• Title/Summary/Keyword: Performance and Reliability Evaluation

Search Result 858, Processing Time 0.032 seconds

A study on the mass production performance evaluation of servomotors for manufacturing robots (제조 로봇용 서보모터의 양산성능 평가 연구)

  • Ryu, K.H.;Lee, T.H.;Park, J.W.;Kwon, H.S.;Kang, B.S.
    • Journal of Drive and Control
    • /
    • v.19 no.4
    • /
    • pp.91-96
    • /
    • 2022
  • The performance and reliability of foreign servomotors and domestic servomotors for manufacturing robots were compared and verified. The mass productivity was confirmed by satisfying the requirements of the demanding companies. The servomotor was designed in consideration of mass productivity while satisfying the requirements of the demanding company. It was mounted on a real robot to check its performance and reliability. To secure mass-production performance, we designed and manufactured easy-to-manufacture parts and jigs to manufacture servomotors and achieved the goal of the mass-production evaluation of servomotors through individual performance evaluation, robot mounting test evaluation, and supplementation.

Design of Reliability Qualification Test Based on Performance Distribution at the Earlier Stage (초기 단계의 성능분포를 활용한 신뢰성 인증시험의 설계)

  • Jeong, Hai-Sung
    • Journal of Applied Reliability
    • /
    • v.12 no.3
    • /
    • pp.131-138
    • /
    • 2012
  • A design of reliability qualification test based on performance distribution is developed. In general, the performance of an item degrades as the time goes by and the failure of an item occurs when the performance degradation reaches the pre-determined critical level. This article considers the reliability qualification test based on a more tightened critical value at the earlier stage to reduce the evaluation testing time and cost. A numerical example is provided to illustrate how to use the developed reliability qualification test.

Development of a Task Performance Evaluation Instrument for Clinical Nurses (임상간호사의 업무수행 평정도구개발)

  • Paik, Hyun-Ok;Han, Sang-Sook;Lee, Sang-Chul
    • Journal of Korean Academy of Nursing
    • /
    • v.35 no.1
    • /
    • pp.95-103
    • /
    • 2005
  • Purpose: The purpose of this study was to develop an instrument of task performance evaluation for clinical nurses, thus testing the validity and the reliability of the scale. Method: Data was collected from 84 Head Nurses and 255 General Nurses. A conceptual framework, composed of 4 factors of meaning in task performance evaluation, was identified through review of the relevant literature. A total of 78 items were developed and were used on a five-point likert scale. Through factor analysis, items whose factor loading was below 0.50 were deleted, thus 35 items remained. To test the validity and reliability of the instrument, the SPSS 11.0 windows program was used. Result: The results of the factor analysis indicated that 4 factors were classified and the cumulative percent of variance was 67.54%. The results of the reliability test indicated that Cronbach's coefficient of the total 35 items was over 0.9176. The results of the factor analysis indicated that factor loadings of all items was over 0.50. Conclusively, the validity and the reliability of the scale were proven. Conclusion: This study was identified as a tool with a high degree of reliability and validity.

On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System (철도 신호제어 시스템의 AHP 기법 적용을 통한 성능평가 대상설비 항목 개선 및 안전성 확보에 관한 연구)

  • Hwang, Sunwoo;Kim, Joouk;Kim, Youngmin;Kim, Hyungchul;Lee, Soohwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.71-79
    • /
    • 2021
  • The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.

The criterion of reliability evaluation and the evaluation facility for composite insulator (폴리머 애자 신뢰성평가 기준 제정 방향 및 평가설비 구축)

  • Kim, I.S.;Kim, M.K.;Kim, I.K.;Kang, D.P.;Park, H.Y.;Han, D.H.;Shin, Y.J.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.147-148
    • /
    • 2001
  • The construction of reliability evaluation according to their fields was promoted under the supervision of Agency for Technology and Standards for establishing the relevant institution & infrastructure that can fundamentally solve the reliability problems, the biggest obstruction when the developed electric components & materials come into the market. This paper describes the criterion of reliability evaluation and the evaluation facilities for the purpose of heightening the reliability of composite insulator estimated as the new material among the electric components & materials. We will understand the criterion of reliability evaluation with two parts as the performance evaluation based on various kinds of standards (especially IEC) and as the long-term reliability evaluation utilizing the accelerated aging & flashover test methods. Therefore we aim for constructing the criterion of reliability evaluation as the foundation for evaluation so as to support the industrial group based on KERI facilities.

  • PDF

Performance Analysis of Consensus Algorithm considering NFT Transaction Stability (NFT 거래 안정성을 고려한 합의알고리즘 성능분석)

  • Min, Youn-A;Lim, Dong-Kyun
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.2
    • /
    • pp.151-157
    • /
    • 2022
  • In this paper, the performance of various blockchain consensus algorithms was compared and analyzed as a method to increase the transaction cost and processing time during NFT transactions and to increase the transaction stability requirements that occur during smart contract execution. Network reliability and TPS are evaluation items for performance comparison. TPS and the stability of the Consensus algorithm are presented for three evaluation items. In order to establish a standardized expression for each evaluation item, the reliability of the node and the success rate of the smart contract were considered as variables in the calculation formula, and the performance of the consensus algorithm of the three groups, PoW/PoS, Paxos/Raft and PBFT, was compared under the same conditions. / analyzed. As a result of the performance evaluation, the network reliability of the three groups was similar, and in the case of the remaining two evaluation items, it was analyzed that the PBFT consensus algorithm was superior to other consensus algorithms. Through the performance evaluation equations and results of this study, it was analyzed that when the PBFT consensus processing process is reflected in the consensus process, the network reliability can be guaranteed and the stability and economic efficiency of the consensus algorithm can be increased.

An efficient simulation method for reliability analysis of systems with expensive-to-evaluate performance functions

  • Azar, Bahman Farahmand;Hadidi, Ali;Rafiee, Amin
    • Structural Engineering and Mechanics
    • /
    • v.55 no.5
    • /
    • pp.979-999
    • /
    • 2015
  • This paper proposes a novel reliability analysis method which computes reliability index, most probable point and probability of failure of uncertain systems more efficiently and accurately with compared to Monte Carlo, first-order reliability and response surface methods. It consists of Initial and Simulation steps. In Initial step, a number of space-filling designs are selected throughout the variables space, and then in Simulation step, performances of most of samples are estimated via interpolation using the space-filling designs, and only for a small number of the samples actual performance function is used for evaluation. In better words, doing so, we use a simple interpolation function called "reduced" function instead of the actual expensive-to-evaluate performance function of the system to evaluate most of samples. By using such a reduced function, total number of evaluations of actual performance is significantly reduced; hence, the method can be called Reduced Function Evaluations method. Reliabilities of six examples including series and parallel systems with multiple failure modes with truncated and/or non-truncated random variables are analyzed to demonstrate efficiency, accuracy and robustness of proposed method. In addition, a reliability-based design optimization algorithm is proposed and an example is solved to show its good performance.

Seismic reliability evaluation of steel-timber hybrid shear wall systems

  • Li, Zheng;He, Minjuan;Lam, Frank;Zhou, Ruirui;Li, Minghao
    • Earthquakes and Structures
    • /
    • v.13 no.3
    • /
    • pp.289-297
    • /
    • 2017
  • This paper presents seismic performance and reliability evaluation on steel-timber hybrid shear wall systems composed of steel moment resisting frames and infill light frame wood shear walls. Based on experimental observations, damage assessment was conducted to determine the appropriate damage-related performance objectives for the hybrid shear wall systems. Incremental time-history dynamic analyses were conducted to establish a database of seismic responses for the hybrid systems with various structural configurations. The associated reliability indices and failure probabilities were calculated by two reliability methods (i.e., fragility analysis and response surface method). Both methods yielded similar estimations of failure probabilities. This study indicated the greatly improved seismic performance of the steel-timber hybrid shear wall systems with stronger infill wood shear walls. From a probabilistic perspective, the presented results give some insights on quantifying the seismic performance of the hybrid system under different seismic hazard levels. The reliability-based approaches also serve as efficient tools to assess the performance-based seismic design methodology and calibration of relative code provisions for the proposed steel-timber hybrid shear wall systems.

Reliability Evaluation Technique for Electrical Distribution Networks Considering Planned Outages

  • Hu, Bo;He, Xiao-Hui;Cao, Kan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1482-1488
    • /
    • 2014
  • The reliability evaluation of the electrical distribution networks (EDN) requires sufficient consideration of the effects of planned outages. The planned outages of the EDN can be divided, by outage models and their effects on the reliability into two major categories: by equipment and by feeder. After studying the characteristics of different categories of planned outages, this paper expands the classification of load points by outage time from 4 types to 7 types and defines corresponding reliability parameters for the different types. By using the section algorithm, this paper proposes a reliability evaluation technique of EDN considering equipment random failures and two categories of planned outages. The proposed technique has been applied to the RBTS-BUS6 test system and some practical EDNs in China. The study results demonstrate that the proposed technique is of higher practical value and can be used for evaluating the reliability performance of EDN more efficiently considering the planned outages.

A Study on the Failure and Life Assessment of High Speed Spindle (고속주축의 고장 및 수명평가에 관한 연구)

  • Lee, Tae Hong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.31 no.1
    • /
    • pp.67-73
    • /
    • 2014
  • A reliability evaluation or prediction can be defined as MTBF which stands for mean time between failures (Exclusively for repairable failures). Spindle system has huge effect on performance of machine tools and working quality as well as is required of high reliability. Especially, it takes great importance in producing automobiles which includes a large number of working processes. However, it is unusually difficult to predict reliability because there are lack of data and research about reliability of spindle system. Standards and methods of examinations for reliability evaluation of machine tools are scarce at local and abroad as well. Therefore, this research is meant to improve the reliability of spindle system before mass produced with developing standards of reliability and methods of examinations through FMEA to assess reliability of spindle system in prototype stages of developing high speed spindle system of machining center.