• Title/Summary/Keyword: Peak load demand

Search Result 187, Processing Time 0.027 seconds

A Study on the Design, Fabrication and Characteristics Test of 25KJ Superconducting Magnetic Energy Storage (25KJ 초전도 에너지 저장장치의 설계,제작 및 특성 시험)

  • 홍원표;원종수;이송엽;이승원
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.37 no.10
    • /
    • pp.683-693
    • /
    • 1988
  • For the economical and reasonable operation of electric power system according to continual increase of electric power demand and decrease of load factor, the potential application of superconducting magnertic energy storage [SMES] with high efficiency and fast response in the electric utility is receiving attractive attension. In the light of this background, to confirm the basic principle of SMES, theoretical study, design technique and fabrication procedure for superconducting coil, current lead, cryostat, measuring and protection system of SMES are described in detail. Especially, a new design technique for superconducting coil and current lead is porposed and it was proved experimentally by the performance test of SMES which is developed for the first time in our country. At the peak operating current 200A, the maximum magnetic field amd stored energy of the coil are 3.52T and 2500J, espectively. The thermal and mechanical stability of 2500J SMES is also confirmed experimetally by its characteristics test, AC loss, protection system, charge and discharge test. The experimetal results show good characteristics of energy storage system.

  • PDF

Performance examination appraisal of gas driven engine heat pump(GHP) (GHP 성능 진단 평가)

  • Kim, Beom-Chan;Park, Jung-Ha;Kim, Sung-Soo;Kang, Yong-Tae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.376-381
    • /
    • 2007
  • GHP system utilize national gas as a heat source. It reduces electric peak demand in summer and maintains a constant performance in winter by recovering the waste heat from the engine. Although the initial investment cost of GHP is higher than that of EHP, the overall operating cost of GHP is cheaper than of the EHP. In this study, items for dissatisfaction were summarized based on the results of user questionnaire(200 users), and field tests were made for 10 GHP installation places. The measured COP was estimated much lower than the rated COP by the manufacturer mainly due to partial load operation.

  • PDF

Train-Fleet Assignment based on Public Interests (공공성을 고려한 열차용량 할당)

  • Oh Seog-Moon;Son Moo-Sung;Choi In-Chan;Choi In-Sang
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.602-609
    • /
    • 2005
  • In this paper, we consider the train-fleet assignment problem to determine fleet assignment and seat allocation synchronously. An integer programming model of the problem and a decomposition-based solution approach are developed to handle short-term period deterministic orgin-destination demands. The primary objective used in the developed model is to maximize the total number of passengers transported during peak load periods, such as Chuseok national holiday period. Thus, in developing the model we choose to profit-pursuing system. We also show how the proposed model can be readily modified to incorporate profit-maximization. Using the empirical data sets provided by a Korean railroad company, we have tested the proposed solution approach and carried out various comparison analyses by varying traffic demand patterns and train schedules. The computational experiments reveal that the proposed solutions approach produces high quality solutions in reasonable computation time.

Congestion and Loss Cost for the Market Participants (시장참여자별 혼잡 및 손실 비용 산정)

  • Son, Hyun-Il;Bae, In-Su;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2021-2027
    • /
    • 2011
  • Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. This paper proposes a method to compute the congestion and loss costs which are the key elements in economic assessment of the power system planning. And the benefit of market participants in CBP (Cost Based Pool) is computed. To demonstrate the efficient of the suggested methods, these methods are applied to peak load system of 2016 in the 4th Basic plan of Long-Them Electricity Supply and Demand.

KPX Operating Study Summer 2007 (2007년도 하절기 전력계통 운영방안)

  • Hwang, Bong-Hwan;Shin, Yong-Son;Cho, Jong-Man;Song, Seok-Ha
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.427-428
    • /
    • 2007
  • This paper presents a study for the Korea power system at yearly peak load time in 2007 summer period. The power system become more complex due to the gradual increment of power demand. We analyze various problems in power system operation, by the use of PSS/E(power flow, fault and transient stability study) and VSAT for voltage stability. The results of power system operating plans and countermeasures are described.

  • PDF

Extended TAM Analysis of a Residential DR Pilot Program (확장된 기술수용모델을 이용한 가정용 에너지 수요반응 프로그램 실증분석)

  • Jung, Euna;Lee, Kyungeun;Kim, Hwayoung;Jeong, Sora;Lee, Hyoseop;Suh, Bongwon;Rhee, Wonjong
    • Journal of the HCI Society of Korea
    • /
    • v.12 no.4
    • /
    • pp.65-73
    • /
    • 2017
  • While electricity demand is generally increasing, stably controlling supply is becoming a serious challenge because renewable energies are becoming popular and often their productions are dependent on the weather. The 'demand response' programs can be used to complement the problems of renewable energies, and therefore their role is becoming increasingly important. This study provides an analysis of a demand response pilot that was conducted in Korea. The study first focused on questionnaire surveys and in-depth interviews, and the data was used to perform a Technology Acceptance Model (TAM) analysis. The goal of the pilot was to have the residential users reduce their power consumptions when an energy reduction mission is issued during peak load hours. The experimental subjects consisted of two groups with different characteristics. Subjects in group A obtained smart meters as an optional function of IoT platform service provided by a mobile service company, and received a charge deduction as their compensation. Subjects in group B either voluntarily purchased smart meters as individuals or received them by participating in an energy self-sufficient village program that was run by a local government, and were entitled to a donation as their compensation. With the analysis, group A was found to fit the extended technology acceptance model that includes perceived playfulness in addition to perceived ease of use and perceived usefulness. On the contrary, group B failed to fit the model well, but perceived usefulness was found to be relatively more important compared to group A. The results indicate that the residential energy groups' behavior changes are dependent on each group's characteristics, and group-specific DR design should be considered to improve the effectiveness of DR.

Dynamic Peak Load Calculation for Friendly Environment Energy Supply and Demand Plan at the Newport Area in Busan (부산 신항만지역 환경친화적 에너지 수급을 위한 동적 열부하계산)

  • Yee, Jurng-Jae;Lee, Sun-Ae;Cho, Yong-Soo;Doe, Geun-Young
    • Journal of Navigation and Port Research
    • /
    • v.28 no.3
    • /
    • pp.269-276
    • /
    • 2004
  • The reclaimed land has peculiar characteristic of nature environment unlike midtown or inland and also, in comparison with inland, has bad weather condition, such as low temperature, strong wind, excessive sunshine, and moisture involved in a salt. Therefore the case of developing water front needs understanding characteristic of weather environment mused by reclamation in detail and proper development and organized maintenance. If development which doesn't investigate topographic and climate characteristic sufficiently is drove ahead, a rise of expense for energy and maintenance is going to be mused by deteriorating weather environmental, occurring a flaw of facility and calculating inaccurate capacity of facility. We looked into the weather state and drew up the standard weather data of the newport area in Busan which is reclaiming and developing now. In this research at the base qf the standard weather data, we calculate the dynamic peak loads for commerce, business and residence and then we utilize the results of the load calculation as basic information to determine facility capacity in the rear city of the newport area.

Hybrid Energy Storage System with Emergency Power Function of Standardization Technology (비상전원 기능을 갖는 하이브리드 에너지저장시스템 표준화 기술)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.2
    • /
    • pp.187-192
    • /
    • 2019
  • Hybrid power storage system with emergency power function for demand management and power outage minimizes the investment cost in the building of buildings and factories requiring emergency power generation facilities, We propose a new business model by developing technology that can secure economical efficiency by reducing power cost at all times. Normally, system power is supplied to load through STS (Static Transfer Switch), and PCS is connected to system in parallel to perform demand management. In order to efficiently operate the electric power through demand forecasting, the EMS issues a charge / discharge command to the ESS as a PMS (Power Management System), and the PMS transmits the command to the PCS controller to operate the system. During the power outage, the STS is rapidly disengaged from the system, and the PCS becomes an independent power supply and can supply constant voltage / constant frequency power to the load side. Therefore, it is possible to secure reliability through verification of actual system linkage and independent operation performance of hybrid ESS, By enabling low-carbon green growth technology to operate in conjunction with an efficient grid, it is possible to improve irregular power quality and contribute to peak load by generating renewable energy through ESS linkage. In addition, the ESS is replacing the frequency follow-up reserve, which is currently under the charge of coal-fired power generation, and thus it is anticipated that the operation cost of the LNG generator with high fuel cost can be reduced.

Operation Scheduling in a Commercial Building with Chiller System and Energy Storage System for a Demand Response Market (냉각 시스템 및 에너지 저장 시스템을 갖춘 상업용 빌딩의 수요자원 거래시장 대응을 위한 운영 스케줄링)

  • Son, Joon-Ho;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.8
    • /
    • pp.312-321
    • /
    • 2018
  • The Korean DR market proposes suppression of peak demand under reliability crisis caused a natural disaster or unexpected power plant accidents as well as saving power plant construction costs and expanding amount of reserve as utility's perspective. End-user is notified a DR event signal DR execution before one hour, and executes DR based on requested amount of load reduction. This paper proposes a DR energy management algorithm that can be scheduled the optimal operations of chiller system and ESS in the next day considering the TOU tariff and DR scheme. In this DR algorithm is divided into two scheduling's; day-ahead operation scheduling with temperature forecasting error and operation rescheduling on DR operation. In day-ahead operation scheduling, the operations of DR resources are scheduled based on the finite number of ambient temperature scenarios, which have been generated based on the historical ambient temperature data. As well as, the uncertainties in DR event including requested amount of load reduction and specified DR duration are also considered as scenarios. Also, operation rescheduling on DR operation day is proposed to ensure thermal comfort and the benefit of a COB owner. The proposed method minimizes the expected energy cost by a mixed integer linear programming (MILP).

A Study on the Economic Analysis of the Energy Storage System in Customer (수용가용 전력저장시스템의 경제성분석에 관한 연구)

  • Kim, Jeongho;Jang, Junoh
    • New & Renewable Energy
    • /
    • v.10 no.3
    • /
    • pp.47-54
    • /
    • 2014
  • Recently, BESS is considered as one of essential countermeasure for demand side management. However, an economic evaluation is critical issue for the introduction of power system because the cost of BESS is very high in present stage. Therefor, this paper presents economic evaluation method for customer use case by considering peak shaving function based on the real time price. From the case study on the model power system and educational customer, it is confirmed that the proposed method is a practical tool for the economic analysis of BESS. and analytical approach for the reliability assessment in radially operated distribution systems. The approach can estimate the expected reliability performance of distribution systems by a direct assessment of the configuration of the systems using the reliability indexes such as NDP (Non-Delivery Power) and NDE (Non-Delivery Energy). The indexes can only consider the number and configuration of the load, but can not consider the characteristics of the load which is the one of the most important factor in the investment cost for the distribution systems. Therefore, this paper presents the new performance indexes for the investment of the distribution facilities considering both the expected interruption cost for the load section and the operation characteristics of Energy Storage System. The results from a case study show that the proposed methods can be a practical tool for the reliability management in distribution systems including Energy Storage System.