The Transactions of the Korean Institute of Power Electronics
/
v.27
no.4
/
pp.339-347
/
2022
This study proposes the mitigation method for overcurrent and oscillation motor current in an active short-circuit operation. This operation is attracting attention as the safe state of electric vehicle traction inverters. However, the active short-circuit operation generates oscillation and overcurrent of motor currents during a transient state. The proposed method uses two different safe states in PMSM, such as active short circuit and freewheeling. The active short circuit is used for safe state in a steady state. To reduce the overshoot and oscillation, a freewheeling state is injected between active short-circuit operation by comparing the motor phase current with an analytically calculated steady-state motor current. Freewheeling state is only used in a transient state. The performance is demonstrated through simulations and experimental results. The peak current of the motor was reduced from 52 A to 40 A, and oscillation time was reduced.
The Transactions of the Korean Institute of Power Electronics
/
v.5
no.2
/
pp.184-191
/
2000
We discussed load CUlTent sharing for Master/Slave convertedMSC) type two DC-DC Converters parallel operation using a single current sensor method. In the conventional method, two CTs have been used to share t the load CUlTent equally with two coηverters‘ This paper presents a novel load CUlTent distribution method u using a single CUlTent sensor that can share load CUlTent effectively with only one CT in the Master-Slave C conveη:ers(MSCs) type. To confirm parallel operational performance of proposed DC-DC converters parallel operation, two experimental prototype converters were designed, implemented and experimented under three a arbitrary conditions. A load cur‘rent shahring perforrnance of the proposed method was compared with that of a c conventional peak CUt${\gamma}$ent method requmng two CTs. Those experimental results show that load cUlTent s sharing performance of paralleled two converters using a single CUlTent sensor was good and operated as well a as conventional method (ex, Pe밟 CUlTent Method)
The decrease in the summer peak electric load in our country is very important. The government has arranged and implemented a lot of support policies and statutes to decrease the peak electric load. And the ice-thermal-energy-storage system is known as one of the alternatives. The purpose of this paper is to evaluate the performance and the total efficiency of its storage tank, conducting the charging operation, the parallel operation and the single operation of a storage tank. The thermal energy density stored and discharging efficiency of a storage tank and the efficiency of total energy utilization of system are $18.4\;USRT-h/m^3$, 96.2% and 2028.7 kcal/kWh under the operation of design condition. When the storage tank is supplied more ice thermal energy than design condition, it is estimated that the efficiency of system are lower than the design condition by the supercooled effect.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.7
/
pp.1151-1160
/
2016
In recent years, the energy storage systems such as LiB, NaS, RFB(Redox-Flow Battery), Super- capacitor, pumped hydro storage, flywheel, CAES(Compressed Air Energy Storage) and so on have received great attention as practical solutions for the power supply problems. They can be used for various purpose of peak shaving, load leveling and frequency regulation, according to the characteristics of each ESS(energy storage system). This paper will focus at 1 MWh RFB system, which is being developed through the original technology project of energy material. The output of ESS is mainly characterized by C-rate, which means that the total rated capacity of battery will be delivered in 1 hour. And it is a very important factor in the ESS operation scheduling. There can be several options according to the operation intervals 15, 30 and 60minutes. The operation scheduling is based on the optimization to minimize the daily electricity cost. This paper analyzes the cost-saving effects by the each operating time-interval in case that the RFB ESS is optimally scheduled for peak shaving and load leveling.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.16
no.6
/
pp.574-583
/
2004
In this study, the operation strategy of the radiant floor cooling is evaluated in terms of indoor environmental conditions and energy consumption through simulations using the TRNSYS comparing the existing cooling operation. The operation strategy during continuously operated for cooling is proposed that a representative room had additional equipments and other rooms were operated with only a radiant floor cooling system and that system and control method for cooling are varied with period while intermittently operated for cooling. Specifically, when there are no people in the room, rooms were operated by only radiant floor cooling system using cooling storage and when people are occupied, rooms were operated by dehumidification and supplementary cooling device with radiant floor cooling system. The results of this study show that proposed operation strategy can stably maintain the set room air temperature and can reduce the energy consumption compared to the existing cooling method during continuously operated for cooling. While intermittently operated for cooling, the difference of set room air temperature by proposed operation strategy does not happen, satisfying comfort standards and the radiant floor cooling can expect to supply stable electric power because of decreasing demand for peak electric power of energy consumption.
This paper deals with the dead operation characteristics of the earth leakage circuit breaker(ELB) caused by impulse voltages. The surge protective devices for electronic circuit and AC power lines are becoming more widely used. It is possible to give rise to the malfunction of ELB due to the operation of surge protective devices, and the interruption of AC power lines brings about several disadvantages such as low reliability of electronic and informational systems, economical loss, and etc. The dead operation characteristics of the ELB from impulse voltages were measured under the conditions of KS C 4613 and the test circuit with a varistor. As a result, the peak current value of the zero-phase sequence circuit of the ELB is increased as the surge voltage and stray capacitance increase. All of the ELBs used in this work were satisfied with the lightning impulse dead operation test condition defined in KS C 4613. However one specimen only did not cause dead operation in the condition of the test circuit with a varistor. There is high possibility that a large portion of the ELBs connected with the AC power lines having the surge protective devices bring about the dead operation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.10
/
pp.1508-1516
/
2015
This paper proposes the optimal operation of ESS (Energy Storage System) in the substation of urban railway in an economical point of view. Since the load patterns of urban railway have different characteristics with the general power demand pattern, the characteristics motivate us to develop the optimal operation algorithm for ESS under Korean electricity billing system. We also introduce two different ESS operation strategies for peak load shaving and electricity consumption charge minimization respectively, and formulate each scheme. Historical data from Namgwangju substation are used for economical comparison of the strategies. The results show that the proposed algorithm is the most cost-effective ESS operation scheme among the strategies and reduces around 5 percent of electric charges compared to the charge without ESS operation.
Journal of the Architectural Institute of Korea Planning & Design
/
v.34
no.11
/
pp.45-55
/
2018
To reduce the energy consumption of HVAC system in buildings, thermally activated building system(TABS) has been applied to low energy building because of energy efficient performance and reduction of peak load. DOAS coupled with a parallel sensible cooling could be promising because TABS handles sensible heat load only. The purpose of this study was to evaluate the indoor thermal environment and cooling operation characteristic of TABS with dedicated outdoor air system(DOAS) in Korea climate. Indoor thermal environment and operation characteristic of TABS integrated with DOAS are investigated at different TABS operation schedules and climate conditions by simulation tests. The result shows that the DOAS is more suitable for hot and humid climates. And also it show that the potential of intermittent operation of TABS.
Owing to the reduction in the peak power of a DC railway subsystem, many studies on energy storage system (ESS) applications have received attention. Each application focuses on improving the efficiency and addressing regulation issues by utilizing the huge regenerative energy generated by braking-phase vehicles. The ESS applications are widely divided into installation on a vehicle or in a substation, depending on the target system characteristics. As the main purpose of the ESS application is to reduce the peak power of starting-phase vehicles, an optimized ESS utilization can be achieved by the operating at the highest peak power section. However, the weight of an entire vehicle, including those of the passengers, continuously changes during operation; thus, considering the total power consumption and the discharging point is difficult. As a contribution to the various storage device algorithms, this study deals with ESS on board vehicles and introduces an ESS operating plan for peak-power reduction by investigating the weight of a train on a real-time basis. This process is performed using a train-performance simulator, and the simulation accuracy can be increased because the weight in each phase can be adopted in the simulation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.6
/
pp.783-790
/
2012
Electric Vehicles(EVs) and Plug-in Hybrid Electric Vehicles(PHEVs) which have the grid connection capability, represent an important power system issue of charging demands. Analyzing impacts EVs charging demands of the power system such as increased peak demands, developed by means of modeling a stochastic distribution of charging and a demand dispatch calculation. Optimization processes proposed to determine optimal demand distribution portions so that charging costs and demand can possibly be managed. In order to solve the problems due to increasing charging demand at the peak time, alternative electricity rate such as Time-of-Use(TOU) rate has been in effect since last year. The TOU rate would in practice change the tendencies of charging time at the peak time. Nevertheless, since it focus only minimizing costs of charging from owners of the EVs, loads would be concentrated at times which have a lowest charging rate and would form a new peak load. The purpose of this paper is that to suggest a scenario of load leveling for a power system operator side. In case study results, the vehicles as regular load with time constraints, battery charging patterns and changed daily demand in the charging areas are investigated and optimization results are analyzed regarding cost and operation aspects by determining optimal demand distribution portions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.