• Title/Summary/Keyword: Peak operation

Search Result 810, Processing Time 0.032 seconds

Study of the Mitigation of Algae in Lake Uiam according to the Operation of the Chuncheon Dam and the Soyang Dam (춘천댐 및 소양강댐 운영에 따른 의암호 조류 저감 연구)

  • Lee, Dong Yeol;Baek, Kyong Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.171-179
    • /
    • 2022
  • In this study, the characteristics of algae mitigation according to dam operation were quantitatively analyzed for Uiam Lake, where the Chuncheon Dam is located upstream of the main stream, Uiam Dam is located downstream, and Soyang Dam is located in the tributary stream. Nine dam operation scenarios were applied to the event of the summer of 2018 (at that time an algae alert occurred) using the EFDC model, which is capable of calculating three-dimensional hydrodynamics and water quality levels such as those associated with chlorophyll-a. The dam operation scenarios were set to generate a flushing effect via discharges in the form of pulse waves from the upstream dams and by lowering the water level at the downstream dam. At Uiam Lake, the flushing effect was different depending on the operation of the dam, and the amount of algae reduction at each point was different owing to topographic characteristics and the different base water temperatures from BukHan River and Soyang River. With regard to a point located on the left bank, it was predicted that the peak level of chlorophyll-a would be reduced by approximately 50 % or more upon pulsed discharge at 50 m3/s for three days at Soyang Dam. However, for the right bank, the amount of discharge from Soyang Dam had little effect on algae mitigation. Therefore, an appropriate dam operation could be effective for algae mitigation at specific points in the water body where large dams exist upstream and downstream, such as at Uiam Lake, in an emergency situation in which algal blooms rapidly.

Development of On-tine Partial Discharge Monitoring System for High-Voltage Motor Stator Windings (고압 전동기 고정자 권선의 운전중 절연감시 시스템 개발)

  • Hwang, D.H.;Sim, W.Y.;Park, D.Y.;Gang, Dong-Sik;Kim, Y.J.;Song, S.O.;Kim, H.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11a
    • /
    • pp.224-226
    • /
    • 2001
  • In this paper, a novel high-voltage motor monitoring system (HVMMS) is proposed. This system monitors the insulation condition of the stator winding by on-line measurements of partial discharge (PD). Sensor, EMC (Epoxy-Mica Coupler) is used for PD measurement PD signals are continuously measured and digitized with a peak-hold A/D converter to build the database of the high-voltage motor's insulation condition. Also, this system can communicate with the central monitoring system via RS-485. This helps more efficient operation and maintenance of the generator.

  • PDF

Abnormal Operation Analysis of the Wolsong 2,3,4 Heat Transport System (월성 2,3,4호기 열수송계통의 비정상 운전 해석)

  • Shin, J.C.
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.15-22
    • /
    • 2016
  • The heat transport system transients of Wolsong 2,3,4 nuclear power plants were analysed during abnormal operating conditions. The compliance with requirements of AECB Regulatory Document R-77 for CANDU reactor was estimated. The analysis results showed that for each postulated accident the peak pressure values in the reactor headers are within the acceptance criteria given in ASME code requirements. The effect of LRV that is one of the overpressure protection device was very minor.

A Experimental Study on the Response Time Characteristics of Actuator in the Hydraulic Control System (유압제어계통의 액추에이터 응답시간 특성변화에 관한 실험적 연구)

  • Lee, Joo-Seong;Lee, Kye-Bock
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.1
    • /
    • pp.21-26
    • /
    • 2002
  • Response time of actuator in a hydraulic system may be important and necessary to avoid failures and to improve the efficiency of operation. Flow restricting devices can result in a decrease in the peak pressure, but may change the response time. The response time has an important effect on both operator and operator perceived smoothness. The response time should correspond to how fast a system responds to a given disturbance at the system boundary, Occasionally the appropriate response time is not easily determined. This study is on the characteristics of response time in the hydraulic system.

  • PDF

A Design of the Fuzzy Decision Maker Which Infers set Value of Fuel Rate in the Rotary Kiln for Making CaO (설회소성용 Rotary kiln에서 필요 연류량의 설정값 산정용 Fuzzy 판단자의 설계)

  • Lee, H.Y.;Peak, K.N.;Kim, C.
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.30B no.12
    • /
    • pp.51-58
    • /
    • 1993
  • This paper presents a design of the fuzzy decision maker which infers set value for fuel rate in the rotary kiln of making CaO. The fuzzy decision maker proposed are divided into two groups whose functions are different each other. The one operates when production demand is constant. The other deals with the status of varying production demand. We have chosen several variables used for composing condition and action part by investigating ingerent features of the rotary kiln and skilled operators`manual method of inferring fuel rate. Membership function of each variable was designed by analyzing experimental data and field data collected during two months. On-line operation with fuzzy rules suggested was done safely like human operators' action.

  • PDF

A MOSFET's Driver Applied to High-frequency Switching with Wide Range of Duty Cycles

  • Zhang, Zhao;Xie, Shaojun
    • Journal of Power Electronics
    • /
    • v.15 no.5
    • /
    • pp.1402-1408
    • /
    • 2015
  • A MOSFET's gate driver based on magnetic coupling is investigated. The gate driver can meet the demands in applications for wide range of duty cycles and high frequency. Fully galvanic isolation can be realized, and no auxiliary supply is needed. The driver is insensitive to the leakage inductor of the isolated transformer. No gate resistor is needed to damp the oscillation, and thus the peak output current of the gate driver can be improved. Design of the driving transformer can also be made more flexible, which helps to improve the isolation voltage between the power stage and the control electronics, and aids to enhance the electromagnetic compatibility. The driver's operation principle is analyzed, and the design method for its key parameters is presented. The performance analysis is validated via experiment. The disadvantages of the traditional magnetic coupling and optical coupling have been conquered through the investigated circuit.

The Stack Design Considering The Reactive Power Supply of Grid-Connected Inverter (계통 연계형 인버터의 무효전력 공급을 고려한 Stack 설계)

  • Koh, Kwang-Soo;Oh, Pil-Kyoung;Kim, Hee-Jung;Kim, Young-Min
    • Proceedings of the KIPE Conference
    • /
    • 2016.07a
    • /
    • pp.453-454
    • /
    • 2016
  • The ESS(Energy Storage System) connected with distributed generation is drawing attention due to improving the quality load leveling, peak shaving for enhancing reliability of the power grid. The grid-connected inverter makes frequency adjustment to the active power's charge discharge according to the load variation. In addition, the inverter is possible to act as a reactive power compensation device to eliminate harmonic operates as power factor change inhibiting, anti-transient voltage fluctuation, active filter. In this paper, we propose a design method of igbt stack considering the reactive power supply capacity to improve the quality and reliability of the inverter. Moreover, the grid-connected inverter considering the four-quadrant rated operation designed stack and verified the feasibility of the design through a thermal analysis.

  • PDF

Operation of Brushless DC Motor using the Adaptive hysteresis bandwidth control algorithm (적응 Hysteresis band폭 제어 알고리즘을 이용한 Brushless DC Motor의 운전)

  • Cho, Kye-Seok;Kim, Kwang-Yeon;Hyun, Dong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1991.11a
    • /
    • pp.171-174
    • /
    • 1991
  • Among the various PWM methods, the hysteresis-band current control PWM method is popularly used because of its simplicity of implementation, fast response characteristics and inherent peak current limiting capability. However, the current control PWM method with a fixed hysteresis-band has the disadvantage that switching frequency decreases and current ripple is high as the increasing of back-EMF. As a result, load current contains excess harmonics. This paper describes a adaptive hysteresis-bandwidth control algorithm so as to maintain the average switching frequency constant and decrease the current ripple where the hysteresis bandwidth is derived as a relation with the switching frequency. This control algorithm is applied to the surface-type brushless DC motor with separated winding and using the computer simulation, the validity of its algorithm is proved.

  • PDF

The development of 20 KW battery energy storage system (20 KW 전력저장전지시스템 개발)

  • Ko, Yo;Song, B.M.;Kim, J.E.;Kim, H.Y.;Eom, Y.C.
    • Proceedings of the KIEE Conference
    • /
    • 1990.11a
    • /
    • pp.206-209
    • /
    • 1990
  • The battery energy storage system has been studied and adopted actively by foreign advanced utilities to use off-peak energy. Korea electro-technology research institute & KEPCO developed a small scale battery energy storage system. This system is composed of a voltage type self commutating inverter and 180 cells of 500 AH lead acid battery. Using the result of operation of the system, we make a conceptual design of MW class system.

  • PDF

A Study on the Diversity Factor of Elevators in Apartment Housing (아파트에서의 승강기 수용률 설정에 관한 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.14 no.6
    • /
    • pp.93-97
    • /
    • 2000
  • This paper established the demand factor of elevator. For this purpose, it was analysed the operating pattern of elevator into power supply facility installed in the apartment. As a result, it is found that the simultaneous driving-rate of elevator peaked at September in a year and the average operation of 1 day recorded the 800 counts. Also, the peak-value of simultaneous driving-rate investigated about 40∼45%. Therefore, it was analysed that the demand factor of elevator are smaller than 10% by standard data.

  • PDF