• 제목/요약/키워드: Performance and Cost Analysis.

검색결과 2,454건 처리시간 0.026초

대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석 (Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase)

  • 함남혁;여옥경;지규현
    • 한국BIM학회 논문집
    • /
    • 제8권3호
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

CART의 예측 성능:은행 및 보험 회사 데이터 사용 (The Prediction Performance of the CART Using Bank and Insurance Company Data)

  • 박정선
    • 한국정보처리학회논문지
    • /
    • 제3권6호
    • /
    • pp.1468-1472
    • /
    • 1996
  • 본 연구에서는 CART(Classification and Regression Tree)가 예측을 함에 있어 통계적인 기법인 discriminant analysis와 비교된다. 은행 데이터를 사용하는 경우 discriminant analysis가 더 나은 성능을 보여줬으며, 보험 회사 데이터를 사용한 경 우 CART가 더 나은 성능을 보여줬다. 이러한 모순된 결과가 데이터의 성격을 분석함 으로 해석된다. 본 연구에서는 두가지 모델 모두 사용된 매개변수들인 사전 확률, 데 이터, 타입 I/II오류 코스트, 검증 방법에 의해 성능의 차이를 보여줬다.

  • PDF

국산 저가형 실리카퓸을 이용한 고성능 콘크리트의 물리적 특성 분석 (Analysis of physical properties of high-performance concrete using domestic low-cost silica fume)

  • 김상도;윤경구;한승연;이겨레
    • 산업기술연구
    • /
    • 제37권1호
    • /
    • pp.32-36
    • /
    • 2017
  • In this study, as part of a research on the development of economical high-performance concrete with high strength and high quality, the physical properties of high-performance concrete were analyzed by substituting a certain amount of low-cost domestic silica fume exempted from the re-importation type distribution structure of the domestic production and the existing high-priced silica fume distribution structure. Performing tests to identify the physical properties of the fresh and hardened concrete and durability analogy of the concrete which use low-cost domestic silica fume and imported silica fume, the chloride ion penetration resistance test result showed that the strength difference between the low-cost silica fume and the imported silica fume is not big but the strength of the low-cost silica fume was measured higher than the imported silica fume. The chloride ion penetration resistance of all variables was measured as "very low". Since the low-cost domestic silica fume can be used as a high-performance admixture of concrete, the results suggest that it is possible to produce a more economical high-performance concrete.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

웹 기반의 품질코스트 관리시스템 구축 : 제1부;시스템 설계 (A Study on Implementation and Design of Web-based Web-Cost Management System: Part 1; Design)

  • 정영배;김연수;김준홍
    • 산업경영시스템학회지
    • /
    • 제27권3호
    • /
    • pp.97-105
    • /
    • 2004
  • The purpose of this study is to design and implement web-based quality cost management system to measure the performance of quality improvement activities in the business firms. The designed web-based quality cost management system which is also known as WQCMS (Web-based Q-Cost Management System) utilized newly classified objective performance indicator items to measure quality related activities. Well-classified performance measurement Indicator item lists which are played key role in the system was researched and standardized according to size and business categories of enterprise. Its code standards are based from fundamental PAF Model. Developed WQCMS have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. The proposed system was developed using Microsofi's .Net technology, ASP.NET and MS-SQL Server 2000. By web-enabling Q-cost management system, the effectiveness of the system management and utilization was realized by easiness of information Integration and economical efficiency.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

The need for upgrading the seismic performance objectives

  • Kutanis, Mustafa;Boru, Elif Orak
    • Earthquakes and Structures
    • /
    • 제7권4호
    • /
    • pp.401-414
    • /
    • 2014
  • The economic consequences of large earthquakes require a revolutionary change in the seismic performance objective of residential and commercial buildings. The majority of total construction costs consist of non-structural and architectural costs. Therefore, the aim of this research is to upgrade current Life Safety performance objectives and to offset adverse effects on country's economy after an occurrence of large earthquakes. However, such a proposal cannot easily prove the feasibility of cost-benefit analysis in structural design. In this paper, six generic reinforced concrete frames and dual system structures designed based on Turkish Seismic Code were used in cost analysis. The study reveals that load bearing structural systems with Immediate Occupancy performance level in seismic zones can be achieved with negligible costs.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

철도 R&D의 과학기술적 성과에 대한 횡단면 분석 (A cross - sectional analysis of scientific and technological performance for the railroad R&D)

  • 박만수;방윤석;권용장;문대섭;이희성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1582-1590
    • /
    • 2011
  • An analysis of the railroad industry for R&D investments has been insufficient whereas there are lots of analysis of accumulation of technology, economic performances and ripple effects for macroscopic view and other industry of R&D investments. This study decided intellectual rights, patent, and paper as common indicators of scientific and technological performances for setting up performance targets through surveying and analysis of preceding study and verified a appropriateness of scientific and technological performances for railroad R&D 11 projects which were successfully finished. Preceding study has been set up performance targets by research investments as input, but this study made a performance target by model through a cross-sectional and residual analysis of performances of railroad R&D 11 Projects in applying research investments, capital investments, inner labor cost and inner labor cost per man and research time as inputs, and verified a validity and a empirical analysis through analysis of other project.

  • PDF

천연가스/합성가스 이용 100 MWth 매체순환연소 복합발전 플랜트의 성능 및 경제성 평가 (Performance and Economic Analysis of Natural Gas/Syngas Fueled 100 MWth Chemical-Looping Combustion Combined Cycle Plant)

  • 박영철;이태용;박재현;류호정
    • Korean Chemical Engineering Research
    • /
    • 제47권1호
    • /
    • pp.65-71
    • /
    • 2009
  • 본 연구에서는 상용모사기를 이용하여 100 MWth 매체순환연소(CLC) 복합발전 플랜트의 성능 및 경제성 평가를 수행하였다. 원료로는 천연가스와 합성가스를 고려하였으며 원료에 따른 성능 및 발전단가를 비교, 분석하였다. 천연가스와 합성가스를 사용하는 경우 모두 발전 효율은 53~54% 수준으로 평가되었으며 이는 기존 연구와 부합하는 결과임을 확인하였다. 경제성 분석을 위해서 Chemical Engineering Plant Cost Index와 Guthrie 방법을 사용하여 장치비를 산정하였으며 합성가스의 저위발열량이 천연가스보다 낮기 때문에 장치비가 다소 높은 것을 확인하였다. 연료의 종류에 따른 발전단가 계산 결과 합성가스의 가격이 5.3 $/GJ 정도 되는 경우에 천연가스를 이용하는 경우의 발전단가인 5.8 ¢/kWh보다 낮아지는 것으로 나타났다.