability number, the coefficient of lateral earth pressure and the internal friction angle of soil. Finally, a design method is presented for the bored piles used for excavation work. In the presented design method, such factors as depth of excavation, pile diameter, interval between piles, pile length below bottom of excavation and pile stiffness, can be selected systematically.

  • PDF

Analysis of Load Sharing Ratio of Piled Raft Foundation by Field Measurement (현장 계측을 통한 말뚝지지 전면기초의 하중분담률 분석)

  • Jeong, Sang-Seom;Lee, Jun-Hwan;Park, Jong-Jeon;Roh, Yang-Hoon;Hong, Moon-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.8
    • /
    • pp.41-52
    • /
    • 2017
  • In this study, field measurements were investigated to analyze the load sharing ratio and behavior of piled raft foundation. The field measurements were performed for about 300 days from the start of construction. The geometry of the raft is $3.1m{\times}3.1m$, and the pre-cast and pre-bored pile is 23 m in length and 0.508 m in diameter. Based on the field measurements, the load-settlement relationship of the piled raft foundation was obtained, and the load sharing ratio of the pile was converged to 70% at ultimate loading condition. The load sharing ratio of the pile increased as the settlement increased, and this is because the surface friction of the weathered soil, which is at the lower ground, was significantly increased. Based on the results of the field measurements, load transfer curves were obtained and applied to a numerical analysis by using load transfer method.

A Study on the Pullout Behavior of Shear Connectors which Fix the Additional Wall to the PHC-W Piles in the PHC-W Type Permanent Building Retaining Wall (PHC-W 흙막이를 활용한 건축영구벽체에서 PHC-W말뚝과 증설벽체를 합벽시키는 전단연결재의 인발거동에 관한 연구)

  • Jin, Hong-min;Kim, Sung-su;Choi, jeong-pyo;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.107-113
    • /
    • 2017
  • Shear Connector should be used to fix the PHC pile with extension wall in order to utilize PHC-W retaining wall as permanent wall. The pullout behaviours on shear connectors anchored into PHC-W pile were observed as two modes. The first type behaviour showed that after reaching the maximum pullout resistance, the anchorage was broken and shear connector was pulled out abruptly. The second type behaviour showed that even after arriving the maximum pullout resistance, the anchorage was not destroyed and there was a progressive increase in pullout displacement. The maximum pullout resistance of the steel anchor shear connector is larger than that of deformed bar shear connector. The larger the diameter and the longer the embedment length of shear connector, the higher the maximum pullout resistance would be. The pullout displacements corresponding to the maximum pullout resistance of the shear connector showed various ranges regardless of the materials, the diameters and the anchoring lengths. A-D20 shear connectors showed a pull-out displacement of about 8~10 mm. A-D16, D-D19 and D-D16 shear connectors exhibited a pulling displacement of about 14~20 mm, but a pulling displacement of about 6~10 mm when the anchoring lengths were 50 and 80 mm.