• Title/Summary/Keyword: Permanent drainage method

Search Result 19, Processing Time 0.028 seconds

A Study on the Application of Vertical Drainage System for Resisting Uplift of Sub-structure (지하구조물 부력방지를 위한 연직배수시스템의 적용성 연구)

  • Chun, Byung-Sik;Yeoh, Yoo-Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.2
    • /
    • pp.183-190
    • /
    • 2001
  • A sub-structure is uplift if the floating greater than dead load of a structure. When such occasion arise, a structure sustain damage. In general, the measures for floating prevention of structure are a permanent anchor method and a drainage method. The primary construction cost of a permanent anchor method is heavy. And a drainage method is needed maintenance management long term. At this point, the measures for floating prevention of a notion being requires the other days. Therefore, at this study a simple construction and a economic vertical drainage system was developed. The findings be used in the in-situ and gave careful consideration to an application. The result of examination, this system considering a characteristic of coefficient of permeability for the ground controls occurrence of floating despite the water level rise of the ground, which a period of construction get shorter compared with other methods, which understood that measures satisfactory in the financial aspect. Especially, A structure occurring effects of flatting under the course of construction made use of it. As the result of the effect of it was confirmed by construction.

  • PDF

A Study on the Evaluation Process Development for the Use of Outflowing Groundwater in Large-Scale Buildings (대형건축물의 유출지하수 활용을 위한 평가 프로세스구축에 관한 연구)

  • Kim, Jae-Yeob;Lee, Dong-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.91-97
    • /
    • 2010
  • Recently, as a countermeasure to the buoyancy of a building, the use of permanent drainage methods have been on the increase, and these provide benefits both in terms of economical feasibility and efficiency. When a permanent drainage method is applied, some underground water can drain out. Korea has been designated by PAI (Population Action International) as a water-stressed country, and the use of outflowing groundwater is required for the efficient oversight of water resources. However, the evaluation process on the practical use of underground water is currently insufficient. Therefore, the amount of outflowing groundwater put to practical use and the standard for the water quality were examined in this research, with the aim of establishing anappraisal process on the practical use of underground water drainage. In addition, standards for the assessment of the treatment process and the application cost of underground water drainage were developed. On this basis, an evaluation process on the use of outflowing groundwater was developed and applied inthe field. The application result proved that it was possible to assess the initial investment cost and the maintenance and management cost in the field, and thesecan be compared to the costs when supplied water is used, which makes it possible to apply in the field.

Applicability examinations of induced drainage system for reduction of uplift pressure in underpass structures: Numerical study (지하차도 부력저감을 위한 유도배수공법의 적용성 검토: 수치해석적 연구)

  • Jo, Seon-Ah;Jin, Gyu-Nam;Sim, Young-Jong;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.123-134
    • /
    • 2013
  • Urban underground structures at low ground elevations (i.e. shallow substructures) unlike typical tunnel structures are subjected to low overburden and high water pressures. This often causes the underground structures to become damaged. Various conventional methods for the urban underpass structures such as dead weight increasement, round anchors, and tension piles, are significantly conservative and provok concerns about the costly, time-consuming installation process. Recently, permanent drainage system becomes to widely use for supplementing the conventional method's shortcomings, but, it is applied without the considerations for ground conditions and water table. In this study, therefore, numerical analyses are performed with various parameters such as groundwater level, wall height, and ground conditions in order to establish design guidelines for induced drainage system which is a kind of the permanent drainage method constructed at the Y-area. According to the numerical results, the induced drainage system is very effective in reducing the uplift pressure that acts on the base of underpass structures.

Clinical outcomes of permanent stenting with endoscopic ultrasound gallbladder drainage

  • Eisuke Suzuki;Yuji Fujita;Kunihiro Hosono;Yuji Koyama;Seitaro Tsujino;Takuma Teratani;Atsushi Nakajima;Nobuyuki Matsuhashi
    • Clinical Endoscopy
    • /
    • v.56 no.5
    • /
    • pp.650-657
    • /
    • 2023
  • Background/Aims: Endoscopic ultrasound gallbladder drainage (EUS-GBD) is gaining attention as a treatment method for cholecystitis. However, only a few studies have assessed the outcomes of permanent stenting with EUS-GBD. Therefore, we evaluated the clinical outcomes of permanent stenting using EUS-GBD. Methods: This was a retrospective, single-center cohort study. The criteria for EUS-GBD at our institution are a high risk for surgery, inability to perform surgery owing to poor performance status, and inability to obtain consent for emergency surgery. EUS-GBD was performed using a 7-Fr double-pigtail plastic stent with a dilating device. The primary outcomes were the recurrence-free rate of cholecystitis and the late-stage complication-avoidance rate. Secondary outcomes were technical success, clinical success, and procedural adverse events. Results: A total of 41 patients were included in the analysis. The median follow-up period was 168 (range, 10-1,238) days. The recurrence-free and late-stage complication-avoidance rates during the follow-up period were 95% (38 cases) and 90% (36 cases), respectively. There were only two cases of cholecystitis recurrence during the study period. Conclusions: EUS-GBD using double-pigtail plastic stent was safe and effective with few complications, even in the long term, in patients with acute cholecystitis.

A Case Study on Collapse and Reinforcement of Cut-slope in Gyeong-Nam Dae-Hap (경남 대합지구 절취사면의 붕괴 및 보강대책에 관한 사례연구)

  • Lee, Jin-Kwon;Park, Choon-Sik;Jang, Jeong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.703-710
    • /
    • 2006
  • The objective of this study is to acquire stabilization of collapse of cut-slope in Chang-Nyung, Gyeong-Nam. The following shows the results of this study. We applied a reinforcement method with the latticed beam $(0.50\times0.50)$ + permanent anchor($PC\;6\times\phi12.7mm$, Ta = 50.0t/EA, etc 3.0m), and fill gravels(D=35cm) in the latticed beam. We attenuated the slope (1:2.0), and stabilized the slope pace by ASANA method. We planned a drainage way(U-type, $0.40\times0.40$) in order to prevent surface water from inflowing into underground.

  • PDF

NORMAL ERUPTION GUIDANCE OF UNERUPTED PERMANENT TEETH ASSOCIATED WITH DENTIGEROUS CYST BY DECOMPRESSION : 5 CASES REPORT (함치성 낭종과 관련된 미맹출 영구치의 감압술을 이용한 정상 맹출유도 : 증례보고)

  • Kim, So-Mi;Chung, Seung-Won;Cha, In-Ho;Nam, Woong
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.35 no.4
    • /
    • pp.271-275
    • /
    • 2009
  • The purpose of this report is to describe a treatment method of dentigerous cyst associated with unerupted permanent teeth in mixed dentition patients. In our cases, extraction of infected primary teeth was followed by decompression of the cyst. At the same time, parts of the cystic walls were sent for histopathological examination. Decompression was performed by inserting a rubber tube into the cystic cavity through the extraction socket. The cystic cavity was kept open by means of vigorous use of a syringe by patient. Postoperative panoramic radiograph was taken bimonthly. After $5{\sim}12$ months, the impacted permanent teeth were erupted on the desired position. All cases presented favorable result. By extracting the infected primary teeth, and opening the cyst for continuous drainage, it was possible to achieve spontaneous eruption of the involved permanent teeth into the proper position. In all our cases, there was no sign or symptom of recurrence of the cyst up to postoperative 18 months.

A Flood Damage Preventation and Permanent Restoration Method (수해 예방과 항구적인 복구 방안)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.32 no.6
    • /
    • pp.94-99
    • /
    • 1999
  • Recently, flood damage is rapidly increasing because of warming of globe, urbanization and industrialization. As a countermeasure to prevent these flood damages, it is quite required to extend the flood control ability by improving the objective rivers in the watershed and building more medium to large scale reserviors. Simultaneously repairing and rehabilitation of facilities through the safety diagnosis for reinforcement of the facilities should be continuously proceeded. Also extensive implementation of drainage improvement, establishment of prevention and refairing system against flood damage and raise of accuracy of weather forecasting should be proceeded.

  • PDF

The Improvement Method of Railway Roadbed (철도노반의 개량방법)

  • Sim Jae-Bum
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.621-626
    • /
    • 2005
  • A major part of permanent way maintenance effort is justified by inadequacies in the track substructure and in particular in drainage conditions, which need to be put right across the entire network. In most cases nowadays, improvements of the substructure can be carried out on rail to a high standard of quality. However, this entails substantial movements of material for the removal of spoil and provision of new material. In the future, recycling of old material on site, and use of geosynthetics, will be necessary to help considerably reduce this volume.

  • PDF

Study on the Application of Press in Steel Pipe Pile for Restoring Building of different settlement (부동침하 건축물 복원을 위한 압입강관파일 공법 현장 적용에 관한 연구)

  • Sin, Jae-Kwon;Lee, Hee-Seok;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.85-86
    • /
    • 2015
  • Recently, As the high rise buildings have been demanded due to the rising current of land price, the permanent drainage method have been applied during and after the construction as a way to reduce the buoyancy acting on the bottoms of the foundations in the basement. This method has brought about the consolidation subsidence of the ground and turned out to be the problems of sinking hole and foundation re-settlement. The representative methods to be used for extending the life cycle of the existing building structure which is tilted by the foundation re-settlement or differential settlement of the foundation can be divided into the building structures reinforcement and soil reinforcement. The purpose of this study is to analyze and present the application example of steel pipe pile method to extend the life cycle of the six -stories building tilted in a soft ground.

  • PDF

A Study on the Groundwater Effects in the Design of Tunilel Lining (배수형 터널내 과다유입수가 터널의 안정에 미치는 영향)

  • Cheon, Byeong-Sik;Choe, Song-Am;Nam, Sun-Seong
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.125-140
    • /
    • 1995
  • Generally, the groundwater pressure is not considered in the design of concrete lining of bottom drainage tunnel. This design method implies that the phreatic surface is drawdown to the bottom of tullnel. When tile groundwater is continually supplied without changing of groundwater table, there is a possibility at which the groundwater pressure acting on the tunnel lining after the completion of tunnel. Therefore, the safety of tunnel lining must be checked in this case. In this paper, the stability of bottom drainage tunnel which is affected by groundwater discharge is analzed by using of the Finite Element Method at the 2 sections of subway where the groundwater level has a tittle change during the construction. As the result of analysis, the grouting for the water tightness and the permanent monitoring system of tunnel are required for maintaining of long-term stability of bottom drainage tunnel for the case of groundwater plassure acting on the tunnel lining is greater than that of design stage.

  • PDF