• Title/Summary/Keyword: Performance of IS Operations

Search Result 2,481, Processing Time 0.034 seconds

An analysis of the performance of global major airports using two-stage network DEA model (2단계 네트워크 DEA를 이용한 세계 주요 공항 성과 분석)

  • Yoo, Seuck-Cheun;Meng, Jie;Lim, Sungmook
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.1
    • /
    • pp.65-92
    • /
    • 2017
  • Purpose: The performance of global major airports is evaluated and several research questions are examined relative to the measures characterizing airport performance. Methods: The two-stage internal structure of airport performance is considered by decomposing it into physical operations and revenue generation. In the physical operations stage, operating costs, number of runways, terminal area and number of employees are used as inputs, while passenger throughput, cargo throughput and aircraft movements are taken as outputs. Subsequently, in the revenue generation stage, the outputs from the preceding stage are taken as inputs, while revenue is used as output. Results: Based upon this two-stage modeling of airport performance, a multiplicative two-stage network data envelopment analysis model is employed to calculate the overall and stage efficiencies of 59 airports using the recent data in the 2014 Airport Benchmarking Report published by the Air Transport Research Society. Several internal and external factors are also considered such as airport size, airport geographical location, proportion of international passengers, ownership (listed or not) and management style, and statistical analysis is performed to examine their impacts on airport performance. Conclusion: It is shown that the airports exhibit statistically significant difference across regions, and also some statistically significant factors affecting airport performance are identified.

Covariance Estimation and the Effect on the Performance of the Optimal Portfolio (공분산 추정방법에 따른 최적자산배분 성과 분석)

  • Lee, Soonhee
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.4
    • /
    • pp.137-152
    • /
    • 2014
  • In this paper, I suggest several techniques to estimate covariance matrix and compare the performance of the global minimum variance portfolio (GMVP) in terms of out of sample mean standard deviation and return. As a result, the return differences among the GMVPs are insignificant. The mean standard deviation of the GMVP using historical covariance is sensitive to the estimation window and the number of assets in the portfolio. Among the model covariance, the GMVP using constant systematic risk ratio model or using short sale restriction shows the best performance. The performance difference between the GMVPs using historical covariance and model covariance becomes insignificant as the historical covariance is estimated with longer estimation window. Lastly, the implied volatilities from ELW prices do not lead to superior performance to the historical variance.

Empirical Validation of Software Process Maturity on Organizational Performance (SW프로세스 성숙 수준이 기업성과에 미치는 영향에 관한 실증연구)

  • 김정욱;나미자;남기찬;박수용
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.3
    • /
    • pp.1-19
    • /
    • 2002
  • Recently, increasing attention has been paid to building a successful software process in Information System(IS) implementation. This study establishes software process model as a key predictor of organizational performance. We propose a theoretical framework for capability maturity model derived from the Software Engineering Institute(SEI). This paper identify the process-related variables, financial performance and non-financial performance from the relevant literature and clarify the concept of software process by distinguishing between its component and determinants. We then examine the impact of software process on organizational performance. Hypotheses on software process were tested for 36 enterprises including 118 organizational units. Results indicate that software process capability may serve as a key predictor of organizational performance. Software process maturity found to be positively influenced on the financial and non-financial performance, while investment of information technology as a mediating variable not significantly affected to the performance.

A Study on the Effects of Collaborative Supply Management on Buyer and Supplier Performance : From a View of Capabilities Transfer Throughout the Supply Chain (협력적 공급사슬관리가 참여기업 성과에 미치는 영향에 대한 연구 : 공급사슬 내 역량이전의 관점에서)

  • Lee, Su-Yol
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.34 no.3
    • /
    • pp.85-104
    • /
    • 2009
  • Managers have come to realized that a large and increasing amount of sources for a corporate competitive advantage can be found in their company's supply chain. At a fundamental level, there is a similar consensus that building a collaborative supply management is a more effective way of managing firms' supply chains. This paper is an attempt to examine the effects of collaborative supply management by probing a mechanism which shows how competences and/or performance are transferred from suppliers to markets through the supply chains. Research hypotheses regarding the relationships between collaborative supply management, supplier Performance, buyer internal performance (new product development and operational performance), and buyer market performance were empirically validated by utilizing a structural equation modeling analysis. The research result Indicates the positive impacts of a collaborative supply chain on supply performance as well as buyer internal and market performance, which also well illustrate how the improved competence and/or performance of suppliers engendered from the supplier-buyer collaboration flows throughout the entire supply chain.

A Study on the Method for Promoting Acceptance on Performance Management : Focusing on the Public Enterprises Practices (성과관리의 수용성 제고 방안 : 공기업사례를 중심으로)

  • Kim, Youn Sung;Yoo, Hong Sung;Kim, Sun Cheol
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.40 no.1
    • /
    • pp.185-198
    • /
    • 2015
  • This study drew performance management factors analyzed a causal link between acceptance and satisfaction of performance management to present the method for promoting acceptance on the performance management system that most of the public enterprises, government-affiliated organizations are implementing. To achieve this, qualitative analysis and quantitative analysis were conducted in parallel through in-depth case studies and surveys. The results of this study are as follows. First, the analysis of the performance management factors with preceding studies shows that performance management indicators, performance management operations and performance management communications. Second, from the causal relationship of performance management factors affecting performance management acceptance reveals that performance management operation has statistical significance. Third, the analysis of the effect of performance management factors on the management satisfaction shows that operation and indicator of the performance management have statistical significance and reflecting the performance indicators to business, adequacy of target level, training, system support and CEO's Leadership have been revealed as important variables to the management satisfaction. Fourth, the result of the analysis on casual connection between acceptance and satisfaction of the performance management shows that improving management acceptance has a direct impact on satisfaction because performance management receptiveness were deemed statistically significant. Fifth, the result of the in-depth case studies on improving performance management acceptance shows that public enterprises have been putting in an effort to design indicators and try to encourage internal member's involvement during the monitoring and evaluation. The quantitative analysis based on survey has turned out that performance management operation and performance management indicators have statistical significance. The qualitative analysis by in-depth analysis shows that public enterprises put a lot of effort to performance management indicators and communication between internal members. As a result, commitment to performance management operation is required to improve the performance management acceptance. In other words, a detailed implementation plan for training, information system support, and CEO's leadership has to be established and ought to be pushed.

한국 자동차 산업의 구매기업-공급기업간 관계 및 자산특유성과 공급기업의 성과에 관한 연구

  • 서윤주;류춘호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.83-86
    • /
    • 1998
  • In many industries, competitive advantage is rapidly shifting to the management of suppliers. Especially, in the automotive industry, suppliers' manufacturing performance influences the quality of automobiles which are assembled by motor companies. This study seeks to identify dominant types of buyer-supplier relationships and to examine suppliers' performance difference according to types of buyer-supplier relationships. The findings indicate that the supplier's production performance in the cooperative relationship is higher than that of the suppliers in the other relationships. And then this study examines the relationships between interfirm asset specificity and suppliers' performance. The findings indicate that the greater the interfirm human asset cospecialization and physical asset specialization, the higher the supplier's market and production performance.

  • PDF

Performance Evaluation Model for Future Weapon Systems (미래무기체계의 성능평가모형)

  • 김의환;최규명;정창모;김종윤
    • Journal of the military operations research society of Korea
    • /
    • v.23 no.2
    • /
    • pp.15-24
    • /
    • 1997
  • In this paper we suggested a performance evaluation model for future weapon systems. Weapon Performance Index(WPI) model transform the characteristics of alternatives as indices. We can easily obtain WPIs of alternatives with the model. The highest WPI recommended as the best solution. The performance elements in hierachy for future weapon systems are determined by systems engineering procedure. Priorities in hierachy can be determined through survey of experts engineering procedure. Priorities in hierachy can be determined through survey of experts and statistical analysis. Utility function is formulated as a probability model and utility score is predicted on the basis of historical data about the same category of weapon systems in the world. WPI is calculate from sum of product of priorities and utility scores. The model can be applied to trade-off analysis, cost and effectiveness analysis, war game model.

  • PDF

A Study of Implementing Efficient Rotation for ARX Lightweight Block Cipher on Low-level Microcontrollers (저사양 마이크로 컨트롤러에서 ARX 경량 암호를 위한 효율적인 Rotation 구현 방법 연구)

  • Kim, Minwoo;Kwon, Taekyoung
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.3
    • /
    • pp.623-630
    • /
    • 2016
  • Heterogeneous IoT devices must satisfy a certain level of security for mutual connections and communications. However, a performance degradation of cryptographic algorithms in resource constrained devices is inevitable and so an optimization or efficient implementation method is necessary. In this paper, we study an efficient implementation method for rotation operations regarding registers for running ARX lightweight block ciphers. In a practical sense, we investigate the performance of modified rotation operations through experiments using real experiment devices. We show the improved performance of modified rotation operations and discover the significant difference in measured performance between simulations and real experiments, particularly for 16-bit MSP microcontrollers.

A study on the development of the nuclear R&D performance monitoring system (원자력연구개발 목표관리시스템 개발)

  • 박준원;최현호;원병출
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.217-220
    • /
    • 1996
  • This study presents a R&D performance monitoring system (RDMS) that is applicable for managing nuclear program in KAERI. The prime goal of RDMS is to furnish project manager with reliable and accurate information on status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. In this study, the work breakdown structure (WBS) as the governing factor for integration of scope, schedule, resource data was derived, and the above parameters were loaded personal computer. A RDMS is comprised of about 12,000 R&D activities of the 16 goverment-led projects. The Primavera software was used to monitor the progress, evaluate the performance and analyze the resource distribution to activities.

  • PDF

The Operating Structure of Multiple Incentive Contracts : Emphasis on Structuring with the Performance Incentives (다차원 유인부 계약의 운영구조 -성과유인의 구조화를 중심으로-)

  • Kim, Chung-Bon
    • Journal of the military operations research society of Korea
    • /
    • v.6 no.1
    • /
    • pp.79-92
    • /
    • 1980
  • In cost-only incentive contract the emphasis is the attainment of efficient and effective cost control. In contrast multiple incentives contract correlates contractor's profit motives with the generalized government objective function, the decision variables of which are performance or quality (technical progress), time or schedule (timely development and delivery) and the cost (efficient and effective cost control) Under multiple incentive structure, it is essential to formulate the trade-off curves between cost and performance, which are called iso-fee curves. Trade-off curves depict the combination of cost and performance achievement for which the contractor will be rewarded with the same fee. The basic function of trade-off curves is to show he the contractor will be motivated by incentive arragement to trade off or sacrifice the achievement in one incentive element for the acnievment in another.

  • PDF