• 제목/요약/키워드: Performance measurement systems

검색결과 1,424건 처리시간 0.033초

공정능력과 시그마 수준의 표시에 대한 연구 : 다수 위치측정에 대한 공정능력지수 기준 (A Study on Expression of Process Capability and Sigma Level)

  • 이도경
    • 산업경영시스템학회지
    • /
    • 제32권1호
    • /
    • pp.111-116
    • /
    • 2009
  • Process capability indices have been widely used in manufacturing industries to provide a quantitative measure of process performance. PCIs have been developed to represent process capability more exactly. In the previous studies, only one designated location on each part has been measured. But multiple measurement locations on each part are required to calculate the reliable process capability. In this paper, we propose a new process capability index dealing the multiple measurement locations on each part. Also we showed the relationship between the new index and sigma level according to the number of measurement locations.

측정지연이 있는 ROT 공정의 외란제거를 위한 SPDR 제어기 설계 (SPDR Scheme for Disturbance Reduction in ROT Process with Measurement Delay)

  • 박철재
    • 제어로봇시스템학회논문지
    • /
    • 제20권10호
    • /
    • pp.1023-1029
    • /
    • 2014
  • In this paper, we propose an SPDR (Smith Predictor for Disturbance Reduction) scheme to improve the temperature control by reduction of the disturbance in ROT process with measurement delay. The proposed controller is a combination of Astrom's modified Smith predictor with a disturbance reduction controller and a grey predictor. The grey prediction is used to calculate the inverse of the measurement delay and to predict future variations and tendencies of system output. The simulation results demonstrate the successful performance of the proposed disturbance reduction controller and enhance the robustness of the proposed control scheme.

인터페로미터 방향 탐지기의 디지털 위상차 측정 기법 성능 분석 (Performance Analysis on Digital Phase Difference Measurement Techniques for Interferometer Direction Finder)

  • 강종진;박성균;노지현
    • 한국정보통신학회논문지
    • /
    • 제22권8호
    • /
    • pp.1076-1082
    • /
    • 2018
  • 본 논문은 서로 다른 안테나로부터 수신되는 무선 신호의 위상차를 계산하여 신호의 도래방향을 측정하는 인터페로미터 방향 탐지 장치에 관한 것이다. 최신의 전자전용 방향 탐지기는 위상차 측정에 있어서 온도에 따른 위상측정 편차가 작고, 낮은 신호 대 잡음비 환경 에서도 비교적 위상측정 성능이 우수한 디지털 위상차 측정 방법이 적용되고 있다. 시스템에서 요구되는 방향 탐지 정확도 성능 달성을 위한 위상차 측정 허용 오차를 도출하고, 디지털 위상차 측정 방법에 대하여 소개하였다. 샘플 개수, 신호 대 잡음비, 간섭신호 유입에 따른 성능을 정량적으로 분석하였고, 시뮬레이션을 통하여 주파수 영역 측정방법이 시간영역 대비 낮은 SNR 및 간섭신호 유입 환경에서 더 좋은 성능을 보임을 확인하였다. 제안한 방법은 인터페로미터 방향 탐지 장치의 성능 결정에 활용 할 수 있을 것이다.

국방연구개발 프로젝트의 기술적 성과 측정.분석 프로세스 구현방안과 도구 개발 (Technical Performance Measurement & Aanaysis Process Implementation Method and Tool Development of The Defense R&D Project)

  • 유이주;박영원
    • 한국군사과학기술학회지
    • /
    • 제11권3호
    • /
    • pp.76-88
    • /
    • 2008
  • The purpose of the research is to propose an earned-value indicator for technical performance measurements of an ongoing defense R&D project and the associated measurement, analysis and the implementation process for data collection and usages. Furthermore, the study demonstrates the evidences of benefits and validity of the proposed approach through the enabling tool development and its application examples.

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • 제5권4호
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

이해당사자별 정보시스템 사용의 우선순위 분석에 대한 연구 (A Study on the Priority Analysis of Information Systems by Stakeholders)

  • 경태원;이지영;김상국
    • 정보학연구
    • /
    • 제12권2호
    • /
    • pp.13-29
    • /
    • 2009
  • ERP in the past, primarily centering on large enterprises and the introduction of competition in the global e-business, but along with the proliferation of small and medium-sized enterprises are now in earnest, or to take advantage of the introduction of the ERP plan. However, the introduction of the ERP cost and the effort required to develop, because many never previously introduced ERP expect that the introduction of cost and performance comparisons with the measurement is necessary. Until now, however, the introduction of a framework of analysis followed the introduction of ERP primarily to measure performance of a major improvement. This research, in addition to improving the performance of these tasks have been overlooked until now for the system's user satisfaction BSC (Balanced Scorecard) models and techniques using AHP-specific understanding of the Company (Group executives, middle managers groups, and user groups) Importance of priorities you want to analyze. In summary, the key findings of this study follows. First, ERP user satisfaction measurement for the balanced scorecard indicators in terms of the redevelopment. Second, the information system user satisfaction to the user layer (Layer 3), grouped by the measure. Thirdly, the user satisfaction of the important topics for attention as quantified by measuring the hierarchy. This model is for satisfaction levels as quantitative of future users of the new system, information systems and the introduction of a new model of development based on the evaluation data will be able to take advantage of.

  • PDF

Numerical and Experimental Analyses of a Hot-Wire Gas Flowmeter

  • Kim, Byoung-Chul;Joung, Ok-Jin;Kim, Young-Han
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.1201-1206
    • /
    • 2003
  • A measurement device for gas flow rate using hot-wire module is developed for the utilization in low-accuracy industrial applications. The module has three wires of measuring and heating, and a bridge circuit is installed to detect electric current through the wire in the module. An amplification of the signal and conversion to digital output are conducted for the online measurement with a personal computer. In addition, temperature distribution in the module is numerically analyzed to examine the measured outcome from the module experiment. The flow rate of air and carbon dioxide gas is separately measured for the performance examination of the device. The experimental relation of measurement and flow agrees with the prediction from the numerical analysis. The outcome of the performance test indicates that the accuracy and reproducibility of the module is satisfactory for the purpose of industrial applications.

  • PDF

BSC/DEA를 활용한 기업 연구개발 프로젝트 성과평가 (Performance Evaluation of Private R&D Projects using BSC/DEA)

  • 전익진;이학연
    • 경영과학
    • /
    • 제34권2호
    • /
    • pp.67-83
    • /
    • 2017
  • This paper proposes a R&D project performance measurement model for private firms combining balanced scorecard (BSC) and data envelopment analysis (DEA). The efficiency of R&D projects is measured in terms of each of the three perspectives of BSC by using DEA : the internal process perspective (DEA-P), the customer perspective (DEA-C), and the financial perspective (DEA-F). The performance indicators of the three perspectives of BSC are considered as outputs of the corresponding DEA models. To provide strategic implications for R&D planning, we also propose the R&D project performance matrices composed of two different types of efficiency dimensions. The proposed model is expected to be fruitfully utilized for R&D performance measurement of private firms.

인돌렌-메탄올 대체연료의 연료 특성과 엔진성능에 관한 연구 (A Study on the Fuel Characteristics and Engine Performance of Indolene - Methanol Alternative Fuel)

  • 이민호;오율권;차경옥
    • 한국분무공학회지
    • /
    • 제9권4호
    • /
    • pp.9-16
    • /
    • 2004
  • A study of the propeny and performance effect of Indolene - Methanol Plus High Alcolhols (MPHA) has been completed. This study invested the measurement of fuel properties and performance parameters. The fuel properties investigated are distillation characteristics, heating valuer flash point, specific gravity and water tolerance. The performance parameters measured are minimum advance for best torque (MBT) spark timing, power output. The alcohol concentration was varied from 0 to 100 percent by volume in clear Indolene. The measurement of fuel properties indicated that, in general, Indolene - MPHA blends have higher water tolerance, similar specific gravity, similar flash point and different distillation characteristics compared to Indolene - Methanol blends. The performance parameters were measured using a single cylinder spark ignition engine at different compression ratios. The results of the performance measurements indicated that Indolene - MPHA blends have a higher MBT spark advance, similar power output.

  • PDF

제조협업 성과분석을 위한 협업 프로세스 웨어하우스 개발 (Development of Collaborative Process Warehouse for Analyzing Performance of Manufacturing Collaboration)

  • 김규리;김애경;김상국;정재윤
    • 산업공학
    • /
    • 제25권1호
    • /
    • pp.71-78
    • /
    • 2012
  • Most manufacturing companies participate in various types of active collaboration to enhance competitive advantages in their arenas. In this paper, we introduce a data warehouse system that is designed for manufacturing collaboration. Just as enterprise information systems, collaboration support systems also need functions of performance measurement and monitoring. For this reason, we devise a new approach to measuring and evaluating performance of manufacturing collaboration. Specifically, we first present a concept of process warehouses for manufacturing collaboration. Next, we design a data schema of collaborative process warehouses to store and monitor collaboration performances. Finally, we implement a prototype system to support performance management of manufacturing collaboration. The proposed system can be used to effectively maintain and continuously improve collaboration in manufacturing industry.